UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 10-K
þ | ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 | |
For the Fiscal Year Ended December 31, 2011
OR | ||
¨ |
TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 | |
For the Transition Period from to |
Commission File Number |
Registrant, State of Incorporation, Address and Telephone Number |
I.R.S. Employer Identification No. | ||||||
1-3526 | The Southern Company | 58-0690070 | ||||||
(A Delaware Corporation) | ||||||||
30 Ivan Allen Jr. Boulevard, N.W. | ||||||||
Atlanta, Georgia 30308 | ||||||||
(404) 506-5000 | ||||||||
1-3164 | Alabama Power Company | 63-0004250 | ||||||
(An Alabama Corporation) | ||||||||
600 North 18th Street | ||||||||
Birmingham, Alabama 35291 | ||||||||
(205) 257-1000 | ||||||||
1-6468 | Georgia Power Company | 58-0257110 | ||||||
(A Georgia Corporation) | ||||||||
241 Ralph McGill Boulevard, N.E. | ||||||||
Atlanta, Georgia 30308 | ||||||||
(404) 506-6526 | ||||||||
001-31737 | Gulf Power Company | 59-0276810 | ||||||
(A Florida Corporation) | ||||||||
One Energy Place | ||||||||
Pensacola, Florida 32520 | ||||||||
(850) 444-6111 | ||||||||
001-11229 | Mississippi Power Company | 64-0205820 | ||||||
(A Mississippi Corporation) | ||||||||
2992 West Beach | ||||||||
Gulfport, Mississippi 39501 | ||||||||
(228) 864-1211 | ||||||||
333-98553 | Southern Power Company | 58-2598670 | ||||||
(A Delaware Corporation) | ||||||||
30 Ivan Allen Jr. Boulevard, N.W. | ||||||||
Atlanta, Georgia 30308 | ||||||||
(404) 506-5000 |
Securities registered pursuant to Section 12(b) of the Act:1
Each of the following classes or series of securities registered pursuant to Section 12(b) of the Act is listed on the New York Stock Exchange.
Title of each class |
Registrant | |||||
Common Stock, $5 par value | The Southern Company | |||||
Class A preferred, cumulative, $25 stated capital | Alabama Power Company | |||||
5.20% Series |
5.83% Series | |||||
5.30% Series |
||||||
Senior Notes | ||||||
5.875% Series 2007B |
||||||
Class A Preferred Stock, non-cumulative, Par value $25 per share |
Georgia Power Company | |||||
6 1/8% Series |
||||||
Senior Notes | ||||||
6.375% Series 2007D |
||||||
8.20% Series 2008C |
||||||
Senior Notes | Gulf Power Company | |||||
5.25% Series H |
||||||
5.75% Series 2011A |
||||||
Senior Notes | Mississippi Power Company | |||||
5 5/8% Series E |
||||||
Depositary preferred shares, each representing one-fourth of a share of preferred stock, cumulative, $100 par value |
||||||
5.25% Series |
||||||
Securities registered pursuant to Section 12(g) of the Act:1 | ||||||
Title of each class |
Registrant | |||||
Preferred stock, cumulative, $100 par value |
Alabama Power Company | |||||
4.20% Series 4.60% Series |
4.72% Series | |||||
4.52% Series 4.64% Series |
4.92% Series | |||||
Preferred stock, cumulative, $100 par value | Mississippi Power Company | |||||
4.40% Series 4.60% Series |
||||||
4.72% Series |
||||||
1 | As of December 31, 2011. |
Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.
Registrant |
Yes |
No | ||
The Southern Company |
X | |||
Alabama Power Company |
X | |||
Georgia Power Company |
X | |||
Gulf Power Company |
X | |||
Mississippi Power Company |
X | |||
Southern Power Company |
X |
Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act. Yes ¨ No x (Response applicable to all registrants.)
Indicate by check mark whether the registrants (1) have filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrants were required to file such reports), and (2) have been subject to such filing requirements for the past 90 days. Yes x No ¨
Indicate by check mark whether the registrants have submitted electronically and posted on their corporate web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T during the preceding 12 months (or for such shorter period that the registrants were required to submit and post such files). Yes x No ¨
Indicate by check mark if disclosure of delinquent filers pursuant to Item 405 of Regulation S-K is not contained herein, and will not be contained, to the best of registrants knowledge, in definitive proxy or information statements incorporated by reference in Part III of this Form 10-K or any amendment to this Form 10-K. ¨
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company. See the definitions of large accelerated filer, accelerated filer and smaller reporting company in Rule 12b-2 of the Exchange Act. (Check one):
Registrant |
Large Accelerated Filer |
Accelerated Filer |
Non-accelerated Filer |
Smaller Reporting Company | ||||
The Southern Company |
X | |||||||
Alabama Power Company |
X | |||||||
Georgia Power Company |
X | |||||||
Gulf Power Company |
X | |||||||
Mississippi Power Company |
X | |||||||
Southern Power Company |
X |
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes ¨ No x (Response applicable to all registrants.)
Aggregate market value of The Southern Companys common stock held by non-affiliates of The Southern Company at June 30, 2011: $34.6 billion. All of the common stock of the other registrants is held by The Southern Company. A description of each registrants common stock follows:
Registrant |
Description of Common Stock |
Shares Outstanding at January 31, 2012 |
||||
The Southern Company |
Par Value $5 Per Share |
866,573,913 | ||||
Alabama Power Company |
Par Value $40 Per Share |
30,537,500 | ||||
Georgia Power Company |
Without Par Value |
9,261,500 | ||||
Gulf Power Company |
Without Par Value |
4,542,717 | ||||
Mississippi Power Company |
Without Par Value |
1,121,000 | ||||
Southern Power Company |
Par Value $0.01 Per Share |
1,000 |
Documents incorporated by reference: specified portions of The Southern Companys Definitive Proxy Statement on Schedule 14A relating to the 2012 Annual Meeting of Stockholders are incorporated by reference into PART III. In addition, specified portions of the Definitive Information Statements on Schedule 14C of Alabama Power Company, Georgia Power Company, and Mississippi Power Company relating to each of their respective 2012 Annual Meetings of Shareholders are incorporated by reference into PART III.
Southern Power Company meets the conditions set forth in General Instructions I(1)(a) and (b) of Form 10-K and is therefore filing this Form 10-K with the reduced disclosure format specified in General Instructions I(2)(b), (c), and (d) of Form 10-K.
This combined Form 10-K is separately filed by The Southern Company, Alabama Power Company, Georgia Power Company, Gulf Power Company, Mississippi Power Company, and Southern Power Company. Information contained herein relating to any individual company is filed by such company on its own behalf. Each company makes no representation as to information relating to the other companies.
Page | ||||
I-1 | ||||
I-2 | ||||
I-4 | ||||
I-5 | ||||
I-5 | ||||
Territory Served by the Traditional Operating Companies and Southern Power |
I-6 | |||
I-8 | ||||
I-9 | ||||
I-9 | ||||
I-12 | ||||
I-16 | ||||
I-18 | ||||
I-32 | ||||
I-33 | ||||
I-37 | ||||
I-37 | ||||
I-38 | ||||
I-40 | ||||
I-41 | ||||
I-43 | ||||
II-1 | ||||
II-2 | ||||
Managements Discussion and Analysis of Financial Condition and Results of Operations |
II-3 | |||
II-3 | ||||
II-4 | ||||
Changes in and Disagreements with Accountants on Accounting and Financial Disclosure |
II-5 | |||
II-6 | ||||
II-7 | ||||
III-1 | ||||
III-4 | ||||
Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters |
III-40 | |||
Certain Relationships and Related Transactions, and Director Independence |
III-41 | |||
III-43 | ||||
IV-1 | ||||
IV-2 |
i
DEFINITIONS
When used in Items 1 through 5 and Items 9A through 15, the following terms will have the meanings indicated.
Term | Meaning | |
2010 ARP |
Alternative Rate Plan approved by the Georgia PSC for Georgia Power for the years 2011 through 2013 | |
Alabama Power |
Alabama Power Company | |
Clean Air Act |
Clean Air Act Amendments of 1990 | |
Code |
Internal Revenue Code of 1986, as amended | |
CPCN |
Certificate of Public Convenience and Necessity | |
Dalton |
Dalton Utilities | |
DOE |
United States Department of Energy | |
EPA |
United States Environmental Protection Agency | |
FERC |
Federal Energy Regulatory Commission | |
FMPA |
Florida Municipal Power Agency | |
FP&L |
Florida Power & Light Company | |
Georgia Power |
Georgia Power Company | |
Gulf Power |
Gulf Power Company | |
Hampton |
City of Hampton, Georgia | |
IBEW |
International Brotherhood of Electrical Workers | |
IGCC |
Integrated Coal Gasification Combined Cycle | |
IIC |
Intercompany Interchange Contract | |
IPP |
Independent Power Producer | |
IRP |
Integrated Resource Plan | |
Kemper IGCC |
IGCC facility under construction in Kemper County, Mississippi | |
KUA |
Kissimmee Utility Authority | |
KW |
Kilowatt | |
KWH |
Kilowatt-hour | |
MEAG Power |
Municipal Electric Authority of Georgia | |
Mississippi Power |
Mississippi Power Company | |
MW |
Megawatt | |
NRC |
Nuclear Regulatory Commission | |
OPC |
Oglethorpe Power Corporation | |
OUC |
Orlando Utilities Commission | |
Plant Vogtle Units 3 and 4 |
Two new nuclear generating units under construction at Plant Vogtle | |
power pool |
The operating arrangement whereby the integrated generating resources of the traditional operating companies and Southern Power are subject to joint commitment and dispatch in order to serve their combined load obligations | |
PowerSouth |
PowerSouth Energy Cooperative (formerly, Alabama Electric Cooperative, Inc.) | |
PPA |
Power Purchase Agreement |
ii
DEFINITIONS
(continued)
Term | Meaning | |
Progress Energy Florida |
Florida Power Corporation, d/b/a Progress Energy Florida, Inc. | |
PSC |
Public Service Commission | |
registrants |
Southern Company, Alabama Power, Georgia Power, Gulf Power, Mississippi Power, and Southern Power | |
RUS |
Rural Utilities Service (formerly Rural Electrification Administration) | |
SCS |
Southern Company Services, Inc. (the system service company) | |
SEC |
Securities and Exchange Commission | |
SEGCO |
Southern Electric Generating Company | |
SEPA |
Southeastern Power Administration | |
SERC |
Southeastern Electric Reliability Council | |
SMEPA |
South Mississippi Electric Power Association | |
Southern Company |
The Southern Company | |
Southern Company system |
Southern Company, the traditional operating companies, Southern Power, SEGCO, Southern Nuclear, SCS, SouthernLINC Wireless, and other subsidiaries | |
Southern Holdings |
Southern Company Holdings, Inc. | |
SouthernLINC Wireless |
Southern Communications Services, Inc. | |
Southern Nuclear |
Southern Nuclear Operating Company, Inc. | |
Southern Power |
Southern Power Company | |
SRE |
Southern Renewable Energy, Inc. | |
traditional operating companies |
Alabama Power, Georgia Power, Gulf Power, and Mississippi Power |
iii
CAUTIONARY STATEMENT REGARDING
FORWARD-LOOKING INFORMATION
This Annual Report on Form 10-K contains forward-looking statements. Forward-looking statements include, among other things, statements concerning the strategic goals for the wholesale business, retail sales, retail rates, customer growth, economic recovery, fuel and environmental cost recovery and other rate actions, current and proposed environmental regulations and related estimated expenditures, future earnings, dividend payout ratios, access to sources of capital, projections for the qualified pension plan, postretirement benefit plan, and nuclear decommissioning trust fund contributions, financing activities, start and completion of construction projects, plans and estimated costs for new generation resources, filings with state and federal regulatory authorities, impact of the Small Business Jobs and Credit Act of 2010, impact of the Tax Relief, Unemployment Insurance Reauthorization, and Job Creation Act of 2010, estimated sales and purchases under new power sale and purchase agreements, storm damage cost recovery and repairs, and estimated construction and other expenditures. In some cases, forward-looking statements can be identified by terminology such as may, will, could, should, expects, plans, anticipates, believes, estimates, projects, predicts, potential, or continue or the negative of these terms or other similar terminology. There are various factors that could cause actual results to differ materially from those suggested by the forward-looking statements; accordingly, there can be no assurance that such indicated results will be realized. These factors include:
| the impact of recent and future federal and state regulatory changes, including legislative and regulatory initiatives regarding deregulation and restructuring of the electric utility industry, implementation of the Energy Policy Act of 2005, environmental laws including regulation of water, coal combustion byproducts, and emissions of sulfur, nitrogen, carbon, soot, particulate matter, hazardous air pollutants, including mercury, and other substances, financial reform legislation, and also changes in tax and other laws and regulations to which Southern Company and its subsidiaries are subject, as well as changes in application of existing laws and regulations; |
| current and future litigation, regulatory investigations, proceedings, or inquiries, including the pending EPA civil actions against certain Southern Company subsidiaries, FERC matters, and Internal Revenue Service and state tax audits; |
| the effects, extent, and timing of the entry of additional competition in the markets in which Southern Companys subsidiaries operate; |
| variations in demand for electricity, including those relating to weather, the general economy and recovery from the recent recession, population and business growth (and declines), and the effects of energy conservation measures; |
| available sources and costs of fuels; |
| effects of inflation; |
| ability to control costs and avoid cost overruns during the development and construction of facilities; |
| investment performance of Southern Companys employee benefit plans and nuclear decommissioning trust funds; |
| advances in technology; |
| state and federal rate regulations and the impact of pending and future rate cases and negotiations, including rate actions relating to fuel and other cost recovery mechanisms; |
| regulatory approvals and actions related to the Plant Vogtle Units 3 and 4, including Georgia PSC approvals, NRC actions, and potential DOE loan guarantees; |
| regulatory approvals and actions related to the Kemper IGCC, including Mississippi PSC approvals, potential DOE loan guarantees, the SMEPA purchase decision, and utilization of investment tax credits; |
| the performance of projects undertaken by the non-utility businesses and the success of efforts to invest in and develop new opportunities; |
| internal restructuring or other restructuring options that may be pursued; |
| potential business strategies, including acquisitions or dispositions of assets or businesses, which cannot be assured to be completed or beneficial to Southern Company or its subsidiaries; |
| the ability of counterparties of Southern Company and its subsidiaries to make payments as and when due and to perform as required; |
| the ability to obtain new short- and long-term contracts with wholesale customers; |
| the direct or indirect effect on Southern Companys business resulting from terrorist incidents and the threat of terrorist incidents, including cyber intrusion; |
| interest rate fluctuations and financial market conditions and the results of financing efforts, including Southern Companys and its subsidiaries credit ratings; |
| the impacts of any potential U.S. credit rating downgrade or other sovereign financial issues, including impacts on interest rates, access to capital markets, impacts on currency exchange rates, counterparty performance, and the economy in general, as well as potential impacts on the availability or benefits of proposed DOE loan guarantees; |
| the ability of Southern Company and its subsidiaries to obtain additional generating capacity at competitive prices; |
iv
| catastrophic events such as fires, earthquakes, explosions, floods, hurricanes, droughts, pandemic health events such as influenzas, or other similar occurrences; |
| the direct or indirect effects on Southern Companys business resulting from incidents affecting the U.S. electric grid or operation of generating resources; |
| the effect of accounting pronouncements issued periodically by standard setting bodies; and |
| other factors discussed elsewhere herein and in other reports filed by the registrants from time to time with the SEC. |
The registrants expressly disclaim any obligation to update any forward-looking statements.
v
Southern Company was incorporated under the laws of Delaware on November 9, 1945. Southern Company is domesticated under the laws of Georgia and is qualified to do business as a foreign corporation under the laws of Alabama. Southern Company owns all of the outstanding common stock of Alabama Power, Georgia Power, Gulf Power, and Mississippi Power, each of which is an operating public utility company. The traditional operating companies supply electric service in the states of Alabama, Georgia, Florida, and Mississippi. More particular information relating to each of the traditional operating companies is as follows:
Alabama Power is a corporation organized under the laws of the State of Alabama on November 10, 1927, by the consolidation of a predecessor Alabama Power Company, Gulf Electric Company, and Houston Power Company. The predecessor Alabama Power Company had been in continuous existence since its incorporation in 1906.
Georgia Power was incorporated under the laws of the State of Georgia on June 26, 1930 and was admitted to do business in Alabama on September 15, 1948.
Gulf Power is a Florida corporation that has had a continuous existence since it was originally organized under the laws of the State of Maine on November 2, 1925. Gulf Power was admitted to do business in Florida on January 15, 1926, in Mississippi on October 25, 1976, and in Georgia on November 20, 1984. Gulf Power became a Florida corporation after being domesticated under the laws of the State of Florida on November 2, 2005.
Mississippi Power was incorporated under the laws of the State of Mississippi on July 12, 1972, was admitted to do business in Alabama on November 28, 1972, and effective December 21, 1972, by the merger into it of the predecessor Mississippi Power Company, succeeded to the business and properties of the latter company. The predecessor Mississippi Power Company was incorporated under the laws of the State of Maine on November 24, 1924 and was admitted to do business in Mississippi on December 23, 1924 and in Alabama on December 7, 1962.
In addition, Southern Company owns all of the common stock of Southern Power, which is also an operating public utility company. Southern Power constructs, acquires, owns, and manages generation assets, including renewable energy projects, and sells electricity at market-based rates in the wholesale market. Southern Power is a corporation organized under the laws of Delaware on January 8, 2001 and was admitted to do business in the States of Alabama, Florida, and Georgia on January 10, 2001, in the State of Mississippi on January 30, 2001, in the State of North Carolina on February 19, 2007, in the State of South Carolina on March 31, 2009, in the State of Texas on October 26, 2009, and in the State of New Mexico on February 11, 2010.
Southern Company also owns all of the outstanding common stock or membership interests of SouthernLINC Wireless, Southern Nuclear, SCS, Southern Holdings, and other direct and indirect subsidiaries. SouthernLINC Wireless provides digital wireless communications for use by Southern Company and its subsidiary companies and markets these services to the public and also provides wholesale fiber optic solutions to telecommunication providers in the Southeast. Southern Nuclear operates and provides services to Alabama Powers and Georgia Powers nuclear plants and is currently developing new nuclear generation at Plant Vogtle, which is co-owned by Georgia Power. SCS is the system service company providing, at cost, specialized services to Southern Company and its subsidiary companies. Southern Holdings is an intermediate holding subsidiary primarily for Southern Companys investments in leveraged leases.
Alabama Power and Georgia Power each own 50% of the outstanding common stock of SEGCO. SEGCO is an operating public utility company that owns electric generating units with an aggregate capacity of 1,019,680 KWs at Plant Gaston on the Coosa River near Wilsonville, Alabama. Alabama Power and Georgia Power are each entitled to one-half of SEGCOs capacity and energy. Alabama Power acts as SEGCOs agent in the operation of SEGCOs units and furnishes coal to SEGCO as fuel for its units. SEGCO also owns one 230,000 volt transmission line extending from Plant Gaston to the Georgia state line at which point connection is made with the Georgia Power transmission line system.
I-1
Southern Companys segment information is included in Note 12 to the financial statements of Southern Company in Item 8 herein.
The registrants Annual Reports on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K, and all amendments to those reports are made available on Southern Companys website, free of charge, as soon as reasonably practicable after such material is electronically filed with or furnished to the SEC. Southern Companys internet address is www.southerncompany.com.
Traditional Operating Companies
The traditional operating companies own generation, transmission, and distribution facilities. See PROPERTIES in Item 2 herein for additional information on the traditional operating companies generating facilities. Each companys transmission facilities are connected to the respective companys own generating plants and other sources of power (including certain generating plants owned by Southern Power) and are interconnected with the transmission facilities of the other traditional operating companies and SEGCO. For information on the State of Georgias integrated transmission system, see Territory Served by the Traditional Operating Companies and Southern Power herein.
Agreements in effect with principal neighboring utility systems provide for capacity and energy transactions that may be entered into from time to time for reasons related to reliability or economics. Additionally, the traditional operating companies have entered into voluntary reliability agreements with the subsidiaries of Entergy Corporation, Florida Electric Power Coordinating Group, and Tennessee Valley Authority and with Carolina Power & Light Company (d/b/a Progress Energy Carolinas, Inc.), Duke Energy Corporation, South Carolina Electric & Gas Company, and Virginia Electric and Power Company, each of which provides for the establishment and periodic review of principles and procedures for planning and operation of generation and transmission facilities, maintenance schedules, load retention programs, emergency operations, and other matters affecting the reliability of bulk power supply. The traditional operating companies have joined with other utilities in the Southeast (including some of those referred to above) to form the SERC to augment further the reliability and adequacy of bulk power supply. Through the SERC, the traditional operating companies are represented on the National Electric Reliability Council.
The utility assets of the traditional operating companies and certain utility assets of Southern Power are operated as a single integrated electric system, or power pool, pursuant to the IIC. Activities under the IIC are administered by SCS, which acts as agent for the traditional operating companies and Southern Power. The fundamental purpose of the power pool is to provide for the coordinated operation of the electric facilities in an effort to achieve the maximum possible economies consistent with the highest practicable reliability of service. Subject to service requirements and other operating limitations, system resources are committed and controlled through the application of centralized economic dispatch. Under the IIC, each traditional operating company and Southern Power retains its lowest cost energy resources for the benefit of its own customers and delivers any excess energy to the power pool for use in serving customers of other traditional operating companies or Southern Power or for sale by the power pool to third parties. The IIC provides for the recovery of specified costs associated with the affiliated operations thereunder, as well as the proportionate sharing of costs and revenues resulting from power pool transactions with third parties.
Southern Company, each traditional operating company, Southern Power, Southern Nuclear, SEGCO, and other subsidiaries have contracted with SCS to furnish, at direct or allocated cost and upon request, the following services: general and design engineering, operations, purchasing, accounting, finance and treasury, tax, information technology, marketing, auditing, insurance and pension administration, human resources, systems and procedures, digital wireless communications, and other services with respect to business and operations and power pool transactions. Southern Power and SouthernLINC Wireless have also secured from the traditional operating companies certain services which are furnished at cost and, in the case of Southern Power, which are subject to FERC regulations, in compliance with such regulations.
I-2
Alabama Power and Georgia Power each have a contract with Southern Nuclear to operate Plant Farley and Plants Hatch and Vogtle, respectively. In addition, Georgia Power has a contract with Southern Nuclear to develop, license, construct, and operate Plant Vogtle Units 3 and 4. See Regulation Nuclear Regulation herein for additional information.
Southern Power
Southern Power is an electric wholesale generation subsidiary with market-based rate authority from the FERC. Southern Power constructs, acquires, owns, and manages generation assets, including renewable energy projects, and sells electricity at market-based prices in the wholesale market. Southern Powers business activities are not subject to traditional state regulation like the traditional operating companies but are subject to regulation by the FERC. Southern Power has attempted to insulate itself from significant fuel supply, fuel transportation, and electric transmission risks by generally making such risks the responsibility of the counterparties to its PPAs. However, Southern Powers future earnings will depend on the parameters of the wholesale market and the efficient operation of its wholesale generating assets. For additional information on Southern Powers business activities, see MANAGEMENTS DISCUSSION AND ANALYSIS OVERVIEW Business Activities of Southern Power in Item 7 herein.
Southern Power is constructing a 720 MW electric generating plant in Cleveland County, North Carolina. This new plant is expected to go into commercial operation in December 2012. The total estimated construction cost is expected to be between $335 million and $365 million.
Southern Power is constructing a biomass generating plant in Sacul, Texas with an estimated capacity of 100 MWs. The generating plant will be fueled from wood waste and is expected to begin commercial operation in June 2012. The total estimated cost of the project is expected to be between $470 million and $490 million.
On March 15, 2011, Southern Company transferred its ownership in its wholly-owned subsidiary, SRE, to Southern Power. SRE was formed in January 2010 to construct, acquire, own, and manage renewable generation assets and sell electricity at market-based prices in the wholesale market. In March 2010, SRE and Turner Renewable Energy, Inc., through a subsidiary, entered into an engineering, construction, and procurement agreement with First Solar, Inc. for Plant Cimarron, a 30 MW solar photovoltaic plant near Cimarron, New Mexico, and assumed the associated PPA. In November 2010, Plant Cimarron began commercial operation. The transfer of net assets was accounted for by Southern Power as a transfer of net assets among entities under common control; therefore, the assets and liabilities of SRE were transferred from Southern Company to Southern Power at historical cost. The consolidated financial statements of Southern Power have been revised to include the financial condition and the results of operations of SRE since its inception in January 2010.
As of December 31, 2011, Southern Power had 7,908 MWs of nameplate capacity in commercial operation.
Other Businesses
Southern Holdings is an intermediate holding subsidiary primarily for Southern Companys investments in leveraged leases.
SouthernLINC Wireless provides digital wireless communications for use by Southern Company and its subsidiary companies and markets its services to non-affiliates within the Southeast. SouthernLINC Wireless delivers multiple wireless communication options including push to talk, cellular service, text messaging, wireless internet access, and wireless data. Its system covers approximately 127,000 square miles in the Southeast. SouthernLINC Wireless also provides wholesale fiber optic solutions to telecommunication providers in the Southeast under the name Southern Telecom.
These efforts to invest in and develop new business opportunities offer potential returns exceeding those of rate-regulated operations. However, these activities also involve a higher degree of risk.
I-3
The subsidiary companies of Southern Company are engaged in continuous construction programs to accommodate existing and estimated future loads on their respective systems. For estimated construction and environmental expenditures for the periods 2012 through 2014, see MANAGEMENTS DISCUSSION AND ANALYSIS FINANCIAL CONDITION AND LIQUIDITY Capital Requirements and Contractual Obligations and Note 7 to the financial statements of Southern Company and each traditional operating company under Construction Program and Note 7 to the financial statements of Southern Power under Expansion Program in Item 8 herein. The Southern Company systems construction program consists of a base level capital investment and capital expenditures to comply with existing environmental statutes and regulations. In 2012, the base level capital investment and capital expenditures are expected to be apportioned approximately as follows:
Southern Company system * |
Alabama Power |
Georgia Power |
Gulf Power |
Mississippi Power |
Southern Power |
|||||||||||||||||||
(in millions) | ||||||||||||||||||||||||
New Generation |
$2,325 | $1 | $861 | $0 | $1,335 | $128 | ||||||||||||||||||
Environmental ** |
425 | 22 | 237 | 200 | 87 | | ||||||||||||||||||
Transmission & Distribution Growth |
550 | 160 | 337 | 40 | 13 | | ||||||||||||||||||
Maintenance (Generation, Transmission, and Distribution) |
1,233 | 488 | 532 | 147 | 52 | | ||||||||||||||||||
Long-Term Service Agreements Capital |
126 | 47 | 51 | | | 28 | ||||||||||||||||||
Nuclear fuel |
333 | 135 | 198 | | | | ||||||||||||||||||
General plant |
275 | 84 | 87 | 15 | 9 | 31 | ||||||||||||||||||
Total |
$5,267 | $937 | $2,303 | $402 | $1,496 | $187 |
* | These amounts include the amounts for the traditional operating companies and Southern Power (as detailed in the table above) as well as the amounts for the other subsidiaries. See Other Businesses herein for additional information. |
** | The 2012 base level capital investments for Georgia Power, Gulf Power, and Mississippi Power include certain environmental compliance investments associated with the EPAs Mercury and Air Toxics Standards (MATS) rule (formerly referred to as the Utility Maximum Achievable Control Technology rule). The 2012 base level capital investment for Alabama Power does not include potential incremental environmental compliance investments associated with complying with the MATS rule. The Southern Company system is assessing the potential costs of complying with the MATS rule, as well as the EPAs proposed water and coal combustion byproducts rules. The potential incremental environmental compliance investments in 2012, based on the assumption that coal combustion byproducts will continue to be regulated as non-hazardous solid waste under the proposed rule, are as follows: |
Southern Company system |
Alabama Power |
Georgia Power |
Gulf Power |
Mississippi Power | ||||||||
(in millions) | ||||||||||||
MATS rule |
Up to $370 | Up to $170 | | Up to $45 | Up to $30 | |||||||
Proposed water and coal combustion byproducts rules |
Up to $40 | Up to $5 | Up to $30 | Up to $5 | Up to $1 | |||||||
Total potential incremental environmental compliance investments |
Up to $410 | Up to $175 | Up to $30 | Up to $50 | Up to $31 |
For Southern Power, any incremental investments to comply with existing statutes and regulations, the MATS rule, or anticipated new environmental regulations in 2012 are expected to be immaterial.
I-4
The construction programs are subject to periodic review and revision, and actual construction costs may vary from these estimates because of numerous factors. These factors include: changes in business conditions; changes in load projections; changes in environmental statutes and regulations; the outcome of any legal challenges to the environmental rules; changes in generating plants, including unit retirements and replacements, to meet new regulatory requirements; changes in FERC rules and regulations; PSC approvals; changes in legislation; the cost and efficiency of construction labor, equipment, and materials; project scope and design changes; storm impacts; and the cost of capital. In addition, there can be no assurance that costs related to capital expenditures will be fully recovered.
See Regulation Environmental Statutes and Regulations herein for additional information with respect to certain existing and proposed environmental requirements and PROPERTIES Jointly-Owned Facilities in Item 2 herein for additional information concerning Alabama Powers, Georgia Powers, and Southern Powers joint ownership of certain generating units and related facilities with certain non-affiliated utilities.
See each of the registrants MANAGEMENTS DISCUSSION AND ANALYSIS FINANCIAL CONDITION AND LIQUIDITY in Item 7 herein and Note 6 to the financial statements of each registrant in Item 8 herein for information concerning financing programs.
The traditional operating companies and SEGCOs supply of electricity is derived mainly from coal. Southern Powers supply of electricity is primarily fueled by natural gas. See MANAGEMENTS DISCUSSION AND ANALYSIS RESULTS OF OPERATION Electricity Business Fuel and Purchased Power Expenses of Southern Company and MANAGEMENTS DISCUSSION AND ANALYSIS RESULTS OF OPERATION Fuel and Purchased Power Expenses of each traditional operating company in Item 7 herein for information regarding the electricity generated and the average cost of fuel in cents per net kilowatt-hour generated for the years 2009 through 2011.
The traditional operating companies have agreements in place from which they expect to receive substantially all of their coal burn requirements in 2012. These agreements have terms ranging between one and eight years. In 2011, the weighted average sulfur content of all coal burned by the traditional operating companies was 0.80% sulfur. This sulfur level, along with banked and purchased sulfur dioxide allowances, allowed the traditional operating companies to remain within limits set by Phase I of the Clean Air Interstate Rule (CAIR) under the Clean Air Act. In 2011, the Southern Company system purchased approximately 563 tons of sulfur dioxide allowances and 3,096 tons of seasonal nitrogen oxide emission allowances to be used in current and future periods. As additional environmental regulations are proposed that impact the utilization of coal, the traditional operating companies fuel mix will be monitored to ensure that the traditional operating companies remain in compliance with applicable laws and regulations. Additionally, Southern Company and the traditional operating companies will continue to evaluate the need to purchase additional emissions allowances, the timing of capital expenditures for emissions control equipment, and potential unit retirements and replacements. See MANAGEMENTS DISCUSSION AND ANALYSIS FUTURE EARNINGS POTENTIAL Environmental Matters of Southern Company and each traditional operating company in Item 7 herein for information on the Clean Air Act, the MATS rule, the Cross State Air Pollution Rule (CSAPR), CAIR, the proposed water and coal combustion byproducts rules, and global climate issues.
SCS, acting on behalf of the traditional operating companies and Southern Power, has agreements in place for the natural gas burn requirements of the Southern Company system. For 2012, SCS has contracted for 378 billion cubic feet of natural gas supply under agreements with remaining terms up to nine years. In addition to natural gas supply, SCS has contracts in place for both firm natural gas transportation and storage. Management believes that these contracts provide sufficient natural gas supplies, transportation, and storage to ensure normal operations of the Southern Company systems natural gas generating units.
Changes in fuel prices to the traditional operating companies are generally reflected in fuel adjustment clauses contained in rate schedules. See Rate Matters Rate Structure and Cost Recovery Plans herein for additional information. Southern Powers PPAs generally provide that the counterparty is responsible for substantially all of the cost of fuel.
I-5
Alabama Power and Georgia Power have numerous contracts covering a portion of their nuclear fuel needs for uranium, conversion services, enrichment services, and fuel fabrication. These contracts have varying expiration dates and most of them are for less than 10 years. Management believes that sufficient capacity for nuclear fuel supplies and processing exists to preclude the impairment of normal operations of the Southern Company systems nuclear generating units.
Alabama Power and Georgia Power have contracts with the United States, acting through the DOE, that provide for the permanent disposal of spent nuclear fuel. The DOE failed to begin disposing of spent fuel in 1998, as required by the contracts, and Alabama Power and Georgia Power have pursued and are pursuing legal remedies against the government for breach of contract. See Note 3 to the financial statements of Southern Company, Alabama Power, and Georgia Power under Nuclear Fuel Disposal Costs in Item 8 herein for additional information.
Territory Served by the Traditional Operating Companies and Southern Power
The territory in which the traditional operating companies provide electric service comprises most of the states of Alabama and Georgia together with the northwestern portion of Florida and southeastern Mississippi. In this territory there are non-affiliated electric distribution systems which obtain some or all of their power requirements either directly or indirectly from the traditional operating companies. The territory has an area of approximately 120,000 square miles and an estimated population of approximately 16 million. Southern Power sells electricity at market-based prices in the wholesale market primarily to investor-owned utilities, IPPs, municipalities, and electric cooperatives.
Alabama Power is engaged, within the State of Alabama, in the generation and purchase of electricity and the transmission, distribution, and sale of such electricity, at retail in approximately 400 cities and towns (including Anniston, Birmingham, Gadsden, Mobile, Montgomery, and Tuscaloosa), as well as in rural areas, and at wholesale to 15 municipally-owned electric distribution systems, 11 of which are served indirectly through sales to Alabama Municipal Electric Authority, and two rural distributing cooperative associations. Alabama Power owns coal reserves near its Plant Gorgas and uses the output of coal from the reserves in its generating plants. Alabama Power also sells, and cooperates with dealers in promoting the sale of, electric appliances.
Georgia Power is engaged in the generation and purchase of electricity and the transmission, distribution, and sale of such electricity within the State of Georgia, at retail in over 600 communities (including Athens, Atlanta, Augusta, Columbus, Macon, Rome, and Savannah), as well as in rural areas, and at wholesale currently to OPC, MEAG Power, Dalton, Hampton, various electric membership corporations, and non-affiliated utilities.
Gulf Power is engaged, within the northwestern portion of Florida, in the generation and purchase of electricity and the transmission, distribution, and sale of such electricity, at retail in 71 communities (including Pensacola, Panama City, and Fort Walton Beach), as well as in rural areas, and at wholesale to a non-affiliated utility and a municipality.
Mississippi Power is engaged in the generation and purchase of electricity and the transmission, distribution, and sale of such electricity within 23 counties in southeastern Mississippi, at retail in 123 communities (including Biloxi, Gulfport, Hattiesburg, Laurel, Meridian, and Pascagoula), as well as in rural areas, and at wholesale to one municipality, six rural electric distribution cooperative associations, and one generating and transmitting cooperative.
For information relating to KWH sales by customer classification for the traditional operating companies, see MANAGEMENTS DISCUSSION AND ANALYSIS RESULTS OF OPERATIONS of each traditional operating company in Item 7 herein. Also, for information relating to the sources of revenues for Southern Company, each traditional operating company, and Southern Power, reference is made to Item 7 herein.
The RUS has authority to make loans to cooperative associations or corporations to enable them to provide electric service to customers in rural sections of the country. There are 71 electric cooperative organizations operating in the territory in which the traditional operating companies provide electric service at retail or wholesale.
I-6
One of these organizations, PowerSouth, is a generating and transmitting cooperative selling power to several distributing cooperatives, municipal systems, and other customers in south Alabama and northwest Florida. PowerSouth owns generating units with approximately 2,027 MWs of nameplate capacity, including an undivided 8.16% ownership interest in Alabama Powers Plant Miller Units 1 and 2. PowerSouths facilities were financed with RUS loans secured by long-term contracts requiring distributing cooperatives to take their requirements from PowerSouth to the extent such energy is available.
Alabama Power and Gulf Power have entered into separate agreements with PowerSouth involving interconnection between their respective systems. The delivery of capacity and energy from PowerSouth to certain distributing cooperatives in the service territories of Alabama Power and Gulf Power is governed by the Southern Company/PowerSouth Network Transmission Service Agreement. The rates for this service to PowerSouth are on file with the FERC. See PROPERTIES Jointly-Owned Facilities in Item 2 herein for details of Alabama Powers joint-ownership with PowerSouth of a portion of Plant Miller.
Four electric cooperative associations, financed by the RUS, operate within Gulf Powers service territory. These cooperatives purchase their full requirements from PowerSouth and SEPA (a federal power marketing agency). A non-affiliated utility also operates within Gulf Powers service territory and purchases its full requirements from Gulf Power.
Mississippi Power has an interchange agreement with SMEPA, a generating and transmitting cooperative, pursuant to which various services are provided, including the furnishing of protective capacity by Mississippi Power to SMEPA. In July 2010, Mississippi Power and SMEPA entered into an asset purchase agreement whereby SMEPA agreed to purchase an undivided 17.5% interest in the Kemper IGCC. The closing of this transaction is conditioned upon execution of a joint ownership and operating agreement, receipt of all construction permits, appropriate regulatory approvals, financing, and other conditions. In December 2010, Mississippi Power and SMEPA filed a joint petition with the Mississippi PSC requesting regulatory approval for SMEPAs 17.5% ownership of the Kemper IGCC.
There are also 65 municipally-owned electric distribution systems operating in the territory in which the traditional operating companies provide electric service at retail or wholesale.
Forty-eight municipally-owned electric distribution systems and one county-owned system receive their requirements through MEAG Power, which was established by a Georgia state statute in 1975. MEAG Power serves these requirements from self-owned generation facilities, some of which are jointly-owned with Georgia Power, and purchases from other resources. MEAG Power also has a pseudo scheduling and services agreement with Georgia Power. Dalton serves its requirements from self-owned generation facilities, some of which are jointly-owned with Georgia Power, and through purchases from Georgia Power and Southern Power through a service agreement. In addition, Georgia Power serves the full requirements of Hamptons electric distribution system under a market-based contract. See PROPERTIES Jointly-Owned Facilities in Item 2 herein for additional information.
Georgia Power has entered into substantially similar agreements with Georgia Transmission Corporation, MEAG Power, and Dalton providing for the establishment of an integrated transmission system to carry the power and energy of all parties. The agreements require an investment by each party in the integrated transmission system in proportion to its respective share of the aggregate system load. See PROPERTIES Jointly-Owned Facilities in Item 2 herein for additional information.
Southern Power has PPAs with some of the traditional operating companies and with other investor-owned utilities, IPPs, municipalities, electric cooperatives, and an energy marketing firm. See MANAGEMENTS DISCUSSION AND ANALYSIS FUTURE EARNINGS POTENTIAL Power Sales Agreements of Southern Power in Item 7 herein for additional information concerning Southern Powers PPAs.
SCS, acting on behalf of the traditional operating companies, also has a contract with SEPA providing for the use of the traditional operating companies facilities at government expense to deliver to certain cooperatives and
I-7
municipalities, entitled by federal statute to preference in the purchase of power from SEPA, quantities of power equivalent to the amounts of power allocated to them by SEPA from certain United States government hydroelectric projects.
Pursuant to the 1956 Utility Act, the Mississippi PSC issued Grandfather Certificates of public convenience and necessity to Mississippi Power and to six distribution rural cooperatives operating in southeastern Mississippi, then served in whole or in part by Mississippi Power, authorizing them to distribute electricity in certain specified geographically described areas of the state. The six cooperatives serve approximately 325,000 retail customers in a certificated area of approximately 10,300 square miles. In areas included in a Grandfather Certificate, the utility holding such certificate may, without further certification, extend its lines up to five miles; other extensions within that area by such utility, or by other utilities, may not be made except upon a showing of, and a grant of a certificate of, public convenience and necessity. Areas included in such a certificate which are subsequently annexed to municipalities may continue to be served by the holder of the certificate, irrespective of whether it has a franchise in the annexing municipality. On the other hand, the holder of the municipal franchise may not extend service into such newly annexed area without authorization by the Mississippi PSC.
The electric utility industry in the United States is continuing to evolve as a result of regulatory and competitive factors. Among the early primary agents of change was the Energy Policy Act of 1992 which allowed IPPs to access a utilitys transmission network in order to sell electricity to other utilities.
The competition for retail energy sales among competing suppliers of energy is influenced by various factors, including price, availability, technological advancements, service, and reliability. These factors are, in turn, affected by, among other influences, regulatory, political, and environmental considerations, taxation, and supply.
The retail service rights of all electric suppliers in the State of Georgia are regulated by the Territorial Electric Service Act of 1973. Pursuant to the provisions of this Act, all areas within existing municipal limits were assigned to the primary electric supplier therein. Areas outside of such municipal limits were either to be assigned or to be declared open for customer choice of supplier by action of the Georgia PSC pursuant to standards set forth in this Act. Consistent with such standards, the Georgia PSC has assigned substantially all of the land area in the state to a supplier. Notwithstanding such assignments, this Act provides that any new customer locating outside of 1973 municipal limits and having a connected load of at least 900 KWs may exercise a one-time choice for the life of the premises to receive electric service from the supplier of its choice.
Generally, the traditional operating companies have experienced, and expect to continue to experience, competition in their respective retail service territories in varying degrees as the result of self-generation (as described below) by customers and other factors.
Southern Power competes with investor owned utilities, IPPs, and others for wholesale energy sales primarily in the Southeastern U.S. wholesale market. The needs of this market are driven by the demands of end users in the Southeast and the generation available. Southern Powers success in wholesale energy sales is influenced by various factors including reliability and availability of Southern Powers plants, availability of transmission to serve the demand, price, and Southern Powers ability to contain costs.
Alabama Power currently has cogeneration contracts in effect with nine industrial customers. Under the terms of these contracts, Alabama Power purchases excess generation of such companies. During 2011, Alabama Power purchased approximately 115 million KWHs from such companies at a cost of $5 million.
Georgia Power currently has contracts in effect with 10 small power producers whereby Georgia Power purchases their excess generation. During 2011, Georgia Power purchased 18 million KWHs from such companies at a cost of $0.6 million. Georgia Power also has PPAs for electricity with two cogeneration facilities. Payments are subject to reductions for failure to meet minimum capacity output. During 2011, Georgia Power purchased 261 million KWHs at a cost of $26 million from these facilities.
I-8
Also during 2011, Georgia Power purchased energy from eight customer-owned generating facilities. Seven of the eight customers provide only energy to Georgia Power. These seven customers make no capacity commitment and are not dispatched by Georgia Power. Georgia Power does have a contract with the remaining customer for eight MWs of dispatchable capacity and energy. During 2011, Georgia Power purchased a total of 37 million KWHs from the eight customers at a cost of approximately $1 million.
Gulf Power currently has agreements in effect with various industrial, commercial, and qualifying facilities pursuant to which Gulf Power purchases as available energy from customer-owned generation. During 2011, Gulf Power purchased 240 million KWHs from such companies for approximately $11 million.
Mississippi Power currently has a cogeneration agreement in effect with one of its industrial customers. Under the terms of this contract, Mississippi Power purchases any excess generation. During 2011, Mississippi Power did not purchase any excess generation from this customer.
The demand for electric power generation is affected by seasonal differences in the weather. At the traditional operating companies and Southern Power, the demand for power peaks during the summer months, with market prices reflecting the demand of power and available generating resources at that time. Power demand peaks can also be recorded during the winter. As a result, the overall operating results of Southern Company, the traditional operating companies, and Southern Power in the future may fluctuate substantially on a seasonal basis. In addition, Southern Company, the traditional operating companies, and Southern Power have historically sold less power when weather conditions are milder.
State Commissions
The traditional operating companies are subject to the jurisdiction of their respective state PSCs. The PSCs have broad powers of supervision and regulation over public utilities operating in the respective states, including their rates, service regulations, sales of securities (except for the Mississippi PSC), and, in the cases of the Georgia PSC and the Mississippi PSC, in part, retail service territories. See Territory Served by the Traditional Operating Companies and Southern Power and Rate Matters herein for additional information.
Federal Power Act
The traditional operating companies, Southern Power and its generation subsidiaries, and SEGCO are all public utilities engaged in wholesale sales of energy in interstate commerce and therefore are subject to the rate, financial, and accounting jurisdiction of the FERC under the Federal Power Act. The FERC must approve certain financings and allows an at cost standard for services rendered by system service companies such as SCS and Southern Nuclear. The FERC is also authorized to establish regional reliability organizations which are authorized to enforce reliability standards, to address impediments to the construction of transmission, and to prohibit manipulative energy trading practices.
Alabama Power and Georgia Power are also subject to the provisions of the Federal Power Act or the earlier Federal Water Power Act applicable to licensees with respect to their hydroelectric developments. Among the hydroelectric projects subject to licensing by the FERC are 14 existing Alabama Power generating stations having an aggregate installed capacity of 1,662,400 KWs and 18 existing Georgia Power generating stations having an aggregate installed capacity of 1,087,296 KWs.
In 2005, Alabama Power filed two applications with the FERC for new 50-year licenses for its seven hydroelectric developments on the Coosa River (Weiss, Henry, Logan Martin, Lay, Mitchell, Jordan, and Bouldin) and for the Lewis Smith and Bankhead developments on the Warrior River. The FERC licenses for all of these nine projects expired in 2007. Since the FERC did not act on Alabama Powers new license applications prior to the expiration of the existing licenses, the FERC is required by law to issue annual licenses to Alabama Power, under the terms and conditions of the existing license, until action is taken on the new license applications.
I-9
The FERC issued annual licenses to the Coosa developments and the Warrior River developments in 2007. These annual licenses are automatically renewed each year without further action by the FERC to allow Alabama Power to continue operation of the projects under the terms of the previous license while the FERC completes review of the applications for new licenses. Though the Coosa application remains pending before the FERC, in March 2010, the FERC issued a new 30 year license to Alabama Power for the Warrior River developments. In April 2010, the Smith Lake Improvement and Stakeholder Association filed a request for rehearing of the FERC order granting the new Warrior license. In May 2010, the FERC granted the rehearing request for the limited purpose of allowing the FERC additional time to consider the substantive issues raised in the request.
In 2006, Alabama Power initiated the process of developing an application to relicense the Martin Dam Project located on the Tallapoosa River. The current Martin license will expire on June 8, 2013. On June 8, 2011, Alabama Power filed an application with the FERC to relicense the Martin Dam Project.
In 2010, Alabama Power initiated the process of developing an application to relicense the Holt hydroelectric project located on the Warrior River. The current Holt license will expire on August 31, 2015, and the application for a new license is expected to be filed with the FERC no later than August 31, 2013.
In 2007, Georgia Power began the relicensing process for Bartletts Ferry which is located on the Chattahoochee River near Columbus, Georgia. The current Bartletts Ferry license expires in 2014 and the application for a new license is expected to be submitted to the FERC in late 2012.
The ultimate outcome of these matters cannot be determined at this time. See MANAGEMENTS DISCUSSION AND ANALYSIS FUTURE EARNINGS POTENTIAL FERC Matters of Alabama Power in Item 7 herein for additional information.
Georgia Power and OPC also have a license, expiring in 2027, for the Rocky Mountain Plant, a pure pumped storage facility of 847,800 KW capacity. See PROPERTIES Jointly-Owned Facilities in Item 2 herein for additional information.
Licenses for all projects, excluding those discussed above, expire in the period 2023-2034 in the case of Alabama Powers projects and in the period 2020-2039 in the case of Georgia Powers projects.
Upon or after the expiration of each license, the U.S. Government, by act of Congress, may take over the project or the FERC may relicense the project either to the original licensee or to a new licensee. In the event of takeover or relicensing to another, the original licensee is to be compensated in accordance with the provisions of the Federal Power Act, such compensation to reflect the net investment of the licensee in the project, not in excess of the fair value of the property, plus reasonable damages to other property of the licensee resulting from the severance therefrom of the property.
Nuclear Regulation
Alabama Power, Georgia Power, and Southern Nuclear are subject to regulation by the NRC. The NRC is responsible for licensing and regulating nuclear facilities and materials and for conducting research in support of the licensing and regulatory process, as mandated by the Atomic Energy Act of 1954, as amended; the Energy Reorganization Act of 1974, as amended; and the Nuclear Nonproliferation Act of 1978; and in accordance with the National Environmental Policy Act of 1969, as amended, and other applicable statutes. These responsibilities also include protecting public health and safety, protecting the environment, protecting and safeguarding nuclear materials and nuclear power plants in the interest of national security, and assuring conformity with antitrust laws.
In 2002, the NRC extended the licenses of Georgia Powers Plant Hatch Units 1 and 2 until 2034 and 2038, respectively. In 2005, the NRC extended the licenses of Alabama Powers Plant Farley Units 1 and 2 until 2037 and 2041, respectively. In 2009, the NRC extended the licenses of Plant Vogtle Units 1 and 2 to 2047 and 2049, respectively.
Also in 2009, the NRC issued an Early Site Permit and Limited Work Authorization to Southern Nuclear, on behalf of Georgia Power, OPC, MEAG Power, and Dalton (collectively, Owners), related to Plant Vogtle Units 3 and 4. In
I-10
2008, Southern Nuclear filed an application with the NRC for combined construction and operating licenses (COLs) for Plant Vogtle Units 3 and 4. The NRC certified the Westinghouse Electric Company LLCs Design Certification Document, as amended, for the AP1000 reactor design, effective December 30, 2011. On February 9, 2012, the NRC affirmed a decision directing the NRC staff to proceed with issuance of the COLs for Plant Vogtle Units 3 and 4 in accordance with its regulations. The COLs were received on February 10, 2012. Receipt of the COLs allows full construction to begin on Plant Vogtle Units 3 and 4, which are expected to attain commercial operation in 2016 and 2017, respectively. See MANAGEMENTS DISCUSSION AND ANALYSIS FUTURE EARNINGS POTENTIAL Construction Nuclear of Georgia Power in Item 7 herein and Note 3 to the financial statements of Southern Company under Retail Regulatory Matters Georgia Power Nuclear Construction and Georgia Power under Construction Nuclear in Item 8 herein for additional information.
See Notes 1 and 9 to the financial statements of Southern Company, Alabama Power, and Georgia Power in Item 8 herein for information on nuclear decommissioning costs and nuclear insurance.
Environmental Statutes and Regulations
Southern Companys operations are subject to extensive regulation by state and federal environmental agencies under a variety of statutes and regulations governing environmental media, including air, water, and land resources. Compliance with these existing environmental requirements involves significant capital and operating costs, a major portion of which is expected to be recovered through existing ratemaking provisions for the traditional operating companies or market-based rates for Southern Power. There is no assurance, however, that all such costs will be recovered.
Compliance with the federal Clean Air Act and resulting regulations has been, and will continue to be, a significant focus for Southern Company, each traditional operating company, Southern Power, and SEGCO. In addition, existing environmental laws and regulations may be changed or new laws and regulations may be adopted or otherwise become applicable to the Southern Company system, including laws and regulations designed to address air quality, water, management of waste materials and coal combustion byproducts, global climate change, or other environmental and health concerns. See MANAGEMENTS DISCUSSION AND ANALYSIS FUTURE EARNINGS POTENTIAL Environmental Matters of Southern Company and each of the traditional operating companies in Item 7 herein for additional information about the Clean Air Act and other environmental issues, including, but not limited to, the litigation brought by the EPA under the New Source Review provisions of the Clean Air Act, proposed and final regulations related to air quality, water, greenhouse gases, and coal combustion byproducts. Also see MANAGEMENTS DISCUSSION AND ANALYSIS FUTURE EARNINGS POTENTIAL Environmental Matters of Southern Power in Item 7 herein for additional information about environmental issues and climate change regulation.
The Southern Company systems compliance strategy, including potential unit retirement and replacement decisions, and future environmental capital expenditures are dependent on a final assessment of the MATS rule and will be affected by the final requirements of new or revised environmental regulations that are promulgated, including proposed environmental regulations; the outcome of any legal challenges to the environmental rules; the cost, availability, and existing inventory of emissions allowances; and the fuel mix of the electric utilities. These costs may arise from existing unit retirements, installation of additional environmental controls, upgrades to the transmission system, the addition of new generating resources, and changing fuel sources for certain existing units. The Southern Company systems preliminary analysis further indicates that the short timeframe for compliance with the MATS rule could significantly affect electric system reliability and cause an increase in costs of materials and services. Also see MANAGEMENTS DISCUSSION AND ANALYSIS FUTURE EARNINGS POTENTIAL Environmental Matters of Southern Company and each of the traditional operating companies in Item 7 herein for additional information. The ultimate outcome of these matters cannot be determined at this time.
As of December 31, 2011, the Southern Company system had total generating capacity of approximately 43,555 MWs, of which 20,212 MWs are coal-fired. Over the past several years, the Southern Company system has installed various pollution control technologies on coal-fired units, including both selective catalytic reduction equipment and scrubbers on the 17 largest coal units making up 11,036 MWs of the Southern Company systems coal-fired generating capacity. As a result of the EPAs final and anticipated rules and regulations, the Southern Company system is evaluating its coal-fired generating capacity and is developing a compliance strategy which may include unit retirements, installation of additional environmental controls (including its units with existing pollution control technologies), and changing fuel sources for certain units.
I-11
SEGCO is also developing an environmental compliance strategy for its 1,000 MWs of coal-fired generating capacity, which may result in unit retirements, installation of controls, or changing fuel source. The capacity of SEGCOs units is sold to Alabama Power and Georgia Power through a PPA. The impact of SEGCOs compliance strategy on such PPA costs cannot be determined at this time; however, if such costs cannot continue to be recovered through retail rates, they could have a material financial impact on Southern Companys, Alabama Powers, or Georgia Powers financial statements. See Note 4 to the financial statements for additional information.
Compliance with any new federal or state legislation or regulations relating to global climate change, air quality, coal combustion byproducts, water, or other environmental and health concerns could significantly affect the Southern Company system. Although new or revised environmental legislation or regulations could affect many areas of the electric utilities operations, the full impact of any such changes cannot be determined at this time. Additionally, many of the electric utilities commercial and industrial customers may also be affected by existing and future environmental requirements, which for some may have the potential to ultimately affect their demand for electricity. See Construction Program herein for additional information.
Rate Structure and Cost Recovery Plans
The rates and service regulations of the traditional operating companies are uniform for each class of service throughout their respective service territories. Rates for residential electric service are generally of the block type based upon KWHs used and include minimum charges. Residential and other rates contain separate customer charges. Rates for commercial service are presently of the block type and, for large customers, the billing demand is generally used to determine capacity and minimum bill charges. These large customers rates are generally based upon usage by the customer and include rates with special features to encourage off-peak usage. Additionally, Alabama Power, Gulf Power, and Mississippi Power are generally allowed by their respective state PSCs to negotiate the terms and cost of service to large customers. Such terms and cost of service, however, are subject to final state PSC approval.
The traditional operating companies recover their respective costs through a variety of forward-looking, cost-based rate mechanisms. Fuel and net purchased energy costs are recovered through specific fuel cost recovery provisions. These fuel cost recovery provisions are adjusted to reflect increases or decreases in such costs as needed or on schedules as required by the respective PSCs. Approved environmental compliance, storm damage, and certain other costs are recovered at Alabama Power, Gulf Power, and Mississippi Power through specific cost recovery mechanisms approved by their respective PSCs. Certain similar costs at Georgia Power are recovered through various base rate tariffs as approved by the Georgia PSC. Costs not recovered through specific cost recovery mechanisms are recovered at Alabama Power and Mississippi Power through annual, formulaic cost recovery proceedings and at Georgia Power and Gulf Power through base rate proceedings.
See MANAGEMENTS DISCUSSION AND ANALYSIS FUTURE EARNINGS POTENTIAL PSC Matters of Southern Company and each of the traditional operating companies in Item 7 herein and Note 3 to the financial statements of Southern Company and each of the traditional operating companies under Retail Regulatory Matters in Item 8 herein for a discussion of rate matters. Also, see Note 1 to the financial statements of Southern Company and each of the traditional operating companies in Item 8 herein for a discussion of recovery of fuel costs, storm damage costs, and environmental compliance costs through rate mechanisms.
See Integrated Resource Planning herein for a discussion of Georgia PSC certification of new demand-side or supply-side resources for Georgia Power. In addition, see MANAGEMENTS DISCUSSION AND ANALYSIS FUTURE EARNINGS POTENTIAL Construction Nuclear of Georgia Power in Item 7 herein and Note 3 to the financial statements of Southern Company under Retail Regulatory Matters Georgia Power Nuclear Construction and Georgia Power under Construction Nuclear in Item 8 herein for a discussion of the Georgia Nuclear Energy Financing Act and the Georgia PSC certification of Plant Vogtle Units 3 and 4, which allow Georgia Power to recover financing costs for construction of the new nuclear units during the construction period beginning in 2011.
I-12
The traditional operating companies and Southern Power and its generation subsidiaries are authorized by the FERC to sell power to non-affiliates, including short-term opportunity sales, at market-based prices. Specific FERC approval must be obtained with respect to a market-based contract with an affiliate.
Integrated Resource Planning
Each of the traditional operating companies continually evaluates its electric generating resources in order to ensure that it maintains a cost-effective and reliable mix of resources to meet the existing and future demand requirements of its customers. See Environmental Statutes and Regulations above for a discussion of existing and potential environmental regulations that may impact the future generating resource needs of the traditional operating companies.
Certain of the traditional operating companies periodically file IRPs with their respective state PSC. The following is a summary of the most recent IRP filings by certain of the traditional operating companies.
Georgia Power
Triennially, Georgia Power must file an IRP with the Georgia PSC that specifies how it intends to meet the future electrical needs of its customers through a combination of demand-side and supply-side resources. The Georgia PSC, under state law, must certify any new demand-side or supply-side resources for Georgia Power to get cost recovery. Once certified, the lesser of actual or certified construction costs and purchased power costs is recoverable through rates. Certified costs may be excluded from recovery only on the basis of fraud, concealment, failure to disclose a material fact, imprudence, or criminal misconduct.
In January 2010, Georgia Power filed its 2010 IRP with the Georgia PSC. The 2010 IRP projected that Georgia Powers current supply-side and demand-side resources are sufficient to provide a cost-effective and reliable source of capacity and energy at least through 2014. The 2010 IRP identified a number of potential new or modified federal environmental statutes and regulations that could significantly impact Georgia Powers existing coal-fired generating units. In addition, under the State of Georgias Multi-Pollutant Rule, Georgia Power is required to install specific emissions controls on certain coal-fired generating units by specific dates between December 31, 2008 and June 1, 2015. See Environmental Statutes and Regulations above.
In July 2010, the Georgia PSC approved Georgia Powers 2010 IRP including the following provisions: (1) restarting a request for proposal to enable the potential replacement of coal units that may be retired beginning in approximately 2015; (2) expanding energy efficiency efforts; (3) implementing seven new demand-side management and energy efficiency programs; (4) collecting incentives totaling 10% of the net benefit of energy efficiency programs annually, with certain conditions, for the certified programs; (5) developing a one MW self-build portfolio of solar photovoltaic demonstration projects; (6) delaying capital spending on the conversion of Plant Mitchell Unit 3 from a coal-fired generating unit to a renewable biomass generating unit until the EPA issues applicable maximum achievable control technology (MACT) standards under the Clean Air Act; (7) considering conversion of additional coal units to biomass, if such conversions appear to be economic and feasible; and (8) continuing to suspend work on environmental controls for Units 6 and 7 at Plant Yates and Units 3 and 4 at Plant Branch until the EPA issues applicable MACT standards and regulations for coal combustion byproducts.
In addition, Georgia Powers 2010 IRP reflected the construction of Plant McDonough Units 4, 5, and 6 (natural gas) and Plant Vogtle Units 3 and 4 (nuclear) as certified by the Georgia PSC in 2007 and 2009, respectively. The 2010 IRP also reflected the related retirement of Plant McDonough Units 1 and 2 (coal), which were decertified by the Georgia PSC in connection with construction of the new units. See MANAGEMENTS DISCUSSION AND ANALYSIS FUTURE EARNINGS POTENTIAL Construction of Georgia Power in Item 7 herein and Note 3 to the financial statements of Southern Company under Retail Regulatory Matters Georgia Power Nuclear Construction and Retail Regulatory Matters Georgia Power Other Construction in Item 8 herein and Note 3 to the financial statements of Georgia Power under Construction in Item 8 herein for additional information.
I-13
On August 4, 2011, Georgia Power filed an update to its IRP (2011 IRP Update). The filing included Georgia Powers application to decertify and retire Plant Branch Units 1 and 2 as of December 31, 2013 and October 1, 2013, the compliance dates for the respective units under the Georgia Multi-Pollutant Rule, and to decertify and retire Plant Mitchell Unit 4C in March 2012. Georgia Power also requested approval of expenditures for certain baghouse project preparation work at Plants Bowen, Wansley, and Hammond. However, as a result of the considerable uncertainty regarding pending federal environmental regulations, Georgia Power is continuing to defer decisions to add controls, switch fuel, or retire its remaining fleet of coal- and oil-fired generation where environmental controls have not yet been installed, representing approximately 2,600 MWs of capacity. Georgia Power is currently updating its economic analysis of these units based on the final MATS rule and currently expects that certain units, representing approximately 600 MWs of capacity, are more likely than others to switch fuel or be controlled in time to comply with the MATS rule. If the updated economic analysis shows more positive benefits associated with adding controls or switching fuel for more units, it is unlikely that all of the required controls could be completed by April 16, 2015, the compliance date for the MATS rule. As a result, Georgia Power cannot rely on the availability of approximately 2,000 MWs of capacity in 2015. As such, the 2011 IRP Update also includes Georgia Powers application requesting that the Georgia PSC certify the purchase of a total of 1,562 MWs of capacity beginning in 2015, from four PPAs selected through the 2015 request for proposal process.
In addition, Georgia Power filed a request with the Georgia PSC on August 4, 2011 for the certification of 562 MWs of certain wholesale capacity that is scheduled to be returned to retail service in 2015 and 2016 under a September 2010 agreement with Georgia PSC. On January 30, 2012, Georgia Power entered into a stipulation with the Georgia PSC Advocacy Staff to grant the Georgia PSC an extension to the Georgia PSCs termination option date from February 1, 2012 to March 27, 2012. The Georgia PSC can exercise the termination option under specific conditions, such as changes in the cost of compliance with EPA rules and coal unit retirement decisions.
The Georgia PSC is expected to vote on these requests in March 2012. The ultimate outcome of these matters cannot be determined at this time.
Gulf Power
Annually by April 1, Gulf Power must file a 10-year site plan with the Florida PSC containing Gulf Powers estimate of its power-generating needs in the period and the general location of its proposed power plant sites. The 10-year site plans submitted by the states electric utilities are reviewed by the Florida PSC and subsequently classified as either suitable or unsuitable. The Florida PSC then reports its findings along with any suggested revisions to the Florida Department of Environmental Protection for its consideration at any subsequent electrical power plant site certification proceedings. Under Florida law, any 10-year site plans submitted by an electric utility are considered tentative information for planning purposes only and may be amended at any time at the discretion of the utility with written notification to the Florida PSC. At least every five years, the Florida PSC must conduct proceedings to establish numerical goals for all investor-owned electric utilities and certain municipal or cooperative electric utilities in the state to reduce the growth rates of weather-sensitive peak demand, to reduce and control the growth rates of electric consumption, and to increase the conservation of expensive resources, such as petroleum fuels. Overall residential KWs and KWH goals and overall commercial/industrial KWs and KWH goals for each utility are set by the Florida PSC for each year over a 10-year period. The goals are to be based on an estimate of the total cost effective KWs and KWH savings reasonably achievable through demand-side management in each utilitys service territory over a 10-year period. Once goals have been set, each affected utility must develop and submit plans and programs to meet the overall goals within its service territory to the Florida PSC for review and approval. Once approved, the utilities are required to submit periodic reports which the Florida PSC then uses to prepare its annual report to the Governor and Legislature of the goals that have been established and the progress towards meeting those goals.
Gulf Powers most recent 10-year site plan was classified by the Florida PSC as suitable on November 22, 2011. Gulf Powers most recent 10-year site plan and environmental compliance plan identify environmental regulations and potential legislation or regulation that would impose mandatory restrictions on greenhouse gas emissions. See MANAGEMENTS DISCUSSION AND ANALYSIS FUTURE EARNINGS POTENTIAL Environmental Matters Environmental Statutes and Regulations Air Quality, Environmental Matters Environmental Statutes and Regulations Coal Combustion Byproducts, and Environmental Matters Global Climate Issues of Gulf Power in Item 7 herein. The site plan and environmental compliance plan include preliminary retirement studies under a variety of potential scenarios for units at each of Gulf Powers coal-fired generating plants. These studies
I-14
indicate that, depending on the final requirements in these anticipated EPA regulations and any legislation or regulations relating to greenhouse gas emissions, as well as estimates of long-term fuel prices, Gulf Power may conclude that it is more economical to retire certain of its coal-fired generating units prior to 2021 and to replace such units with new or purchased capacity.
In 2009, the Florida PSC adopted new numerical conservation goals for Gulf Power along with other electric utilities in the state. The Florida PSC adopted more aggressive goals due in part to the consideration of possible greenhouse gas emissions costs incurred in connection with possible climate change legislation and a change in the manner in which the Florida PSC considers the effect of so-called free-riders on the level of conservation reasonably achievable through utility programs. Gulf Powers plans and programs to meet the new goals were submitted to the Florida PSC for review in March 2010 and were approved on January 25, 2011. The costs of implementing Gulf Powers conservation plans and programs are recovered through specific conservation recovery rates set annually by the Florida PSC.
The ultimate outcome of these matters cannot be determined at this time.
Mississippi Power
In 2009, Mississippi Power filed its 2010 IRP with the Mississippi PSC. The filing was made in connection with the Mississippi PSC certification proceedings relating to the Kemper IGCC. In the 2010 IRP, Mississippi Power projected that it will have a need for new capacity in the 2013 to 2015 timeframe. The 2010 IRP indicated a need range of approximately 200 MWs to 300 MWs in 2014, which reflects growth in load and the anticipated retirement of older gas steam units Plant Eaton Units 1 through 3 and Plant Watson Units 1 through 3 in 2012 and 2013, respectively. In addition, due to potential retirements of existing coal units, the Mississippi PSC found a need in 2015 that ranges from 304 MWs to 1,276 MWs.
The range of needs for 2015 is based on Mississippi Powers preliminary analysis of the MATS rule, as well as potential legislation or regulations that would impose mandatory restrictions on greenhouse gas emissions. See MANAGEMENTS DISCUSSION AND ANALYSIS FUTURE EARNINGS POTENTIAL Environmental Matters Environmental Statutes and Regulations Air Quality and Environmental Matters Global Climate Issues of Mississippi Power in Item 7 herein. Depending on Mississippi Powers final assessment of the MATS rule, the final requirements in the anticipated EPA regulations, and any legislation or regulation relating to greenhouse gas emissions, as well as estimates of long-term fuel prices, Mississippi Power may conclude that it is more economical to discontinue burning coal at certain coal-fired generating units than to install the required controls.
Mississippi Powers 2010 IRP indicated that Mississippi Power plans to construct the Kemper IGCC to meet its identified needs, to add environmental controls at Plant Daniel Units 1 and 2, to defer environmental controls at Plant Watson Units 4 and 5, and to continue operation of the combined cycle Plant Daniel Units 3 and 4.
The ultimate outcome of these matters cannot be determined at this time.
Mississippi Base Load Construction Legislation
In the 2008 regular session of the Mississippi legislature, a bill was passed and signed by the Governor in 2008 to enhance the Mississippi PSCs authority to facilitate development and construction of base load generation in the State of Mississippi (Baseload Act). The Baseload Act authorizes, but does not require, the Mississippi PSC to adopt a cost recovery mechanism that includes in retail base rates, prior to and during construction, all or a portion of the prudently incurred pre-construction and construction costs incurred by a utility in constructing a base load electric generating plant. Prior to the passage of the Baseload Act, such costs would traditionally be recovered only after the plant was placed in service. The Baseload Act also provides for periodic prudence reviews by the Mississippi PSC and prohibits the cancellation of any such generating plant without the approval of the Mississippi PSC. In the event of cancellation of the construction of the plant without approval of the Mississippi PSC, the Baseload Act authorizes the Mississippi PSC to make a public interest determination as to whether and to what extent the utility will be afforded rate recovery for costs incurred in connection with such cancelled generating plant. The effect of this legislation on Southern Company and Mississippi Power cannot be determined at this time.
I-15
In May 2010, Mississippi Power filed a motion with the Mississippi PSC accepting the conditions contained in the Mississippi PSC order confirming Mississippi Powers application for a certification of public convenience and necessity (CPCN) authorizing the acquisition, construction, and operation of the Kemper IGCC. In June 2010, the Mississippi PSC issued the CPCN. The estimated cost of the plant is $2.4 billion, net of $245.3 million of grants awarded to the project by the DOE under the Clean Coal Power Initiative Round 2. The Mississippi PSCs order (1) approved a construction cost cap of up to $2.88 billion (exemptions from the cost cap include the cost of the lignite mine and equipment and the carbon dioxide (CO2) pipeline facilities), (2) provided for the establishment of operational cost and revenue parameters based upon assumptions in the Mississippi Power proposal, and (3) approved financing cost recovery on construction work in progress (CWIP) balances, which provided for the accrual of an allowance for funds used during construction in 2010 and 2011 and provides for the recovery of financing costs on 100% of CWIP in 2012, 2013, and through May 1, 2014 (provided that the amount of CWIP allowed is (i) reduced by the amount of state and federal government construction cost incentives received by Mississippi Power in excess of $296 million to the extent that such amount increases cash flow for the pertinent regulatory period and (ii) justified by a showing that such CWIP allowance will benefit customers over the life of the plant). The Mississippi PSC order established periodic prudence reviews during the annual CWIP review process. Of the costs incurred through March 2009, $46 million has been reviewed and approved by the Mississippi PSC. A decision regarding the remaining $5 million has been deferred to a later date. The timing of the review of the remaining Kemper IGCC costs is uncertain.
On April 27, 2011 and August 9, 2011, Mississippi Power submitted to the Mississippi PSC proposed rate schedules detailing Certificated New Plant-A (CNP-A) and Certificated New Plant-B (CNP-B), respectively. CNP-A and CNP-B are proposed cost recovery mechanisms authorized by the Baseload Act. CNP-A is designed specifically to recover financing costs during the construction phase of the Kemper IGCC and CNP-B is designed to govern rates after the Kemper IGCC is placed into commercial service.
See MANAGEMENTS DISCUSSION AND ANALYSIS FUTURE EARNINGS POTENTIAL PSC Matters Certificated New Plant of Mississippi Power in Item 7 herein and Note 3 to the financial statements of Southern Company under Integrated Coal Gasification Combined Cycle and Mississippi Power under Retail Regulatory Matters Certificated New Plant in Item 8 herein for additional information.
The ultimate outcome of these matters cannot be determined at this time.
The Southern Company system had a total of 26,377 employees on its payroll at December 31, 2011.
Employees at December 31, 2011 | ||||||
Alabama Power |
6,632 | |||||
Georgia Power |
8,310 | |||||
Gulf Power |
1,424 | |||||
Mississippi Power |
1,264 | |||||
SCS |
4,533 | |||||
Southern Nuclear |
3,933 | |||||
Southern Power* |
0 | |||||
Other |
281 | |||||
| ||||||
Total |
26,377 | |||||
|
* | Southern Power has no employees. Southern Power has agreements with SCS and the traditional operating companies whereby employee services are rendered at amounts in compliance with FERC regulations. |
The traditional operating companies have separate agreements with local unions of the IBEW generally covering wages, working conditions, and procedures for handling grievances and arbitration. These agreements apply with certain exceptions to operating, maintenance, and construction employees.
I-16
Alabama Power has an agreement with the IBEW covering wages and working conditions, which is in effect through August 15, 2014.
Georgia Power has an agreement with the IBEW covering wages and working conditions, which is in effect through June 30, 2016.
Gulf Power has an agreement with the IBEW covering wages and working conditions, which is in effect through September 14, 2014.
Mississippi Power has an agreement with the IBEW covering wages and working conditions, which is in effect through August 15, 2014.
Southern Nuclear and the IBEW ratified a new five-year labor agreement for certain employees at Plants Hatch and Vogtle on September 16, 2011. The agreement is effective through June 30, 2016. A five-year agreement between Southern Nuclear and the IBEW representing certain employees at Plant Farley, which was ratified in 2009, remains in effect through August 15, 2014.
The agreements also make the terms of the pension plans for the companies discussed above subject to collective bargaining with the unions at either a five-year or a 10-year cycle, depending upon union and company actions.
I-17
In addition to the other information in this Form 10-K, including MANAGEMENTS DISCUSSION AND ANALYSIS FUTURE EARNINGS POTENTIAL in Item 7 of each registrant, and other documents filed by Southern Company and/or its subsidiaries with the SEC from time to time, the following factors should be carefully considered in evaluating Southern Company and its subsidiaries. Such factors could affect actual results and cause results to differ materially from those expressed in any forward-looking statements made by, or on behalf of, Southern Company and/or its subsidiaries.
UTILITY REGULATORY, LEGISLATIVE, AND LITIGATION RISKS
Southern Company and its subsidiaries are subject to substantial governmental regulation. Compliance with current and future regulatory requirements and procurement of necessary approvals, permits, and certificates may result in substantial costs to Southern Company and its subsidiaries.
Southern Company and its subsidiaries, including the traditional operating companies and Southern Power, are subject to substantial regulation from federal, state, and local regulatory agencies. Southern Company and its subsidiaries are required to comply with numerous laws and regulations and to obtain numerous permits, approvals, and certificates from the governmental agencies that regulate various aspects of their businesses, including rates and charges, service regulations, retail service territories, sales of securities, asset acquisitions and sales, accounting policies and practices, and the operation of fossil-fuel, hydroelectric, solar, and nuclear generating facilities, as well as transmission and distribution facilities. For example, the rates charged to wholesale customers by the traditional operating companies and by Southern Power must be approved by the FERC. These wholesale rates could be affected absent the ability to conduct business pursuant to FERC market-based rate authority. Additionally, the respective state PSCs must approve the traditional operating companies requested rates for retail customers. While the retail rates of the traditional operating companies are designed to provide for the full recovery of costs (including a reasonable return on invested capital), there can be no assurance that a state PSC, in a future rate proceeding, will not attempt to alter the timing or amount of certain costs for which recovery is sought or to modify the current authorized rate of return.
Southern Company and its subsidiaries believe the necessary permits, approvals, and certificates have been obtained for their respective existing operations and that their respective businesses are conducted in accordance with applicable laws; however, the impact of any future revision or changes in interpretations of existing regulations or the adoption of new laws and regulations applicable to Southern Company or any of its subsidiaries cannot now be predicted. Changes in regulation or the imposition of additional regulations could influence the operating environment of Southern Company and its subsidiaries and may result in substantial costs.
The Southern Company systems costs of compliance with environmental laws are significant. The costs of compliance with current and future environmental laws, including laws and regulations designed to address air quality, water, coal combustion byproducts, global climate change, renewable energy standards, and other matters and the incurrence of environmental liabilities could negatively impact the net income, cash flows, and financial condition of Southern Company, the traditional operating companies, or Southern Power.
The Southern Company system is subject to extensive federal, state, and local environmental requirements which, among other things, regulate air emissions, water usage and discharges, and the management of hazardous and solid waste in order to adequately protect the environment. Compliance with these environmental requirements requires the traditional operating companies and Southern Power to commit significant expenditures for installation of pollution control equipment, environmental monitoring, emissions fees, and permits at substantially all of their respective facilities. These expenditures are significant and Southern Company, the traditional operating companies, and Southern Power expect that they will increase in the future. Through 2011, the traditional operating companies had invested approximately $8.3 billion in environmental capital retrofit projects to comply with these requirements, with annual totals of $300 million, $500 million, and $1.3 billion for 2011, 2010, and 2009, respectively.
Existing environmental laws and regulations may be revised or new laws and regulations related to air quality, water, coal combustion byproducts, global climate change, or other environmental and health concerns may be adopted or become applicable to the traditional operating companies and Southern Power.
I-18
During 2011, the EPA proposed revisions and revised or issued additional regulations and designations with respect to air quality under the Clean Air Act, including finalization of the eight-hour ozone standards, the CSAPR, which relates to nitrogen oxide and sulfur dioxide emissions, and the MATS rule for coal- and oil-fired electric generating units, which imposes stringent emissions limits for acid gases, mercury, and total particulate matter.
On April 20, 2011, the EPA published a proposed water quality rule relating to cooling water intake structures at existing power plants and manufacturing facilities. Compliance with the proposed rule could require changes to existing cooling water intake structures at certain of the traditional operating companies generating facilities, and new generating units constructed at existing plants would be required to install closed cycle cooling towers.
In addition, the EPA is currently evaluating whether additional regulation of coal combustion byproducts (including coal ash and gypsum) is merited under federal solid and hazardous waste laws. In June 2010, the EPA published a proposed rule that requested comments on two potential regulatory options for the management and disposal of coal combustion byproducts: regulation as a solid waste or regulation as if the materials technically constituted a hazardous waste. Adoption of either option could require closure of, or significant change to, existing storage facilities and construction of lined landfills, as well as additional waste management and groundwater monitoring requirements and impact of the beneficial reuse of coal combustion byproducts. Under both options, the EPA proposes to exempt the beneficial use of coal combustion byproducts from regulation; however, a hazardous or other designation indicative of heightened risk could limit or eliminate beneficial reuse options.
In 2007, the U.S. Supreme Court ruled that the EPA has authority under the Clean Air Act to regulate greenhouse gas emissions from new motor vehicles, and, in April 2010, the EPA issued regulations to that effect. When these regulations became effective, carbon dioxide and other greenhouse gases became regulated pollutants under the Prevention of Significant Deterioration (PSD) preconstruction permit program and the Title V operating permit program, which both apply to power plants and other commercial and industrial facilities. In May 2010, the EPA issued a final rule, known as the Tailoring Rule, governing how these programs would be applied to stationary sources, including power plants. In addition to these rules, the EPA has announced plans to propose a rule setting forth standards of performance for greenhouse gas emissions from new and modified fossil fuel-fired electric generating units in early 2012 and greenhouse gas emissions guidelines for existing sources in late 2012. The ultimate outcome of these rules cannot be determined at this time and will depend on the outcome of any legal challenges.
Each of the states in which the Southern Company system has fossil generation is subject to the requirements of CAIR, which calls for phased reductions in sulfur dioxide (SO2) and nitrogen oxide (NOx) emissions from power plants in 28 eastern states. On August 8, 2011, the EPA adopted the CSAPR to replace CAIR effective January 1, 2012. Like CAIR, the CSAPR was intended to address interstate emissions of SO2 and NOx that interfere with downwind states ability to meet or maintain national ambient air quality standards for ozone and/or particulate matter. On February 7, 2012, the EPA released the final technical revisions to the CSAPR and at the same time issued a direct final rule which together provide additional increases to certain state emissions budgets, including the States of Florida, Georgia, and Mississippi.
On February 16, 2012, the EPA published the final MATS rule, which imposes stringent emissions limits for acid gases, mercury, and total particulate matter on coal- and oil-fired electric utility steam generating units. Compliance for existing sources is required by April 16, 2015 three years after the effective date of the final rule.
The Southern Company system is assessing the potential costs of complying with the MATS rule, as well as the EPAs proposed water and coal combustion byproducts rules. The Southern Company systems compliance strategy, including potential unit retirement and replacement decisions, and future environmental capital expenditures are dependent on a final assessment of the MATS rule and will be affected by the final requirements of new or revised environmental regulations that are promulgated, including the proposed environmental regulations described above; the outcome of any legal challenges to the environmental rules; the cost, availability, and existing inventory of emissions allowances; and the fuel mix of the electric utilities. These costs may arise from existing unit retirements, installation of additional environmental controls, upgrades to the transmission system, the addition of new generating resources, and changing fuel sources for certain existing units. The Southern Company systems preliminary analysis further indicates that the short timeframe for compliance with the MATS rule could
I-19
significantly affect electric system reliability and cause an increase in costs of materials and services. The ultimate outcome of these matters cannot be determined at this time. Additional compliance costs (including costs for the installation of environmental controls) and costs related to potential unit retirements and replacements could affect results of operations, cash flows, and financial condition if such costs are not recovered from customers. Further, higher costs that are recovered through regulated rates could contribute to reduced demand for electricity, which could negatively impact results of operations, cash flows, and financial condition.
If Southern Company, any traditional operating company, or Southern Power fails to comply with environmental laws and regulations, even if caused by factors beyond its control, that failure may result in the assessment of civil or criminal penalties and fines. The EPA has filed civil actions against Alabama Power and Georgia Power and issued notices of violation to Gulf Power and Mississippi Power alleging violations of the new source review provisions of the Clean Air Act. Southern Company, the traditional operating companies (excluding Mississippi Power), and Southern Power are also parties to suits alleging that emissions of carbon dioxide, a greenhouse gas, contribute to global climate change. An adverse outcome in any of these matters could require substantial capital expenditures that cannot be determined at this time and could possibly require payment of substantial penalties. Such expenditures could affect unit retirement and replacement decisions and results of operations, cash flows, and financial condition if such costs are not recovered through regulated rates for the traditional operating companies or market-based rates for Southern Power.
Litigation over environmental issues and claims of various types, including property damage, personal injury, common law nuisance, and citizen enforcement of environmental requirements such as air quality and water standards, has increased generally throughout the U.S. In particular, personal injury and other claims for damages caused by alleged exposure to hazardous materials, and common law nuisance claims for injunctive relief and property damage allegedly caused by greenhouse gas and other emissions, have become more frequent.
The ultimate cost impact of proposed and final legislation and regulations and litigation are likely to result in significant and additional costs and could result in additional operating restrictions.
The regional power market in which the Southern Company system competes may have changing transmission regulatory structures, which could affect the ownership of these assets and related revenues and expenses.
The traditional operating companies currently own and operate transmission facilities as part of a vertically integrated utility. A small percentage of transmission revenues are collected through the wholesale electric tariff but the majority of transmission revenues are collected through retail rates. Ongoing FERC efforts that may potentially change the regulatory and/or operational structure of transmission could have an adverse impact on future revenues. In addition, pending FERC regulation pertaining to cost allocation could require Southern Company and its utility subsidiaries to subsidize costs outside of the Southern Company systems retail service territory. The financial condition, net income, and cash flows of Southern Company and its utility subsidiaries could be adversely affected by pending or future changes in the federal regulatory or operational structure of transmission.
The traditional operating companies and Southern Power could be subject to higher costs and penalties as a result of mandatory reliability standards.
As a result of the Energy Policy Act of 2005, owners and operators of bulk power systems, including the traditional operating companies, are subject to mandatory reliability standards enacted by the North American Reliability Corporation and enforced by the FERC. Compliance with the mandatory reliability standards may subject the traditional operating companies, Southern Power, and Southern Company to higher operating costs and may result in increased capital expenditures. In addition, the MATS rule imposes stringent emission limits for acid gases, mercury, and total particulate matter on coal- and oil-fired electric utility steam generating units. There is uncertainty regarding the ability of the electric utility industry to achieve compliance with the requirements of the MATS rule within the compliance period, and the limited compliance period could significantly affect electric system reliability and thus impact the ability of the traditional operating companies and Southern Power to comply with mandatory reliability standards. If any traditional operating company or Southern Power is found to be in noncompliance with the mandatory reliability standards, such traditional operating company or Southern Power could be subject to sanctions, including substantial monetary penalties.
I-20
OPERATIONAL RISKS
The financial performance of Southern Company and its subsidiaries may be adversely affected if the subsidiaries are unable to successfully operate their facilities or perform certain corporate functions.
The financial performance of Southern Company and its subsidiaries depends on the successful operation of its subsidiaries electric generating, transmission, and distribution facilities. Operating these facilities involves many risks, including:
| operator error or failure of equipment or processes, particularly with older generating facilities; |
| operating limitations that may be imposed by environmental or other regulatory requirements; |
| labor disputes; |
| terrorist attacks; |
| fuel or material supply interruptions; |
| compliance with mandatory reliability standards, including mandatory cyber security standards; |
| implementation of technologies with which the Southern Company system is developing experience; |
| information technology system failure; |
| cyber intrusion; and |
| catastrophic events such as fires, earthquakes, explosions, floods, droughts, hurricanes, pandemic health events such as influenzas, or other similar occurrences. |
A decrease or elimination of revenues from the electric generation, transmission, or distribution facilities or an increase in the cost of operating the facilities would reduce the net income and cash flows and could adversely impact the financial condition of the affected traditional operating company or Southern Power and of Southern Company.
Changes in technology may make Southern Companys electric generating facilities owned by the traditional operating companies and Southern Power less competitive.
A key element of the business model of Southern Company, the traditional operating companies, and Southern Power is that generating power at central station power plants achieves economies of scale and produces power at a competitive cost. There are distributed generation technologies that produce power, including fuel cells, microturbines, wind turbines, and solar cells. It is possible that advances in technology will reduce the cost of alternative methods of producing power to a level that is competitive with that of most central station power electric production. If this were to happen and if these technologies achieved economies of scale, the market share of the traditional operating companies and Southern Power could be eroded, and the value of their respective electric generating facilities could be reduced. It is also possible that rapid advances in central station power generation technology could reduce the value of the current electric generating facilities owned by the traditional operating companies and Southern Power. Changes in technology could also alter the channels through which electric customers buy or utilize power, which could reduce the revenues or increase the expenses of Southern Company, the traditional operating companies, or Southern Power.
I-21
Operation of nuclear facilities involves inherent risks, including environmental, health, regulatory, natural disasters, terrorism, and financial risks, that could result in fines or the closure of the nuclear units owned by Alabama Power or Georgia Power and which may present potential exposures in excess of insurance coverage.
Alabama Power owns, and contracts for the operation of, two nuclear units and Georgia Power holds undivided interests in, and contracts for the operation of, four existing nuclear units. The six existing units are operated by Southern Nuclear and represent approximately 3,680 MWs, or 8.4%, of Southern Companys generation capacity as of December 31, 2011. In addition, Southern Nuclear, on behalf of Georgia Power and the other co-owners, is overseeing the construction of Plant Vogtle Units 3 and 4, which are expected to attain commercial operation in 2016 and 2017, respectively. Due solely to the increase in nuclear generating capacity, the below risks are expected to increase once Plant Vogtle Units 3 and 4 are operational. Nuclear facilities are subject to environmental, health, and financial risks such as:
| the potential harmful effects on the environment and human health resulting from a release of radioactive materials in connection with the operation of nuclear facilities and the storage, handling, and disposal of spent nuclear fuel; |
| uncertainties with respect to the on-site storage of and the ability to dispose of spent nuclear fuel; |
| uncertainties with respect to the technological and financial aspects of decommissioning nuclear plants at the end of licensed lives and the ability to maintain adequate reserves for decommissioning; |
| limitations on the amounts and types of insurance commercially available to cover losses that might arise in connection with the nuclear operations of Alabama Power and Georgia Power or those of others in the United States; |
| potential liabilities arising out of the operation of these facilities; |
| significant capital expenditures relating to maintenance, operation, security, and repair of these facilities, including repairs and upgrades required by the NRC; |
| the threat of a possible terrorist attack; and |
| the impact of a natural disaster. |
Alabama Power and Georgia Power maintain decommissioning trusts and external insurance coverage to minimize the financial exposure to these risks; however, it is possible that damages could exceed the amount of insurance coverage.
The NRC has broad authority under federal law to impose licensing and safety-related requirements for the operation of nuclear generation facilities. As a result of the major earthquake and tsunami that struck Japan on March 11, 2011 and caused substantial damage to the nuclear generating units at the Fukushima Daiichi generating plant, the NRC is performing additional operational and safety reviews of nuclear facilities in the U.S., which could potentially impact future operations and capital requirements. On July 12, 2011, a special NRC task force issued a report with initial recommendations for enhancing nuclear reactor safety in the U.S., including potential changes in emergency planning, onsite backup generation, and spent fuel pools for reactors. The final form and the resulting impact of any changes to safety requirements for nuclear reactors will be dependent on further review and action by the NRC and cannot be determined at this time.
In the event of non-compliance with NRC licensing and safety-related requirements, the NRC has the authority to impose fines and/or shut down any unit, depending upon its assessment of the severity of the situation, until compliance is achieved. NRC orders or regulations related to increased security measures and any future safety requirements promulgated by the NRC could require Alabama Power and Georgia Power to make substantial operating and capital expenditures at their nuclear plants. In addition, although Alabama Power, Georgia Power, and Southern Company have no reason to anticipate a serious nuclear incident at the Southern Company system
I-22
nuclear plants, if an incident did occur, it could result in substantial costs to Alabama Power or Georgia Power and Southern Company. A major incident at a nuclear facility anywhere in the world could cause the NRC to limit or prohibit the operation or licensing of any domestic nuclear unit. Moreover, a major incident at any nuclear facility in the United States could require Alabama Power and Georgia Power to make material contributory payments.
In addition, potential terrorist threats and increased public scrutiny of utilities could result in increased nuclear licensing or compliance costs that are difficult to predict.
Physical or cyber attacks, both threatened and actual, could impact the ability of the traditional operating companies and Southern Power to operate and could adversely affect financial results and liquidity.
The traditional operating companies and Southern Power face the risk of physical and cyber attacks, both threatened and actual, against their respective generation facilities, the transmission and distribution infrastructure used to transport power, and their information technology systems and network infrastructure, which could negatively impact the ability of the traditional operating companies or Southern Power to generate, transport, and deliver power, or otherwise operate their respective facilities in the most efficient manner or at all.
The traditional operating companies and Southern Power operate in a highly regulated industry that requires the continued operation of sophisticated information technology systems and network infrastructure, which are part of an interconnected regional grid. In addition, in the ordinary course of business, the traditional operating companies and Southern Power collect and retain sensitive information including personal identification information about customers and employees and other confidential information. Despite the implementation of security measures, all technology systems are potentially vulnerable to disability, failures, or unauthorized access due to human error or physical or cyber attacks. If the traditional operating companies or Southern Powers technology systems were to fail or be breached and were not recovered in a timely way, the traditional operating companies or Southern Power may be unable to fulfill critical business functions, and sensitive and other data could be compromised. The theft, damage, or improper disclosure of sensitive electronic data may also subject the applicable traditional operating company or Southern Power to penalties and claims from third parties.
These events could negatively affect the financial results of Southern Company, the traditional operating companies, or Southern Power through lost revenues, costs to recover and repair damage, and costs associated with governmental actions in response to such attacks.
The traditional operating companies and Southern Power may not be able to obtain adequate fuel supplies, which could limit their ability to operate their facilities.
The traditional operating companies and Southern Power purchase fuel, including coal, natural gas, uranium, fuel oil, and biomass, from a number of suppliers. Disruption in the delivery of fuel, including disruptions as a result of, among other things, transportation delays, weather, labor relations, force majeure events, or environmental regulations affecting any of these fuel suppliers, could limit the ability of the traditional operating companies and Southern Power to operate their respective facilities, and thus reduce the net income of the affected traditional operating company or Southern Power and Southern Company.
The traditional operating companies are dependent on coal for much of their electric generating capacity. Each traditional operating company has coal supply contracts in place; however, there can be no assurance that the counterparties to these agreements will fulfill their obligations to supply coal to the traditional operating companies. The suppliers under these agreements may experience financial or technical problems which inhibit their ability to fulfill their obligations to the traditional operating companies. In addition, the suppliers under these agreements may not be required to supply coal to the traditional operating companies under certain circumstances, such as in the event of a natural disaster. If the traditional operating companies are unable to obtain their coal requirements under these contracts, the traditional operating companies may be required to purchase their coal requirements at higher prices, which may not be fully recoverable through rates.
In addition, the traditional operating companies and Southern Power to a greater extent are dependent on natural gas for a portion of their electric generating capacity. Natural gas supplies can be subject to disruption in the event production or distribution is curtailed, such as in the event of a hurricane.
I-23
In addition, world market conditions for fuels can impact the cost and availability of natural gas, coal, and uranium.
The revenues of Southern Company, the traditional operating companies, and Southern Power depend in part on sales under PPAs. The failure of a counterparty to one of these PPAs to perform its obligations, or the failure to renew the PPAs, could have a negative impact on the net income and cash flows of the affected traditional operating company or Southern Power and of Southern Company.
Most of Southern Powers generating capacity has been sold to purchasers under PPAs. In addition, the traditional operating companies enter into PPAs with non-affiliated parties. Revenues are dependent on the continued performance by the purchasers of their obligations under these PPAs. Even though Southern Power and the traditional operating companies have a rigorous credit evaluation process, the failure of one of the purchasers to perform its obligations could have a negative impact on the net income and cash flows of the affected traditional operating company or Southern Power and of Southern Company. Although these credit evaluations take into account the possibility of default by a purchaser, actual exposure to a default by a purchaser may be greater than the credit evaluation predicts. Additionally, neither Southern Power nor any traditional operating company can predict whether the PPAs will be renewed at the end of their respective terms or on what terms any renewals may be made. If a PPA is not renewed, a replacement PPA cannot be assured.
Failure to attract and retain an appropriately qualified workforce could negatively impact Southern Companys and its subsidiaries results of operations.
Events such as an aging workforce without appropriate replacements, mismatch of skillset to future needs, or unavailability of contract resources may lead to operating challenges or increased costs. Such operating challenges include lack of resources, loss of knowledge, and a lengthy time period associated with skill development, especially with the workforce needs associated with new nuclear and IGCC construction. Failure to hire and adequately obtain replacement employees, including the ability to transfer significant internal historical knowledge and expertise to the new employees, or the future availability and cost of contract labor may adversely affect Southern Company and its subsidiaries ability to manage and operate their businesses. If Southern Company and its subsidiaries, including the traditional operating companies, are unable to successfully attract and retain an appropriately qualified workforce, results of operations could be negatively impacted.
CONSTRUCTION RISKS
Southern Company, the traditional operating companies, and Southern Power may incur additional costs or delays in the construction of new plants or other facilities and may not be able to recover their investments. Also, existing facilities of the traditional operating companies and Southern Power require ongoing capital expenditures, including those to meet environmental standards.
The businesses of the registrants require substantial capital expenditures for investments in new facilities and capital improvements to transmission, distribution, and generation facilities, including those to meet environmental standards. Certain of the traditional operating companies and Southern Power are in the process of constructing new generating facilities and adding environmental controls equipment at existing generating facilities. Southern Company intends to continue its strategy of developing and constructing other new facilities, including new nuclear generating, combined cycle, IGCC, and biomass generating units, expanding existing facilities, and adding environmental control equipment. These types of projects are long-term in nature and may involve facility designs that have not been finalized or previously constructed. The completion of these types of projects without delays or significant cost overruns is subject to substantial risks, including:
| shortages and inconsistent quality of equipment, materials, and labor; |
| work stoppages; |
| contractor or supplier delay or non-performance under construction or other agreements; |
I-24
| delays in or failure to receive necessary permits, approvals, and other regulatory authorizations; |
| impacts of new and existing laws and regulations, including environmental laws and regulations; |
| continued public and policymaker support for such projects; |
| adverse weather conditions; |
| unforeseen engineering problems; |
| changes in project design or scope; |
| environmental and geological conditions; |
| delays or increased costs to interconnect facilities to transmission grids; and |
| unanticipated cost increases, including materials and labor. |
In addition, with respect to the construction of new nuclear units and the operation of existing nuclear units, a major incident at a nuclear facility anywhere in the world could cause the NRC to delay or prohibit construction of new nuclear units or require additional safety measures at new and existing units. As a result of the major earthquake and tsunami that struck Japan on March 11, 2011 and caused substantial damage to the nuclear generating units at the Fukushima Daiichi generating plant, the NRC is performing additional operational and safety reviews of nuclear facilities in the U.S., which could potentially impact future operations and capital requirements. On July 12, 2011, a special NRC task force issued a report with initial recommendations for enhancing nuclear reactor safety in the U.S., including potential changes in emergency planning, onsite backup generation, and spent fuel pools for reactors. The final form and the resulting impact of any changes to safety requirements for nuclear reactors will be dependent on further review and action by the NRC and cannot be determined at this time.
If a traditional operating company or Southern Power is unable to complete the development or construction of a facility or decides to delay or cancel construction of a facility, it may not be able to recover its investment in that facility and may incur substantial cancellation payments under equipment purchase orders or construction contracts. Even if a construction project is completed, the total costs may be higher than estimated and there is no assurance that the traditional operating company will be able to recover such expenditures through regulated rates. In addition, construction delays and contractor performance shortfalls can result in the loss of revenues and may, in turn, adversely affect the net income and financial position of a traditional operating company or Southern Power and of Southern Company.
Construction delays also may result in the loss of otherwise available investment tax credits and other tax incentives. Furthermore, if construction projects are not completed according to specification, a traditional operating company or Southern Power and Southern Company may incur liabilities and suffer reduced plant efficiency, higher operating costs, and reduced net income.
The two largest construction projects currently underway in the Southern Company system are the construction of Plant Vogtle Units 3 and 4 and the construction of the Kemper IGCC. Southern Nuclear, on behalf of Georgia Power and the other co-owners, is overseeing the construction of and will operate Plant Vogtle Units 3 and 4. Georgia Power owns 45.7% of the new units, with a certified cost of approximately $6.1 billion. The Georgia PSC has approved Georgia Powers total costs of $1.7 billion for Plant Vogtle Units 3 and 4 incurred through June 30, 2011. Georgia Power will continue to file construction monitoring reports by February 28 and August 31 of each year during the construction period. The COLs for Plant Vogtle Units 3 and 4 were received on February 10, 2012. Receipt of the COLs allows full construction to begin on Plant Vogtle Units 3 and 4, which are expected to obtain commercial operation in 2016 and 2017, respectively. During the course of construction activities, issues have materialized that may impact the project budget and schedule, including potential costs associated with compressing the project schedule to meet the projected commercial operation dates. In addition, there have been technical and procedural challenges to the construction and licensing of Plant Vogtle Units 3 and 4. Similar additional challenges at the state and federal level are expected as construction proceeds. The ultimate outcome of these matters cannot be determined at this time.
I-25
In addition, Mississippi Power is constructing the Kemper IGCC. In July 2010, Mississippi Power and SMEPA entered into an Asset Purchase Agreement whereby SMEPA agreed to purchase a 17.5% undivided ownership interest in the Kemper IGCC. The closing of this transaction is conditioned upon execution of a joint ownership and operating agreement, receipt of all construction permits, appropriate regulatory approvals, financing, and other conditions. The estimated cost of the plant is $2.4 billion, net of $245 million of grants awarded to the project by the DOE under the Clean Coal Power Initiative Round 2. The Mississippi PSC order approving the Kemper IGCC included a construction cost cap of $2.88 billion (excluding the cost of the lignite mine equipment and the carbon dioxide pipeline facilities) and provides for the establishment of operational cost and revenue parameters based upon the assumptions in Mississippi Powers proposal. As of December 31, 2011, Mississippi Power had spent a total of approximately $943.3 million on the Kemper IGCC, including regulatory filing costs. The ultimate outcome of these matters cannot be determined at this time.
Once facilities come into commercial operation, ongoing capital expenditures are required to maintain reliable levels of operation. Significant portions of the traditional operating companies existing facilities were constructed many years ago. Older generation equipment, even if maintained in accordance with good engineering practices, may require significant capital expenditures to maintain efficiency, to comply with changing environmental requirements, or to provide reliable operations.
FINANCIAL, ECONOMIC, AND MARKET RISKS
The generation operations and energy marketing operations of Southern Company, the traditional operating companies, and Southern Power are subject to risks, many of which are beyond their control, including changes in power prices and fuel costs, that may reduce Southern Companys, the traditional operating companies, and Southern Powers revenues and increase costs.
The generation operations and energy marketing operations of the Southern Company system are subject to changes in power prices or fuel costs, which could increase the cost of producing power or decrease the amount received from the sale of power. The market prices for these commodities may fluctuate significantly over relatively short periods of time. In addition, the proportion of natural gas generation to the total fuel mix is likely to increase in the future. The Southern Company system attempts to mitigate risks associated with fluctuating fuel costs by passing these costs on to customers through the traditional operating companies fuel cost recovery clauses or through PPAs. Among the factors that could influence power prices and fuel costs are:
| prevailing market prices for coal, natural gas, uranium, fuel oil, biomass, and other fuels used in the generation facilities of the traditional operating companies and Southern Power, including associated transportation costs, and supplies of such commodities; |
| demand for energy and the extent of additional supplies of energy available from current or new competitors; |
| liquidity in the general wholesale electricity market; |
| weather conditions impacting demand for electricity; |
| seasonality; |
| transmission or transportation constraints or inefficiencies; |
| availability of competitively priced alternative energy sources; |
| forced or unscheduled plant outages for the Southern Company system, its competitors, or third party providers; |
I-26
| the financial condition of market participants; |
| the economy in the service territory, the nation, and worldwide, including the impact of economic conditions on demand for electricity and the demand for fuels; |
| natural disasters, wars, embargos, acts of terrorism, and other catastrophic events; and |
| federal, state, and foreign energy and environmental regulation and legislation. |
Certain of these factors could increase the expenses of the traditional operating companies or Southern Power and Southern Company. For the traditional operating companies, such increases may not be fully recoverable through rates. Other of these factors could reduce the revenues of the traditional operating companies or Southern Power and Southern Company.
Historically, the traditional operating companies from time to time have experienced underrecovered fuel cost balances and deficits in their storm cost recovery reserve balances and may experience such balances and deficits in the future. While the traditional operating companies are generally authorized to recover underrecovered fuel costs through fuel cost recovery clauses and storm recovery costs through special rate provisions administered by the respective PSCs, recovery may be denied if costs are deemed to be imprudently incurred, and delays in the authorization of such recovery could negatively impact the cash flows of the affected traditional operating company and Southern Company.
Southern Company may be unable to meet its ongoing and future financial obligations and to pay dividends on its common stock if its subsidiaries are unable to pay upstream dividends or repay funds to Southern Company.
Southern Company is a holding company and, as such, Southern Company has no operations of its own. Substantially all of Southern Companys consolidated assets are held by subsidiaries. Southern Companys ability to meet its financial obligations and to pay dividends on its common stock is primarily dependent on the net income and cash flows of its subsidiaries and their ability to pay upstream dividends or to repay funds to Southern Company. Prior to funding Southern Company, Southern Companys subsidiaries have regulatory restrictions and financial obligations that must be satisfied, including among others, debt service and preferred and preference stock dividends. Southern Companys subsidiaries are separate legal entities and have no obligation to provide Southern Company with funds.
A downgrade in the credit ratings of Southern Company, the traditional operating companies, or Southern Power could negatively affect their ability to access capital at reasonable costs and/or could require Southern Company, the traditional operating companies, or Southern Power to post collateral or replace certain indebtedness.
There are a number of factors that rating agencies evaluate to arrive at credit ratings for Southern Company, the traditional operating companies, and Southern Power, including capital structure, regulatory environment, the ability to cover liquidity requirements, and other commitments for capital. Southern Company, the traditional operating companies, and Southern Power could experience a downgrade in their ratings if any rating agency concludes that the level of business or financial risk of the industry or Southern Company, the traditional operating companies, or Southern Power has deteriorated. Changes in ratings methodologies by the agencies could also have a negative impact on credit ratings. If one or more rating agencies downgrade Southern Company, the traditional operating companies, or Southern Power, borrowing costs would increase, the pool of investors and funding sources would likely decrease, and, particularly for any downgrade to below investment grade, significant collateral requirements may be triggered in a number of contracts.
I-27
The use of derivative contracts by Southern Company and its subsidiaries in the normal course of business could result in financial losses that negatively impact the net income of Southern Company and its subsidiaries.
Southern Company and its subsidiaries, including the traditional operating companies and Southern Power, use derivative instruments, such as swaps, options, futures, and forwards, to manage their commodity and interest rate exposures and, to a lesser extent, engage in limited trading activities. Southern Company and its subsidiaries could recognize financial losses as a result of volatility in the market values of these contracts or if a counterparty fails to perform. These risks are managed through risk management policies, limits, and procedures. These risk management policies, limits, and procedures might not work as planned and cannot entirely eliminate the risks associated with these activities. In addition, derivative contracts entered for hedging purposes might not off-set the underlying exposure being hedged as expected, resulting in financial losses. In the absence of actively quoted market prices and pricing information from external sources, the valuation of these financial instruments can involve managements judgment or use of estimates. The factors used in the valuation of these instruments become more difficult to predict and the calculations become less reliable the further into the future these estimates are made. As a result, changes in the underlying assumptions or use of alternative valuation methods could affect the value of the reported fair value of these contracts.
The Dodd-Frank Wall Street Reform and Consumer Protection Act (Dodd-Frank Act) enacted in July 2010 could impact the use of over-the-counter derivatives by Southern Company and its subsidiaries. Regulations to implement the Dodd-Frank Act could impose additional requirements on the use of over-the-counter derivatives, such as margin and reporting requirements, which could affect both the use and cost of over-the-counter derivatives. The impact, if any, cannot be determined until regulations are finalized.
Southern Company, the traditional operating companies, and Southern Power are subject to risks associated with a changing economic environment as well as the financial stability of the customers of the traditional operating companies and Southern Power.
Southern Company, the traditional operating companies, and Southern Power are exposed to risks related to general economic conditions in their applicable service territory and are thus impacted by the economic cycles of the customers each serves. Any economic downturn or disruption of financial markets, both nationally and internationally, could negatively affect the financial stability of the customers and counterparties of the traditional operating companies and Southern Power. As territories served by the traditional operating companies and Southern Power experience economic downturns, energy consumption patterns may change and revenues may be negatively impacted. Customer growth and customer usage can be affected by economic factors in the service territory of the traditional operating companies and Southern Power and elsewhere, including, for example, job and income growth, housing starts, and new home prices. Adverse economic conditions, a population decline, and/or business closings in the territory served by the traditional operating companies or Southern Power or slower than anticipated customer growth as a result of a recessionary economy or otherwise could also have a negative impact on revenues and could result in greater expense for uncollectible customer balances.
As with other parts of the country, the territories served by the traditional operating companies and Southern Power have been impacted by the recent economic recession. The traditional operating companies have experienced residential and commercial sales that continue to be below historical trends due to the recent economic recession. Southern Power is expected to continue to experience reduced future revenues for its requirements customers due to the recent economic recession. The timing and extent of the recovery cannot be predicted.
Stronger or more rapid than expected economic growth, coupled with the effects of current and future environmental regulations applicable to the traditional operating companies or Southern Power, could impact the ability of the traditional operating companies and Southern Power to meet the energy demands of their customers. Weaker or slower than expected economic growth could have a negative impact on revenues, could result in greater expense for uncollected customer balances, and could adversely impact the value of generation assets of the traditional operating companies and Southern Power.
All of the factors discussed above could adversely affect Southern Companys, the traditional operating companies, and Southern Powers level of future net income.
I-28
Demand for power could exceed supply capacity, resulting in increased costs for purchasing capacity in the open market or building additional generation facilities.
The traditional operating companies and Southern Power are currently obligated to supply power to retail customers and wholesale customers under long-term PPAs. At peak times, the demand for power required to meet this obligation could exceed the Southern Company systems available generation capacity. Market or competitive forces may require that the traditional operating companies or Southern Power purchase capacity on the open market or build additional generation facilities. Because regulators may not permit the traditional operating companies to pass all of these purchase or construction costs on to their customers, the traditional operating companies may not be able to recover any of these costs or may have exposure to regulatory lag associated with the time between the incurrence of costs of purchased or constructed capacity and the traditional operating companies recovery in customers rates. Under Southern Powers long-term fixed price PPAs, Southern Power would not have the ability to recover any of these costs. These situations could have negative impacts on net income and cash flows for the affected traditional operating company or Southern Power and for Southern Company.
Demand for power could decrease or fail to grow at expected rates, resulting in stagnant or reduced revenues, limited growth opportunities, and potentially stranded generation assets.
Southern Company, the traditional operating companies, and Southern Power each engage in a long-term planning process to determine the optimal mix and timing of new generation assets required to serve future load obligations. This planning process must look many years into the future in order to accommodate the long lead times associated with the permitting and construction of new generation facilities. Inherent risk exists in predicting demand this far into the future as these future loads are dependent on many uncertain factors, including regional economic conditions, customer usage patterns, efficiency programs, and customer technology adoption. Because regulators may not permit the traditional operating companies to adjust rates to recover the costs of new generation assets while such assets are being constructed, the traditional operating companies may not be able to fully recover these costs or may have exposure to regulatory lag associated with the time between the incurrence of costs of additional capacity and the traditional operating companies recovery in customers rates. Under Southern Powers model of selling capacity and energy at negotiated market-based rates under long-term PPAs, Southern Power might not be able to fully execute its business plan if market prices drop below original forecasts. Southern Power may not be able to extend its existing PPAs or to find new buyers for existing generation assets as existing PPAs expire, or it may be forced to market these assets at prices lower than originally intended. These situations could have negative impacts on net income and cash flows for the affected traditional operating company or Southern Power and for Southern Company.
Energy conservation and energy price increases could negatively impact financial results.
Customers could voluntarily reduce their consumption of electricity in response to decreases in their disposable income, increases in energy price, or individual conservation efforts. In addition, a number of regulatory and legislative bodies have proposed or introduced requirements and/or incentives to reduce energy consumption by certain dates. Conservation programs could impact the financial results of Southern Company, the traditional operating companies, and Southern Power in different ways. For example, if any traditional operating company is required to invest in conservation measures that result in reduced sales from effective conservation, regulatory lag in adjusting rates for the impact of these measures could have a negative financial impact on such traditional operating company and Southern Company.
Certain of the traditional operating companies actively promote energy conservation programs, which have been approved by their respective state PSCs. Regulatory mechanisms have been established that provide for the recovery of costs related to such programs and lost revenues as a result of such programs. However, to the extent conservation results in reduced energy demand or significantly slows the growth in demand beyond what is anticipated, the value of generation assets of the traditional operating companies and Southern Power and other unregulated business activities could be adversely impacted and the traditional operating companies could be negatively impacted depending on the regulatory treatment of the associated impacts. In addition, the failure of those traditional operating companies who actively promote energy conservation programs to achieve the energy conservation targets established by their respective state PSCs could negatively impact such traditional operating companys ability to recover costs and receive certain benefits related to such programs.
I-29
Additionally, Southern Company, the traditional operating companies, and Southern Power could also be negatively impacted if any future energy price increases result in a decrease in customer usage.
Southern Company, the traditional operating companies, and Southern Power are unable to determine what impact, if any, conservation and increases in energy prices will have on their respective financial condition or results of operations.
The operating results of Southern Company, the traditional operating companies, and Southern Power are affected by weather conditions and may fluctuate on a seasonal and quarterly basis. In addition, significant weather events, such as hurricanes, tornadoes, floods, and droughts could result in substantial damage to or limit the operation of the properties of the traditional operating companies and Southern Power and could negatively impact results of operation, financial condition, and liquidity.
Electric power supply is generally a seasonal business. In many parts of the country, demand for power peaks during the summer months, with market prices also peaking at that time. In other areas, power demand peaks during the winter. As a result, the overall operating results of Southern Company, the traditional operating companies, and Southern Power may fluctuate substantially on a seasonal basis. In addition, the traditional operating companies and Southern Power have historically sold less power when weather conditions are milder. Unusually mild weather in the future could reduce the revenues, net income, available cash, and borrowing ability of Southern Company, the traditional operating companies, and Southern Power.
In addition, volatile or significant weather events could result in substantial damage to the transmission and distribution lines of the traditional operating companies and the generating facilities of the traditional operating companies and Southern Power. The traditional operating companies and Southern Power have significant investments in the Atlantic and Gulf Coast regions which could be subject to major storm activity. Further, severe drought conditions can reduce the availability of water and restrict or prevent the operation of certain generating facilities.
Each traditional operating company maintains a reserve for property damage to cover the cost of damages from weather events to its transmission and distribution lines and the cost of uninsured damages to its generating facilities and other property. In the event a traditional operating company experiences any of these weather events or any natural disaster or other catastrophic event, recovery of costs in excess of reserves and insurance coverage is subject to the approval of its state PSC. While the traditional operating companies generally are entitled to recover prudently incurred costs incurred in connection with such an event, any denial by the applicable state PSC or delay in recovery of any portion of such costs could have a material negative impact on a traditional operating companys and Southern Companys results of operations, financial condition, and liquidity.
In addition, damages resulting from significant weather events within the service territory of any traditional operating company or affecting Southern Powers customers may result in the loss of customers and reduced demand for electricity for extended periods. For example, Hurricane Katrina hit the Gulf Coast of Mississippi in 2005 and caused substantial damage within Mississippi Powers service territory. As of December 31, 2011, Mississippi Power had over 8,300 fewer retail customers as compared to pre-storm levels due to obstacles in the rebuilding process as a result of the storm, coupled with the recessionary economy. Any significant loss of customers or reduction in demand for electricity could have a material negative impact on a traditional operating companys, Southern Powers, and Southern Companys results of operations, financial condition, and liquidity.
I-30
The business of Southern Company, the traditional operating companies, and Southern Power is dependent on their ability to successfully access funds through capital markets and financial institutions. The inability of Southern Company, any traditional operating company, or Southern Power to access funds may limit its ability to execute its business plan by impacting its ability to fund capital investments or acquisitions that Southern Company, the traditional operating companies, or Southern Power may otherwise rely on to achieve future earnings and cash flows.
Southern Company, the traditional operating companies, and Southern Power rely on access to both short-term money markets and longer-term capital markets as a significant source of liquidity for capital requirements not satisfied by the cash flow from their respective operations. If Southern Company, any traditional operating company, or Southern Power is not able to access capital at competitive rates, its ability to implement its business plan will be limited by impacting its ability to fund capital investments or acquisitions that Southern Company, the traditional operating companies, or Southern Power may otherwise rely on to achieve future earnings and cash flows. In addition, Southern Company, the traditional operating companies, and Southern Power rely on committed bank lending agreements as back-up liquidity which allows them to access low cost money markets. Each of Southern Company, the traditional operating companies, and Southern Power believes that it will maintain sufficient access to these financial markets based upon current credit ratings. However, certain market disruptions may increase the cost of borrowing or adversely affect the ability to raise capital through the issuance of securities or other borrowing arrangements or the ability to secure committed bank lending agreements used as back-up sources of capital. Such disruptions could include:
| an economic downturn or uncertainty; |
| the bankruptcy or financial distress at an unrelated energy company, financial institution, or sovereign entity; |
| capital markets volatility and disruption, both nationally and internationally; |
| market prices for electricity and gas; |
| terrorist attacks or threatened attacks on Southern Companys facilities or unrelated energy companies facilities; |
| war or threat of war; or |
| the overall health of the utility and financial institution industries. |
Market performance and other changes may decrease the value of benefit plans and nuclear decommissioning trust assets or may increase plan costs, which then could require significant additional funding.
The performance of the capital markets affects the values of the assets held in trust under Southern Companys pension and postretirement benefit plans and the assets held in trust to satisfy obligations to decommission Alabama Powers and Georgia Powers nuclear plants. Southern Company, Alabama Power, and Georgia Power have significant obligations in these areas and hold significant assets in these trusts. These assets are subject to market fluctuations and will yield uncertain returns, which may fall below projected return rates. A decline in the market value of these assets, as has been experienced in prior periods, may increase the funding requirements relating to benefit plan liabilities of the Southern Company system and Alabama Powers and Georgia Powers nuclear decommissioning obligations. Additionally, changes in interest rates affect the liabilities under pension and postretirement benefit plans of the Southern Company system; as interest rates decrease, the liabilities increase, potentially requiring additional funding. Further, changes in demographics, including increased numbers of retirements or changes in life expectancy assumptions, may also increase the funding requirements of the obligations related to the pension benefit plans. Southern Company and its subsidiaries are also facing rising medical benefit costs, including the current costs for active and retired employees. It is possible that these costs may increase at a rate that is significantly higher than anticipated. If the Southern Company system is unable to successfully manage
I-31
benefit plan assets and medical benefit costs and Alabama Power and Georgia Power are unable to successfully manage the nuclear decommissioning trust funds, results of operations and financial position could be negatively affected.
Southern Company may be unable to recover its investment in its leveraged leases if a lessee fails to profitably operate the leased assets.
Southern Company has several leveraged lease agreements, with terms ranging up to 45 years, which relate to international and domestic energy generation, distribution, and transportation assets. Southern Company receives federal income tax deductions for depreciation and amortization, as well as interest on long-term debt related to these investments. Southern Company reviews all important lease assumptions at least annually, or more frequently if events or changes in circumstances indicate that a change in assumptions has occurred or may occur. With respect to Southern Companys investments in leveraged leases, the recovery of its investment is dependent on the profitable operation of the leased assets by the respective lessees. A significant deterioration in the performance of the leased asset could result in the impairment of the related lease receivable.
Southern Company, the traditional operating companies, and Southern Power are subject to risks associated with their ability to obtain adequate insurance.
The financial condition of some insurance companies, the threat of terrorism, and natural disasters, among other things, could have disruptive effects on insurance markets. The availability of insurance covering risks that Southern Company, the traditional operating companies, Southern Power, and their respective competitors typically insure against may decrease, and the insurance that Southern Company, the traditional operating companies, and Southern Power are able to obtain may have higher deductibles, higher premiums, and more restrictive policy terms. Further, while Southern Company, the traditional operating companies, and Southern Power maintain an amount of insurance protection that they consider adequate, there is no guarantee that the insurance policies selected by them will cover all of the potential exposures or the actual amount of loss incurred.
Any losses not covered by insurance could adversely affect the results of operations, cash flows, or financial condition of Southern Company, the traditional operating companies, or Southern Power.
The net income of Southern Company, the traditional operating companies, and Southern Power could be negatively impacted by a wholesale electric market structure in which Southern Company could not be competitive with other market participants.
Competition at the wholesale level continues to evolve in the electricity markets. As a result of changes in federal law, regulatory uncertainty, and industry restructuring, competing in the wholesale electricity markets has become more challenging. FERC rules related to transmission are intended to spur the development of new transmission infrastructure as well as facilitate competition in the wholesale market by providing more choices to wholesale power customers, including initiatives designed to promote and encourage the integration of renewable sources of supply. However, transmission regulation impacts wholesale transaction structures, and generation regulation may impact wholesale markets. In addition to the impacts on transactions contemplating physical delivery of energy, financial laws and regulations impact power hedging and trading based on futures contracts and derivatives that are traded on various commodities exchanges as well as over-the-counter. Finally, technology changes in the power and fuel industries continue to create significant impacts to wholesale transaction cost structures. Southern Company, the traditional operating companies, and Southern Power cannot predict the impact of these and other such developments, nor can they predict the effect of changes in levels of wholesale supply and demand, which are typically driven by factors beyond their control.
Item 1B. UNRESOLVED STAFF COMMENTS.
None.
I-32
Electric Properties
The traditional operating companies, Southern Power, and SEGCO, at December 31, 2011, owned and/or operated 33 hydroelectric generating stations, 34 fossil fuel generating stations, three nuclear generating stations, and 13 combined cycle/cogeneration stations, two solar facilities, and one landfill gas facility. The amounts of capacity for each company are shown in the table below.
Generating Station | Location | Nameplate Capacity (1) |
||||
(KWs) | ||||||
FOSSIL STEAM |
||||||
Gadsden |
Gadsden, AL | 120,000 | ||||
Gorgas |
Jasper, AL | 1,221,250 | ||||
Barry |
Mobile, AL | 1,525,000 | ||||
Greene County |
Demopolis, AL | 300,000 | (2) | |||
Gaston Unit 5 |
Wilsonville, AL | 880,000 | ||||
Miller |
Birmingham, AL | 2,532,288 | (3) | |||
|
|
|||||
Alabama Power Total |
6,578,538 | |||||
|
|
|||||
Bowen |
Cartersville, GA | 3,160,000 | ||||
Branch |
Milledgeville, GA | 1,539,700 | (4) | |||
Hammond |
Rome, GA | 800,000 | ||||
Kraft |
Port Wentworth, GA | 281,136 | ||||
McDonough Unit 1 |
Atlanta, GA | 245,000 | (5) | |||
McIntosh |
Effingham County, GA | 163,117 | ||||
McManus |
Brunswick, GA | 115,000 | ||||
Mitchell |
Albany, GA | 125,000 | ||||
Scherer |
Macon, GA | 750,924 | (6) | |||
Wansley |
Carrollton, GA | 925,550 | (7) | |||
Yates |
Newnan, GA | 1,250,000 | ||||
|
|
|||||
Georgia Power Total |
9,355,427 | |||||
|
|
|||||
Crist |
Pensacola, FL | 970,000 | ||||
Daniel |
Pascagoula, MS | 500,000 | (8) | |||
Lansing Smith |
Panama City, FL | 305,000 | ||||
Scholz |
Chattahoochee, FL | 80,000 | ||||
Scherer Unit 3 |
Macon, GA | 204,500 | (6) | |||
|
|
|||||
Gulf Power Total |
2,059,500 | |||||
|
|
|||||
Daniel |
Pascagoula, MS | 500,000 | (8) | |||
Eaton |
Hattiesburg, MS | 67,500 | ||||
Greene County |
Demopolis, AL | 200,000 | (2) | |||
Sweatt |
Meridian, MS | 80,000 | ||||
Watson |
Gulfport, MS | 1,012,000 | ||||
|
|
|||||
Mississippi Power Total |
1,859,500 | |||||
|
|
|||||
Gaston Units 1-4 |
Wilsonville, AL | |||||
SEGCO Total |
1,000,000 | (9) | ||||
|
|
|||||
Total Fossil Steam |
20,852,965 | |||||
|
|
|||||
NUCLEAR STEAM |
||||||
Farley |
Dothan, AL | |||||
Alabama Power Total |
1,720,000 | |||||
|
|
|||||
Hatch |
Baxley, GA | 899,612 | (10) | |||
Vogtle |
Augusta, GA | 1,060,240 | (11) | |||
|
|
|||||
Georgia Power Total |
1,959,852 | |||||
|
|
|||||
Total Nuclear Steam |
3,679,852 | |||||
|
|
|||||
COMBUSTION TURBINES |
||||||
Greene County |
Demopolis, AL | |||||
Alabama Power Total |
720,000 | |||||
|
|
|||||
Boulevard |
Savannah, GA | 59,100 | ||||
Bowen |
Cartersville, GA | 39,400 | ||||
Intercession City |
Intercession City, FL | 47,667 | (12) | |||
Kraft |
Port Wentworth, GA | 22,000 | ||||
McDonough Unit 3 |
Atlanta, GA | 78,800 | ||||
McIntosh Units 1 through 8 |
Effingham County, GA | 640,000 | ||||
McManus |
Brunswick, GA | 481,700 | ||||
Mitchell |
Albany, GA | 118,200 | (13) | |||
Robins |
Warner Robins, GA | 158,400 | ||||
Wansley |
Carrollton, GA | 26,322 | (7) | |||
Wilson |
Augusta, GA | 354,100 | ||||
|
|
|||||
Georgia Power Total |
2,025,689 | |||||
|
|
|||||
Lansing Smith Unit A |
Panama City, FL | 39,400 | ||||
Pea Ridge Units 1-3 |
Pea Ridge, FL | 15,000 | ||||
|
|
|||||
Gulf Power Total |
54,400 | |||||
|
|
|||||
Chevron Cogenerating Station |
Pascagoula, MS | 147,292 | (14) | |||
Sweatt |
Meridian, MS | 39,400 |
I-33
Generating Station | Location | Nameplate Capacity (1) |
||||
(KWs) | ||||||
Watson |
Gulfport, MS | 39,360 | ||||
|
|
|||||
Mississippi Power Total |
226,052 | |||||
|
|
|||||
Dahlberg |
Jackson County, GA | 756,000 | ||||
Oleander |
Cocoa, FL | 791,301 | ||||
Rowan |
Salisbury, NC | 455,250 | ||||
West Georgia |
Thomaston, GA | 668,800 | ||||
|
|
|||||
Southern Power Total |
2,671,351 | |||||
|
|
|||||
Gaston (SEGCO) |
Wilsonville, AL | 19,680 | (9) | |||
|
|
|||||
Total Combustion Turbines |
5,717,172 | |||||
|
|
|||||
COGENERATION |
||||||
Washington County |
Washington County, AL | 123,428 | ||||
GE Plastics Project |
Burkeville, AL | 104,800 | ||||
Theodore |
Theodore, AL | 236,418 | ||||
|
|
|||||
Total Cogeneration |
464,646 | |||||
|
|
|||||
COMBINED CYCLE |
||||||
Barry |
Mobile, AL | |||||
Alabama Power Total |
1,070,424 | |||||
|
|
|||||
McIntosh Units 10&11 |
Effingham County, GA | 1,318,920 | ||||
McDonough Unit 4 |
Atlanta, GA | 840,000 | ||||
|
|
|||||
Georgia Power Total |
2,158,920 | |||||
|
|
|||||
Smith |
Lynn Haven, FL | |||||
Gulf Power Total |
545,500 | |||||
|
|
|||||
Daniel |
Pascagoula, MS | |||||
Mississippi Power Total |
1,070,424 | |||||
|
|
|||||
Franklin |
Smiths, AL | 1,857,820 | ||||
Harris |
Autaugaville, AL | 1,318,920 | ||||
Rowan |
Salisbury, NC | 530,550 | ||||
Stanton Unit A |
Orlando, FL | 428,649 | (15) | |||
Wansley |
Carrollton, GA | 1,073,000 | ||||
|
|
|||||
Southern Power Total |
5,208,939 | |||||
|
|
|||||
Total Combined Cycle |
10,054,207 | |||||
|
|
|||||
HYDROELECTRIC FACILITIES |
||||||
Bankhead |
Holt, AL | 53,985 | ||||
Bouldin |
Wetumpka, AL | 225,000 | ||||
Harris |
Wedowee, AL | 132,000 | ||||
Henry |
Ohatchee, AL | 72,900 | ||||
Holt |
Holt, AL | 46,944 | ||||
Jordan |
Wetumpka, AL | 100,000 | ||||
Lay |
Clanton, AL | 177,000 | ||||
Lewis Smith |
Jasper, AL | 157,500 | ||||
Logan Martin |
Vincent, AL | 135,000 | ||||
Martin |
Dadeville, AL | 182,000 | ||||
Mitchell |
Verbena, AL | 170,000 | ||||
Thurlow |
Tallassee, AL | 81,000 | ||||
Weiss |
Leesburg, AL | 87,750 | ||||
Yates |
Tallassee, AL | 47,000 | ||||
|
|
|||||
Alabama Power Total |
1,668,079 | |||||
|
|
|||||
Bartletts Ferry |
Columbus, GA | 173,000 | ||||
Goat Rock |
Columbus, GA | 38,600 | ||||
Lloyd Shoals |
Jackson, GA | 14,400 | ||||
Morgan Falls |
Atlanta, GA | 16,800 | ||||
North Highlands |
Columbus, GA | 29,600 | ||||
Oliver Dam |
Columbus, GA | 60,000 | ||||
Rocky Mountain |
Rome, GA | 215,256 | (16) | |||
Sinclair Dam |
Milledgeville, GA | 45,000 | ||||
Tallulah Falls |
Clayton, GA | 72,000 | ||||
Terrora |
Clayton, GA | 16,000 | ||||
Tugalo |
Clayton, GA | 45,000 | ||||
Wallace Dam |
Eatonton, GA | 321,300 | ||||
Yonah |
Toccoa, GA | 22,500 | ||||
6 Other Plants |
18,080 | |||||
|
|
|||||
Georgia Power Total |
1,087,536 | |||||
|
|
|||||
Total Hydroelectric Facilities |
2,755,615 | |||||
|
|
|||||
RENEWABLE SOURCES: |
||||||
SOLAR FACILITIES |
||||||
Cimarron |
Springer, NM | |||||
Southern Power Total |
27,360 | (17) | ||||
|
|
|||||
Dalton |
Dalton, GA | |||||
Georgia Power Total |
350 | |||||
|
|
|||||
Total Solar |
27,710 | |||||
|
|
|||||
LANDFILL GAS FACILITY |
||||||
Perdido |
Escambia County, FL | |||||
Gulf Power Total |
3,200 | |||||
|
|
|||||
Total Generating Capacity |
43,555,367 | |||||
|
|
Notes:
(1) | See Jointly-Owned Facilities herein for additional information. |
I-34
(2) | Owned by Alabama Power and Mississippi Power as tenants in common in the proportions of 60% and 40%, respectively. |
(3) | Capacity shown is Alabama Powers portion (91.84%) of total plant capacity. |
(4) | Branch Units 1 and 2 are scheduled to be retired on December 31, 2013 and October 1, 2013, respectively. |
(5) | McDonough Unit 1 (245,000 KWs) is scheduled to be retired in April 2012. |
(6) | Capacity shown for Georgia Power is 8.4% of Units 1 and 2 and 75% of Unit 3. Capacity shown for Gulf Power is 25% of Unit 3. |
(7) | Capacity shown is Georgia Powers portion (53.5%) of total plant capacity. |
(8) | Represents 50% of the plant which is owned as tenants in common by Gulf Power and Mississippi Power. |
(9) | SEGCO is jointly-owned by Alabama Power and Georgia Power. See BUSINESS in Item 1 herein for additional information. |
(10) | Capacity shown is Georgia Powers portion (50.1%) of total plant capacity. |
(11) | Capacity shown is Georgia Powers portion (45.7%) of total plant capacity. |
(12) | Capacity shown represents 33 1/3% of total plant capacity. Georgia Power owns a 1/3 interest in the unit with 100% use of the unit from June through September. Progress Energy Florida operates the unit. |
(13) | Mitchell Unit 4C (39,400 KWs) is scheduled to be retired in March 2012. |
(14) | Generation is dedicated to a single industrial customer. |
(15) | Capacity shown is Southern Powers portion (65%) of total plant capacity. |
(16) | Capacity shown is Georgia Powers portion (25.4%) of total plant capacity. OPC operates the plant. |
(17) | Capacity shown is Southern Powers portion (90%) of the total plant capacity. |
Except as discussed below under Titles to Property, the principal plants and other important units of the traditional operating companies, Southern Power, and SEGCO are owned in fee by the respective companies. It is the opinion of management of each such company that its operating properties are adequately maintained and are substantially in good operating condition.
Mississippi Power owns a 79-mile length of 500-kilovolt transmission line which is leased to Entergy Gulf States. The line, completed in 1984, extends from Plant Daniel to the Louisiana state line. Entergy Gulf States is paying a use fee over a 40-year period covering all expenses and the amortization of the original $57 million cost of the line. At December 31, 2011, the unamortized portion of this cost was approximately $18.3 million.
In 2011, the maximum demand on the traditional operating companies, Southern Power, and SEGCO was 36,956,000 KWs and occurred on August 3, 2011. The all-time maximum demand of 38,777,000 KWs on the traditional operating companies, Southern Power, and SEGCO occurred on August 22, 2007. These amounts exclude demand served by capacity retained by MEAG Power, OPC, and SEPA. The reserve margin for the traditional operating companies, Southern Power, and SEGCO in 2011 was 19.2%. See SELECTED FINANCIAL DATA in Item 6 herein for additional information on peak demands for each registrant.
I-35
Jointly-Owned Facilities
Alabama Power, Georgia Power, and Southern Power have undivided interests in certain generating plants and other related facilities to or from non-affiliated parties. The percentages of ownership are as follows:
Percentage Ownership | ||||||||||||||||||||||||||||||||||||||||||||||||
Total Capacity |
Alabama Power |
Power South |
Georgia Power |
OPC | MEAG Power |
Dalton | Progress Energy Florida |
Southern Power |
OUC | FMPA | KUA | |||||||||||||||||||||||||||||||||||||
(MWs | ) | |||||||||||||||||||||||||||||||||||||||||||||||
Plant Miller Units 1 and 2 |
1,320 | 91.8 | % | 8.2 | % | | % | | % | | % | | % | | % | | % | | % | | % | | % | |||||||||||||||||||||||||
Plant Hatch |
1,796 | | | 50.1 | 30.0 | 17.7 | 2.2 | | | | | | ||||||||||||||||||||||||||||||||||||
Plant Vogtle Units 1 and 2 |
2,320 | | | 45.7 | 30.0 | 22.7 | 1.6 | | | | | | ||||||||||||||||||||||||||||||||||||
Plant Scherer Units 1 and 2 |
1,636 | | | 8.4 | 60.0 | 30.2 | 1.4 | | | | | | ||||||||||||||||||||||||||||||||||||
Plant Wansley |
1,779 | | | 53.5 | 30.0 | 15.1 | 1.4 | | | | | | ||||||||||||||||||||||||||||||||||||
Rocky Mountain |
848 | | | 25.4 | 74.6 | | | | | | | | ||||||||||||||||||||||||||||||||||||
Intercession City, FL |
143 | | | 33.3 | | | | 66.7 | | | | | ||||||||||||||||||||||||||||||||||||
Plant Stanton A |
660 | | | | | | | | 65 | % | 28 | % | 3.5 | % | 3.5 | % |
Alabama Power and Georgia Power have contracted to operate and maintain the respective units in which each has an interest (other than Rocky Mountain and Intercession City) as agent for the joint owners. SCS provides operation and maintenance services for Plant Stanton A.
In addition, Georgia Power has commitments regarding a portion of a 5% interest in Plant Vogtle Units 1 and 2 owned by MEAG Power that are in effect until the later of retirement of the plant or the latest stated maturity date of MEAG Powers bonds issued to finance such ownership interest. The payments for capacity are required whether any capacity is available. The energy cost is a function of each units variable operating costs. Except for the portion of the capacity payments related to the Georgia PSCs disallowances of Plant Vogtle Units 1 and 2 costs, the cost of such capacity and energy is included in purchased power from non-affiliates in Georgia Powers statements of income in Item 8 herein. Also see Note 7 to the financial statements of Georgia Power under Commitments Purchased Power Commitments in Item 8 herein for additional information.
Titles to Property
The traditional operating companies, Southern Powers, and SEGCOs interests in the principal plants (other than certain pollution control facilities and the land on which five combustion turbine generators of Mississippi Power are located, which is held by easement) and other important units of the respective companies are owned in fee by such companies, subject only to the liens pursuant to pollution control revenue bonds of Alabama Power and Gulf Power on specific pollution control facilities and liens pursuant to the assumption of debt obligations by Mississippi Power in connection with the acquisition of Plant Daniel Units 3 and 4. See Note 6 to the financial statements of Southern Company, Alabama Power, Gulf Power, and Mississippi Power under Assets Subject to Lien in Item 8 herein for additional information. The traditional operating companies own the fee interests in certain of their principal plants as tenants in common. See Jointly-Owned Facilities herein for additional information. Properties such as electric transmission and distribution lines and steam heating mains are constructed principally on rights-of-way which are maintained under franchise or are held by easement only. A substantial portion of lands submerged by reservoirs is held under flood right easements.
I-36
(1) United States of America v. Alabama Power (United States District Court for the Northern District of Alabama)
United States of America v. Georgia Power (United States District Court for the Northern District of Georgia)
See Note 3 to the financial statements of Southern Company and each traditional operating company under Environmental Matters New Source Review Actions in Item 8 herein for information.
(2) Comer, et al. v. Murphy Oil USA, Inc. (United States District Court for the Southern District of Mississippi)
See Note 3 to the financial statements of Alabama Power, Georgia Power, Gulf Power, and Southern Power under Climate Change Litigation Hurricane Katrina Case in Item 8 herein for information.
(3) Environmental Remediation
See Note 3 to the financial statements of Southern Company, Georgia Power, Gulf Power, and Mississippi Power under Environmental Matters Environmental Remediation in Item 8 herein for information related to environmental remediation.
See Note 3 to the financial statements of each registrant in Item 8 herein for descriptions of additional legal and administrative proceedings discussed therein.
Item 4. MINE SAFETY DISCLOSURES
Not applicable.
I-37
EXECUTIVE OFFICERS OF SOUTHERN COMPANY
(Identification of executive officers of Southern Company is inserted in Part I in accordance with Regulation S-K, Item 401(b), Instruction 3.) The ages of the officers set forth below are as of December 31, 2011.
Thomas A. Fanning
Chairman, President, Chief Executive Officer, and Director
Age 54
Elected in 2003. Chairman and Chief Executive Officer since December 1, 2010 and President since August 1, 2010. Previously served as Executive Vice President and Chief Operating Officer from February 2008 through July 31, 2010. He also served as Executive Vice President and Chief Financial Officer from May 2007 through January 2008 and Executive Vice President, Chief Financial Officer, and Treasurer from April 2003 to May 2007.
Art P. Beattie
Executive Vice President and Chief Financial Officer
Age 57
Elected in 2010. Executive Vice President and Chief Financial Officer since August 13, 2010. Previously served as Executive Vice President, Chief Financial Officer, and Treasurer of Alabama Power from February 2005 through August 12, 2010.
W. Paul Bowers
Executive Vice President
Age 55
Elected in 2001. Chief Executive Officer, President, and Director of Georgia Power since December 31, 2010 and Chief Operating Officer of Georgia Power from August 13, 2010 to December 31, 2010. He previously served as Executive Vice President and Chief Financial Officer of Southern Company from February 2008 to August 12, 2010. He also served as Executive Vice President of Southern Company from May 2007 to February 2008 and as President of Southern Company Generation, a business unit of Southern Company, and Executive Vice President of SCS from May 2001 through January 2008.
Mark A. Crosswhite
President and Chief Executive Officer of Gulf Power
Age 49
Elected in 2010. President, Chief Executive Officer, and Director of Gulf Power since January 1, 2011. Previously served as Executive Vice President of External Affairs at Alabama Power from February 2008 through December 2010 and Senior Vice President and Counsel of Alabama Power from July 2006 through January 2008. He also served as Vice President of SCS from March 2004 through January 2008.
Edward Day, VI
President and Chief Executive Officer of Mississippi Power
Age 51
Elected in 2010. President, Chief Executive Officer, and Director of Mississippi Power since August 13, 2010. Previously served as Executive Vice President for Engineering and Construction Services at Southern Company Generation, a business unit of Southern Company, from May 2003 to August 12, 2010.
G. Edison Holland, Jr.
Executive Vice President, General Counsel, and Secretary
Age 59
Elected in 2001. Secretary since April 2005 and Executive Vice President and General Counsel since April 2001.
Stephen E. Kuczynski
President and Chief Executive Officer of Southern Nuclear
Age 49
Elected in 2011. President and Chief Executive Officer of Southern Nuclear since July 11, 2011. Before joining Southern Company, Mr. Kuczynski served at Exelon Corporation as the Senior Vice President of Engineering and Technical Services for Exelon Nuclear from February 2006 to June 2011.
I-38
Charles D. McCrary
Executive Vice President
Age 60
Elected in 1998. Executive Vice President since February 2002. He also serves as President, Chief Executive Officer, and Director of Alabama Power since October 2001.
Susan N. Story
Executive Vice President
Age 51
Elected in 2003. President and Chief Executive Officer of SCS since January 1, 2011. Previously served as President, Chief Executive Officer, and Director of Gulf Power from April 2003 through December 2010.
Anthony J. Topazi
Executive Vice President and Chief Operating Officer
Age 61
Elected in 2003. Executive Vice President and Chief Operating Officer since August 13, 2010. Previously served as President, Chief Executive Officer, and Director of Mississippi Power from January 2004 through August 12, 2010.
Christopher C. Womack
Executive Vice President
Age 53
Elected in 2008. Executive Vice President and President of External Affairs since January 1, 2009. Previously served as Executive Vice President of External Affairs of Georgia Power from March 2006 through December 2008.
The officers of Southern Company were elected for a term running from the first meeting of the directors following the last annual meeting (May 25, 2011) for one year or until their successors are elected and have qualified, except for Mr. Kuczynski whose election was effective July 11, 2011.
I-39
EXECUTIVE OFFICERS OF ALABAMA POWER
(Identification of executive officers of Alabama Power is inserted in Part I in accordance with Regulation S-K, Item 401(b), Instruction 3.) The ages of the officers set forth below are as of December 31, 2011.
Charles D. McCrary
President, Chief Executive Officer, and Director
Age 60
Elected in 2001. President, Chief Executive Officer, and Director since October 2001. Since February 2002, he has also served as Executive Vice President of Southern Company.
Philip C. Raymond
Executive Vice President, Chief Financial Officer, and Treasurer
Age 52
Elected in 2010. Executive Vice President, Chief Financial Officer, and Treasurer since August 13, 2010. Previously served as Vice President and Chief Financial Officer of Gulf Power from May 2008 to August 12, 2010 and as Vice President and Comptroller of Alabama Power from January 2005 to April 2008.
Zeke W. Smith
Executive Vice President
Age 52
Elected in 2010. Executive Vice President of External Affairs since November 8, 2010. Previously served as Vice President of Regulatory Services and Financial Planning from February 2005 to November 2010.
Steven R. Spencer
Executive Vice President
Age 56
Elected in 2001. Executive Vice President of the Customer Service Organization since February 1, 2008. Previously served as Executive Vice President of External Affairs from 2001 through January 2008.
Theodore J. McCullough
Senior Vice President and Senior Production Officer
Age 48
Elected in 2010. Senior Vice President and Senior Production Officer since June 30, 2010. Previously served as Vice President and Senior Production Officer of Gulf Power from September 2007 until June 2010, and Manager of Georgia Powers Plant Branch from December 2003 to August 2007.
The officers of Alabama Power were elected for a term running from the meeting of the directors held on April 22, 2011 for one year or until their successors are elected and have qualified.
I-40
EXECUTIVE OFFICERS OF GEORGIA POWER
(Identification of executive officers of Georgia Power is inserted in Part I in accordance with Regulation S-K, Item 401(b), Instruction 3.) The ages of the officers set forth below are as of December 31, 2011.
W. Paul Bowers
President, Chief Executive Officer, and Director
Age 55
Elected in 2010. Chief Executive Officer, President, and Director since December 31, 2010 and Chief Operating Officer of Georgia Power from August 13, 2010 to December 31, 2010. He previously served as Executive Vice President and Chief Financial Officer of Southern Company from February 2008 to August 12, 2010. He also served as Executive Vice President of Southern Company from May 2007 to February 2008 and as President of Southern Company Generation, a business unit of Southern Company, and Executive Vice President of SCS from May 2001 through January 2008.
W. Craig Barrs
Executive Vice President
Age 54
Elected in 2008. Executive Vice President of External Affairs since January 2010. Previously served as Senior Vice President of External Affairs from January 2009 to January 2010, Vice President of Governmental and Regulatory Affairs from April 2008 to December 2008, and Vice President of the Coastal Region from August 2006 to March 2008.
Ronnie R. Labrato
Executive Vice President, Chief Financial Officer, and Treasurer
Age 58
Elected in 2009. Executive Vice President, Chief Financial Officer, and Treasurer since April 2009. Previously served as Vice President of Internal Auditing at SCS from April 2008 to March 2009 and Vice President and Chief Financial Officer of Gulf Power from July 2001 to March 2008.
Joseph A. Miller
Executive Vice President
Age 50
Elected in 2009. Executive Vice President of Nuclear Development since May 2009. He also serves as Executive Vice President of Nuclear Development at Southern Nuclear since February 2006.
Anthony L. Wilson
Executive Vice President
Age 47
Elected in 2011. Executive Vice President of Customer Service and Operations since January 1, 2012. Previously served as Vice President of Transmission from November 2009 to December 2011 and Vice President of Distribution from February 2007 to November 2009.
Thomas P. Bishop
Senior Vice President, Chief Compliance Officer, General Counsel, and Corporate Secretary
Age 51
Elected in 2008. Corporate Secretary since April 2011 and Senior Vice President, Chief Compliance Officer, and General Counsel since September 2008. Previously served as Vice President and Associate General Counsel for SCS from July 2004 to September 2008.
Stan W. Connally
Senior Vice President and Chief Production Officer
Age 42
Elected in 2010. Senior Vice President and Chief Production Officer since August 1, 2010. Previously served as Manager of Alabama Powers Plant Barry from August 2007 through July 2010 and Manager of Mississippi Powers Plant Daniel from November 2004 through August 2007.
I-41
The officers of Georgia Power were elected for a term running from the meeting of the directors held on May 18, 2011 for one year or until their successors are elected and have qualified, except for Mr. Wilson, whose election was effective January 1, 2012.
I-42
EXECUTIVE OFFICERS OF MISSISSIPPI POWER
(Identification of executive officers of Mississippi Power is inserted in Part I in accordance with Regulation S-K, Item 401(b), Instruction 3.) The ages of the officers set forth below are as of December 31, 2011.
Edward Day, VI
President, Chief Executive Officer, and Director
Age 51
Elected in 2010. President, Chief Executive Officer, and Director since August 13, 2010. Previously served as Executive Vice President for Engineering and Construction Services at Southern Company Generation, a business unit of Southern Company, from May 2003 to August 12, 2010.
Thomas O. Anderson, IV
Vice President
Age 52
Elected in 2009. Vice President of Generation Development since July 2009. Previously served as Project Director, Mississippi Power Generation Development from March 2008 to July 2009; Project Manager, Southern Power Generation from June 2007 to March 2008; and Generation Development Manager, SCS Generation Development from September 1998 to June 2007.
John W. Atherton
Vice President
Age 51
Elected in 2004. Vice President of External Affairs since January 2005.
Moses H. Feagin
Vice President, Treasurer, and Chief Financial Officer
Age 47
Elected in 2010. Vice President, Treasurer, and Chief Financial Officer since August 13, 2010. Previously served as Vice President and Comptroller of Alabama Power from May 2008 to August 12, 2010, and Comptroller of Mississippi Power from March 2005 to May 2008.
Jeff G. Franklin
Vice President
Age 44
Elected in 2011. Vice President of Customer Services Organization since August 1, 2011. Previously served as Georgia Powers Vice President of Governmental and Legislative Affairs from January 2011 to July 2011, Vice President of Governmental and Regulatory Affairs from March 2009 to January 2011, Vice President of Sales from July 2008 to April 2009, and Vice President of the Northwest region from February 2005 to June 2008.
R. Allen Reaves
Vice President
Age 52
Elected in 2010. Vice President and Senior Production Officer since August 1, 2010. Previously served as Manager of Mississippi Powers Plant Daniel from September 2007 through July 2010 and Site Manager for Southern Powers Plant Franklin from March 2006 to September 2007.
The officers of Mississippi Power were elected for a term running from the meeting of the directors held on April 27, 2011 for one year or until their successors are elected and have qualified, except for Mr. Franklin, whose election was effective August 1, 2011.
I-43
Item 5. | MARKET FOR REGISTRANTS COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES |
(a)(1) The common stock of Southern Company is listed and traded on the New York Stock Exchange. The common stock is also traded on regional exchanges across the United States. The high and low stock prices as reported on the New York Stock Exchange for each quarter of the past two years were as follows:
| ||||
High | Low | |||
2011 |
||||
First Quarter |
$38.79 | $36.51 | ||
Second Quarter |
40.87 | 37.43 | ||
Third Quarter |
43.09 | 35.73 | ||
Fourth Quarter |
46.69 | 41.00 | ||
2010 |
||||
First Quarter |
$33.73 | $30.85 | ||
Second Quarter |
35.45 | 32.04 | ||
Third Quarter |
37.73 | 33.00 | ||
Fourth Quarter |
38.62 | 37.10 | ||
|
There is no market for the other registrants common stock, all of which is owned by Southern Company.
(a)(2) Number of Southern Companys common stockholders of record at January 31, 2012: 154,700
Each of the other registrants have one common stockholder, Southern Company.
(a)(3) Dividends on each registrants common stock are payable at the discretion of their respective board of directors. The dividends on common stock declared by Southern Company and the traditional operating companies to their stockholder(s) for the past two years were as follows:
| ||||||||
Registrant | Quarter | 2011 | 2010 | |||||
| ||||||||
(in thousands) | ||||||||
Southern Company |
First | $385,010 | $359,144 | |||||
Second | 402,165 | 375,865 | ||||||
Third | 405,879 | 378,939 | ||||||
Fourth | 408,294 | 382,440 | ||||||
| ||||||||
Alabama Power |
First | 138,275 | 135,675 | |||||
Second | 138,275 | 135,675 | ||||||
Third | 138,275 | 135,675 | ||||||
Fourth | 359,275 | 178,675 | ||||||
| ||||||||
Georgia Power |
First | 224,025 | 205,000 | |||||
Second | 224,025 | 205,000 | ||||||
Third | 224,025 | 205,000 | ||||||
Fourth | 424,025 | 205,000 | ||||||
| ||||||||
Gulf Power |
First | 27,500 | 26,075 | |||||
Second | 27,500 | 26,075 | ||||||
Third | 27,500 | 26,075 | ||||||
Fourth | 27,500 | 26,075 | ||||||
| ||||||||
Mississippi Power |
First | 18,875 | 17,150 | |||||
Second | 18,875 | 17,150 | ||||||
Third | 18,875 | 17,150 | ||||||
Fourth | 18,875 | 17,150 | ||||||
|
II-1
In 2011 and 2010, Southern Power paid dividends to Southern Company as follows:
|
||||||||
Registrant | Quarter | 2011 | 2010 | |||||
|
||||||||
(in thousands) | ||||||||
Southern Power |
First | $22,800 | $26,775 | |||||
Second | 22,800 | 26,775 | ||||||
Third | 22,800 | 26,775 | ||||||
Fourth | 22,800 | 26,775 | ||||||
|
The dividend paid per share of Southern Companys common stock was 45.50¢ for the first quarter 2011 and 47.25¢ each for the second, third, and fourth quarters of 2011. In 2010, Southern Company paid a dividend per share of 43.75¢ for the first quarter and 45.50¢ each for the second, third, and fourth quarters.
The traditional operating companies and Southern Power can only pay dividends to Southern Company out of retained earnings or paid-in-capital.
Southern Powers senior note indenture contains potential limitations on the payment of common stock dividends. At December 31, 2011, Southern Power was in compliance with the conditions of this senior note indenture and thus had no restrictions on its ability to pay common stock dividends. See Note 8 to the financial statements of Southern Company under Common Stock Dividend Restrictions and Note 6 to the financial statements of Southern Power under Dividend Restrictions in Item 8 herein for additional information regarding these restrictions.
(a)(4) Securities authorized for issuance under equity compensation plans.
See Part III, Item 12. Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters under the heading Equity Compensation Plan Information herein.
(b) Use of Proceeds
Not applicable.
(c) Issuer Purchases of Equity Securities
None.
Item 6. SELECTED FINANCIAL DATA
Southern Company. See SELECTED CONSOLIDATED FINANCIAL AND OPERATING DATA, contained herein at pages II-110 and II-111.
Alabama Power. See SELECTED FINANCIAL AND OPERATING DATA, contained herein at pages II-188 and II-189.
Georgia Power. See SELECTED FINANCIAL AND OPERATING DATA, contained herein at pages II-272 and II-273.
Gulf Power. See SELECTED FINANCIAL AND OPERATING DATA, contained herein at pages II-343 and II-344.
Mississippi Power. See SELECTED FINANCIAL AND OPERATING DATA, contained herein at pages II-427 and II-428.
Southern Power. See SELECTED CONSOLIDATED FINANCIAL AND OPERATING DATA, contained herein at page II-478.
II-2
Item 7. | MANAGEMENTS DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS |
Southern Company. See MANAGEMENTS DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS, contained herein at pages II-11 through II-45.
Alabama Power. See MANAGEMENTS DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS, contained herein at pages II-115 through II-139.
Georgia Power. See MANAGEMENTS DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS, contained herein at pages II-193 through II-221.
Gulf Power. See MANAGEMENTS DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS, contained herein at pages II-277 through II-301.
Mississippi Power. See MANAGEMENTS DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS, contained herein at pages II-348 through II-376.
Southern Power. See MANAGEMENTS DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS, contained herein at pages II-432 through II-452.
Item 7A. | QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK |
See MANAGEMENTS DISCUSSION AND ANALYSIS FINANCIAL CONDITION AND LIQUIDITY Market Price Risk of each of the registrants in Item 7 herein and Note 1 of each of the registrants financial statements under Financial Instruments in Item 8 herein. See also Note 10 to the financial statements of Southern Company, Alabama Power, and Georgia Power, Note 9 to the financial statements of Gulf Power and Mississippi Power, and Note 8 to the financial statements of Southern Power in Item 8 herein.
II-3
Item 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA
INDEX TO 2011 FINANCIAL STATEMENTS
II-4
Item 9. | CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL DISCLOSURE |
None.
II-5
Item 9A. CONTROLS AND PROCEDURES
Disclosure Controls And Procedures.
As of the end of the period covered by this annual report, Southern Company, Alabama Power, Georgia Power, Gulf Power, Mississippi Power, and Southern Power conducted separate evaluations under the supervision and with the participation of each companys management, including the Chief Executive Officer and Chief Financial Officer, of the effectiveness of the design and operation of the disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) of the Securities Exchange Act of 1934). Based upon these evaluations, the Chief Executive Officer and the Chief Financial Officer, in each case, concluded that the disclosure controls and procedures are effective.
Internal Control Over Financial Reporting.
(a) Managements Annual Report on Internal Control Over Financial Reporting.
Southern Companys Managements Report on Internal Control Over Financial Reporting is included on page II-9 of this Form 10-K.
Alabama Powers Managements Report on Internal Control Over Financial Reporting is included on page II-113 of this Form 10-K.
Georgia Powers Managements Report on Internal Control Over Financial Reporting is included on page II-191 of this Form 10-K.
Gulf Powers Managements Report on Internal Control Over Financial Reporting is included on page II-275 of this Form 10-K.
Mississippi Powers Managements Report on Internal Control Over Financial Reporting is included on page II-346 of this Form 10-K.
Southern Powers Managements Report on Internal Control Over Financial Reporting is included on page II-430 of this Form 10-K.
(b) Attestation Report of the Registered Public Accounting Firm.
The report of Deloitte & Touche LLP, Southern Companys independent registered public accounting firm, regarding Southern Companys internal control over financial reporting is included on page II-10 of this Form 10-K.
Not applicable to Alabama Power, Georgia Power, Gulf Power, Mississippi Power, and Southern Power because these companies are not accelerated filers or large accelerated filers.
(c) Changes in internal controls.
There have been no changes in Southern Companys and Georgia Powers internal control over financial reporting (as such term is defined in Rules 13a-15(f) and 15d-15(f) under the Securities Exchange Act of 1934) during the fourth quarter 2011 that have materially affected or are reasonably likely to materially affect Southern Companys and Georgia Powers internal control over financial reporting, other than as described in the next sentence. In October 2011, Georgia Power implemented new accounts payable, supply chain, and work management systems. The implementation of these systems provides additional operational and internal control benefits including system security and automation of previously manual controls. These process improvement initiatives were not in response to an identified internal control deficiency.
There have been no changes in Alabama Powers, Gulf Powers, Mississippi Powers, or Southern Powers internal control over financial reporting (as such term is defined in Rules 13a-15(f) and 15d-15(f) under the Securities Exchange Act of 1934) during the fourth quarter 2011 that have materially affected or are reasonably likely to materially affect Alabama Powers, Gulf Powers, Mississippi Powers, or Southern Powers internal control over financial reporting.
II-6
Item 9B. | OTHER INFORMATION |
None.
II-7
AND SUBSIDIARY COMPANIES
FINANCIAL SECTION
II-8
MANAGEMENTS REPORT ON INTERNAL CONTROL OVER FINANCIAL REPORTING
Southern Company and Subsidiary Companies 2011 Annual Report
The management of The Southern Company (Southern Company) is responsible for establishing and maintaining an adequate system of internal control over financial reporting as required by the Sarbanes-Oxley Act of 2002 and as defined in Exchange Act Rule 13a-15(f). A control system can provide only reasonable, not absolute, assurance that the objectives of the control system are met.
Under managements supervision, an evaluation of the design and effectiveness of Southern Companys internal control over financial reporting was conducted based on the framework in Internal ControlIntegrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on this evaluation, management concluded that Southern Companys internal control over financial reporting was effective as of December 31, 2011.
Deloitte & Touche LLP, an independent registered public accounting firm, as auditors of Southern Companys financial statements, has issued an attestation report on the effectiveness of Southern Companys internal control over financial reporting as of December 31, 2011. Deloitte & Touche LLPs report on Southern Companys internal control over financial reporting is included herein.
/s/ Thomas A. Fanning
Thomas A. Fanning
Chairman, President, and Chief Executive Officer
/s/ Art P. Beattie
Art P. Beattie
Executive Vice President and Chief Financial Officer
February 24, 2012
II-9
REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM
To the Board of Directors and Stockholders of
The Southern Company
We have audited the accompanying consolidated balance sheets and consolidated statements of capitalization of The Southern Company and Subsidiary Companies (the Company) as of December 31, 2011 and 2010, and the related consolidated statements of income, comprehensive income, stockholders equity, and cash flows for each of the three years in the period ended December 31, 2011. Our audits also included the financial statement schedule of the Company listed in the Index at Item 15. We also have audited the Companys internal control over financial reporting as of December 31, 2011, based on criteria established in Internal Control Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission. The Companys management is responsible for these financial statements and the financial statement schedule, for maintaining effective internal control over financial reporting, and for its assessment of the effectiveness of internal control over financial reporting, included in the accompanying Managements Report on Internal Control Over Financial Reporting (page II-9). Our responsibility is to express an opinion on these financial statements and the financial statement schedule and an opinion on the Companys internal control over financial reporting based on our audits.
We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement and whether effective internal control over financial reporting was maintained in all material respects. Our audits of the financial statements included examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, and evaluating the overall financial statement presentation. Our audit of internal control over financial reporting included obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, and testing and evaluating the design and operating effectiveness of internal control based on the assessed risk. Our audits also included performing such other procedures as we considered necessary in the circumstances. We believe that our audits provide a reasonable basis for our opinions.
A companys internal control over financial reporting is a process designed by, or under the supervision of, the companys principal executive and principal financial officers, or persons performing similar functions, and effected by the companys board of directors, management, and other personnel to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A companys internal control over financial reporting includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the companys assets that could have a material effect on the financial statements.
Because of the inherent limitations of internal control over financial reporting, including the possibility of collusion or improper management override of controls, material misstatements due to error or fraud may not be prevented or detected on a timely basis. Also, projections of any evaluation of the effectiveness of the internal control over financial reporting to future periods are subject to the risk that the controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.
In our opinion, the consolidated financial statements (pages II-46 to II-108) referred to above present fairly, in all material respects, the financial position of Southern Company and Subsidiary Companies as of December 31, 2011 and 2010, and the results of their operations and their cash flows for each of the three years in the period ended December 31, 2011, in conformity with accounting principles generally accepted in the United States of America. Also, in our opinion, the financial statement schedule, when considered in relation to the basic consolidated financial statements taken as a whole, presents fairly, in all material respects, the information set forth therein. Also, in our opinion, the Company maintained, in all material respects, effective internal control over financial reporting as of December 31, 2011, based on the criteria established in Internal Control Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission.
/s/ Deloitte & Touche LLP
Atlanta, Georgia
February 24, 2012
II-10
MANAGEMENTS DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
Southern Company and Subsidiary Companies 2011 Annual Report
OVERVIEW
Business Activities
The Southern Company (Southern Company or the Company) is a holding company that owns all of the common stock of the traditional operating companies Alabama Power Company (Alabama Power), Georgia Power Company (Georgia Power), Gulf Power Company (Gulf Power), and Mississippi Power Company (Mississippi Power) and Southern Power Company (Southern Power), and other direct and indirect subsidiaries (together, the Southern Company system). The primary business of the Southern Company system is electricity sales by the traditional operating companies and Southern Power. The four traditional operating companies are vertically integrated utilities providing electric service in four Southeastern states. Southern Power constructs, acquires, owns, and manages generation assets, including renewable energy projects, and sells electricity at market-based rates in the wholesale market.
Many factors affect the opportunities, challenges, and risks of the Southern Company systems electricity business. These factors include the traditional operating companies ability to maintain a constructive regulatory environment, to maintain and grow energy sales given economic conditions, and to effectively manage and secure timely recovery of costs. These costs include those related to projected long-term demand growth, increasingly stringent environmental standards, fuel, capital expenditures, and restoration following major storms. Each of the traditional operating companies has various regulatory mechanisms that operate to address cost recovery. Appropriately balancing required costs and capital expenditures with customer prices will continue to challenge the Company for the foreseeable future.
Another major factor is the profitability of the competitive market-based wholesale generating business. Southern Power continues to execute its strategy through a combination of acquiring and constructing new power plants, including renewable energy projects, and by entering into power purchase agreements (PPAs) with investor-owned utilities, independent power producers, municipalities, and electric cooperatives.
Southern Companys other business activities include investments in leveraged lease projects and telecommunications. Management continues to evaluate the contribution of each of these activities to total shareholder return and may pursue acquisitions and dispositions accordingly.
Key Performance Indicators
In striving to maximize shareholder value while providing cost-effective energy to more than four million customers, Southern Company continues to focus on several key performance indicators. These indicators include customer satisfaction, plant availability, system reliability, and earnings per share (EPS). Southern Companys financial success is directly tied to the satisfaction of its customers. Key elements of ensuring customer satisfaction include outstanding service, high reliability, and competitive prices. Management uses customer satisfaction surveys and reliability indicators to evaluate the results of the Southern Company system.
Peak season equivalent forced outage rate (Peak Season EFOR) is an indicator of fossil/hydro plant availability and efficient generation fleet operations during the months when generation needs are greatest. The rate is calculated by dividing the number of hours of forced outages by total generation hours. The fossil/hydro 2011 Peak Season EFOR of 1.28%, excluding the impact of tornadoes in April 2011, was better than the target. Transmission and distribution system reliability performance is measured by the frequency and duration of outages. Performance targets for reliability are set internally based on historical performance, expected weather conditions, and expected capital expenditures. The performance for 2011 was better than the target for these reliability measures.
II-11
MANAGEMENTS DISCUSSION AND ANALYSIS (continued)
Southern Company and Subsidiary Companies 2011 Annual Report
Southern Companys 2011 results compared with its targets for some of these key indicators are reflected in the following chart:
Key Performance Indicator | 2011 Target Performance |
2011 Actual Performance |
||||
|
|
|
|
|||
System Customer Satisfaction |
Top quartile in customer surveys |
Top quartile | ||||
Peak Season System EFOR fossil/hydro |
4.80% or less | 1.28% | ||||
Basic EPS |
$2.48 $2.56 | $2.57 |
See RESULTS OF OPERATIONS herein for additional information on the Companys financial performance. The performance achieved in 2011 reflects the continued emphasis that management places on these indicators as well as the commitment shown by employees in achieving or exceeding managements expectations.
Earnings
Southern Companys net income after dividends on preferred and preference stock of subsidiaries was $2.20 billion in 2011, an increase of $228 million from the prior year. The increase was primarily the result of increases in Georgia Powers retail base revenues as authorized under the 2010 Alternative Rate Plan for the years 2011 through 2013 (2010 ARP) and the recovery of financing costs through the Nuclear Construction Cost Recovery (NCCR) tariff. Also contributing to the increase were increases in energy and capacity revenues at Southern Power and a reduction in operations and maintenance expenses primarily at Alabama Power. The 2011 increase was partially offset by decreases in weather-related revenues due to closer to normal weather in 2011 compared to 2010, a decrease in the amortization of the regulatory liability related to other cost of removal obligations at Georgia Power, a decrease in wholesale revenues primarily at Alabama Power, and a reduction in allowance for funds used during construction (AFUDC) equity. Net income after dividends on preferred and preference stock of subsidiaries was $1.98 billion in 2010 and $1.64 billion in 2009.
Basic EPS was $2.57 in 2011, $2.37 in 2010, and $2.07 in 2009. Diluted EPS, which factors in additional shares related to stock-based compensation, was $2.55 in 2011, $2.36 in 2010, and $2.06 in 2009. EPS for 2011 was negatively impacted by $0.08 per share as a result of an increase in the average shares outstanding.
Dividends
Southern Company has paid dividends on its common stock since 1948. Dividends paid per share of common stock were $1.8725 in 2011, $1.8025 in 2010, and $1.7325 in 2009. In January 2012, Southern Company declared a quarterly dividend of 47.25 cents per share. This is the 257th consecutive quarter that Southern Company has paid a dividend equal to or higher than the previous quarter. The Company targets a dividend payout ratio of approximately 70% of net income. For 2011, the actual payout ratio was 73%.
II-12
MANAGEMENTS DISCUSSION AND ANALYSIS (continued)
Southern Company and Subsidiary Companies 2011 Annual Report
RESULTS OF OPERATIONS
Electricity Business
Southern Companys electric utilities generate and sell electricity to retail and wholesale customers in the Southeast.
A condensed statement of income for the electricity business follows:
Amount | Increase (Decrease) from Prior Year |
|||||||||||
|
||||||||||||
2011 | 2011 | 2010 | ||||||||||
|
||||||||||||
(in millions) | ||||||||||||
Electric operating revenues |
$ | 17,587 | $ | 213 | $ | 1,732 | ||||||
|
||||||||||||
Fuel |
6,262 | (437 | ) | 747 | ||||||||
Purchased power |
608 | 45 | 89 | |||||||||
Other operations and maintenance |
3,842 | (63 | ) | 505 | ||||||||
Depreciation and amortization |
1,700 | 205 | 19 | |||||||||
Taxes other than income taxes |
899 | 32 | 51 | |||||||||
|
||||||||||||
Total electric operating expenses |
13,311 | (218 | ) | 1,411 | ||||||||
|
||||||||||||
Operating income |
4,276 | 431 | 321 | |||||||||
Other income (expense), net |
99 | (59 | ) | (40) | ||||||||
Interest expense, net of amounts capitalized |
803 | (30 | ) | (1) | ||||||||
Income taxes |
1,293 | 179 | 126 | |||||||||
|
||||||||||||
Net income |
2,279 | 223 | 156 | |||||||||
Dividends on preferred and preference stock of subsidiaries |
65 | | | |||||||||
|
||||||||||||
Net income after dividends on preferred and preference stock of subsidiaries |
$ | 2,214 | $ | 223 | $ | 156 | ||||||
|
Electric Operating Revenues
Details of electric operating revenues were as follows:
Amount | ||||||||
|
||||||||
2011 | 2010 | |||||||
|
||||||||
(in millions) | ||||||||
Retail prior year |
$14,791 | $13,307 | ||||||
Estimated change in |
||||||||
Rates and pricing |
793 | 384 | ||||||
Sales growth (decline) |
38 | 32 | ||||||
Weather |
(279 | ) | 439 | |||||
Fuel and other cost recovery |
(272 | ) | 629 | |||||
|
||||||||
Retail current year |
15,071 | 14,791 | ||||||
Wholesale revenues |
1,905 | 1,994 | ||||||
Other electric operating revenues |
611 | 589 | ||||||
|
||||||||
Electric operating revenues |
$17,587 | $17,374 | ||||||
|
||||||||
Percent change |
1.2 | % | 11.1% | |||||
|
Retail revenues increased $280 million and $1.5 billion in 2011 and 2010, respectively. The significant factors driving these changes are shown in the preceding table. The increase in rates and pricing in 2011 was primarily due to increases in Georgia Powers retail base revenues as authorized under the 2010 ARP, which became effective January 1, 2011. The increase in base revenues at Georgia Power also includes the collection of financing costs associated with the construction of two new nuclear generating units at Plant Vogtle (Plant Vogtle Units 3 and 4) through the NCCR tariff effective January 1, 2011. See Other Income (Expense), Net and Interest Expense, Net of Amounts Capitalized herein for additional information. Also contributing to the increase in rates and pricing in 2011 were revenues associated with Alabama Powers rate certificated new plant environmental (Rate CNP Environmental) due to the completion of construction projects related to environmental mandates and the elimination of a tax-related adjustment under Alabama Powers rate structure. See FUTURE EARNINGS POTENTIAL PSC Matters Alabama Power Retail Rate Adjustments and PSC Matters Georgia Power Rate Plans herein for additional information. The 2010 increase in rates and
II-13
MANAGEMENTS DISCUSSION AND ANALYSIS (continued)
Southern Company and Subsidiary Companies 2011 Annual Report
pricing was primarily due to revenues associated with increases in rates under Alabama Powers stabilization and equalization plan (Rate RSE) and Rate CNP Environmental and the recovery of environmental costs at Gulf Power. See Energy Sales below for a discussion of changes in the volume of energy sold, including changes related to sales growth (decline) and weather.
Electric rates for the traditional operating companies include provisions to adjust billings for fluctuations in fuel costs, including the energy component of purchased power costs. Under these fuel cost recovery provisions, fuel revenues generally equal fuel expenses, including the fuel component of purchased power, and do not affect net income. The traditional operating companies may also have one or more regulatory mechanisms to recover other costs such as environmental, storm damage, new plants, and PPAs.
Wholesale revenues consist of PPAs with investor-owned utilities and electric cooperatives, unit power sales contracts, and short-term opportunity sales. Wholesale revenues from PPAs and unit power sales contracts have both capacity and energy components. Capacity revenues reflect the recovery of fixed costs and a return on investment. Energy revenues will vary depending on fuel prices, the market prices of wholesale energy compared to the Southern Company systems generation, demand for energy within the Southern Company systems service territory, and the availability of the Southern Company systems generation. Increases and decreases in energy revenues that are driven by fuel prices are accompanied by an increase or decrease in fuel costs and do not have a significant impact on net income. Short-term opportunity sales are made at market-based rates that generally provide a margin above the Southern Company systems variable cost to produce the energy.
In 2011, wholesale revenues decreased $89 million due to decreased energy revenues. This decrease was primarily due to a decrease in wholesale revenues at Alabama Power due to the expiration of long-term unit power sales contracts in May 2010 and the capacity subject to those contracts being made available for retail service starting in June 2010, as well as lower energy and capacity revenues associated with the expiration of PPAs at Southern Power. The decrease was partially offset by higher energy and capacity revenues under new PPAs at Southern Power. See FUTURE EARNINGS POTENTIAL PSC Matters Alabama Power Rate CNP herein for additional information regarding the termination of certain unit power sales contracts in 2010.
In 2010, wholesale revenues increased $192 million primarily due to higher capacity and energy revenues under existing PPAs and new PPAs at Southern Power, as well as increased energy sales that were not covered by PPAs at Southern Power due to more favorable weather. This increase was partially offset by the expiration of long-term unit power sales contracts in May 2010 at Alabama Power and the capacity subject to those contracts being made available for retail service starting in June 2010.
Revenues associated with PPAs and opportunity sales were as follows:
2011 | 2010 | 2009 | ||||||||||
|
||||||||||||
(in millions) | ||||||||||||
Other power sales |
||||||||||||
Capacity and other |
$ | 767 | $ | 684 | $ | 575 | ||||||
Energy |
1,035 | 1,034 | 735 | |||||||||
|
||||||||||||
Total |
$ | 1,802 | $ | 1,718 | $ | 1,310 | ||||||
|
Kilowatt-hour (KWH) sales under unit power sales contracts decreased 69.6% and 55.0% in 2011 and 2010, respectively. See FUTURE EARNINGS POTENTIAL PSC Matters Alabama Power Rate CNP herein for additional information regarding the termination of certain unit power sales contracts in 2010, which resulted in a decrease in capacity and energy revenues. In addition, fluctuations in oil and natural gas prices, which are the primary fuel sources for unit power sales contracts, influence changes in energy sales. However, because the energy is generally sold at variable cost, fluctuations in energy sales have a minimal effect on earnings. The capacity and energy components of the unit power sales contracts were as follows:
2011 | 2010 | 2009 | ||||||||||
|
||||||||||||
(in millions) | ||||||||||||
Unit power sales |
||||||||||||
Capacity |
$ 53 | $136 | $225 | |||||||||
Energy |
50 | 140 | 267 | |||||||||
|
||||||||||||
Total |
$103 | $276 | $492 | |||||||||
|
Other Electric Revenues
Other electric revenues increased $22 million and $56 million in 2011 and 2010, respectively. Other electric revenues increased in 2011 primarily as a result of an increase in transmission revenues at Georgia Power. The 2010 increase in other electric revenues was primarily the result of a $38 million increase in transmission revenues, a $4 million increase in rents from electric property, a $4 million increase in outdoor lighting revenues, and a $4 million increase in late fees.
II-14
MANAGEMENTS DISCUSSION AND ANALYSIS (continued)
Southern Company and Subsidiary Companies 2011 Annual Report
Energy Sales
Changes in revenues are influenced heavily by the change in the volume of energy sold from year to year. KWH sales for 2011 and the percent change by year were as follows:
Total KWHs |
Total KWH Percent Change |
Weather-Adjusted Percent Change |
||||||||||||||||||||
|
|
|
||||||||||||||||||||
2011 | 2011 | 2010 | 2011 | 2010 | ||||||||||||||||||
|
|
|
||||||||||||||||||||
(in billions) | ||||||||||||||||||||||
Residential |
53.3 | (7.7 | )% | 11.8% | 0.0 | % | 0.2% | |||||||||||||||
Commercial |
53.9 | (2.9 | ) | 3.7 | (0.3 | ) | (0.6) | |||||||||||||||
Industrial |
51.6 | 3.2 | 7.7 | 3.3 | 7.1 | |||||||||||||||||
Other |
0.9 | (0.8 | ) | (1.0) | (0.7 | ) | (1.5) | |||||||||||||||
|
|
|
||||||||||||||||||||
Total retail |
159.7 | (2.7 | ) | 7.6 | 1.0 | % | 2.0% | |||||||||||||||
|
|
|||||||||||||||||||||
Wholesale |
30.3 | (6.8 | ) | (2.8) | ||||||||||||||||||
|
||||||||||||||||||||||
Total energy sales |
190.0 | (3.4 | )% | 5.7% | ||||||||||||||||||
|
Changes in retail energy sales are comprised of changes in electricity usage by customers, changes in weather, and changes in the number of customers. Retail energy sales decreased 4.5 billion KWHs in 2011. This decrease was primarily the result of closer to normal weather in 2011 compared to 2010, partially offset by an increase in industrial KWH sales. Increased demand in the primary metals and fabricated metals sectors was the main contributor to the increase in industrial KWH sales. The number of customers in 2011 was flat when compared to 2010. Retail energy sales increased 11.6 billion KWHs in 2010 primarily as a result of colder weather in the first and fourth quarters 2010 and warmer weather in the second and third quarters 2010 when compared to the corresponding periods in 2009, increased industrial KWH sales, and customer growth of 0.3%. Increased demand in the primary metals, chemicals, and transportations sectors was the main contributor to the increase in industrial KWH sales.
Wholesale energy sales decreased 2.2 billion KWHs in 2011 and 0.9 billion KWHs in 2010. The decrease in wholesale energy sales in 2011 was primarily related to the expiration of long-term unit power sales contracts in May 2010 at Alabama Power and the capacity subject to those contracts being made available for retail service starting in June 2010. This decrease was partially offset by increased energy sales under new PPAs at Southern Power. The decrease in wholesale energy sales in 2010 was primarily related to the expiration of long-term unit power sales contracts in May 2010 at Alabama Power and the capacity subject to those contracts being made available for retail service starting in June 2010. This decrease was partially offset by increased energy sales under existing PPAs and new PPAs at Southern Power, as well as sales that were not covered by PPAs at Southern Power primarily due to more favorable weather in 2010 compared to 2009. See FUTURE EARNINGS POTENTIAL PSC Matters Alabama Power Rate CNP herein for additional information regarding the termination of certain unit power sales contracts in 2010.
Fuel and Purchased Power Expenses
Fuel costs constitute the single largest expense for the electric utilities. The mix of fuel sources for generation of electricity is determined primarily by demand, the unit cost of fuel consumed, and the availability of generating units. Additionally, the electric utilities purchase a portion of their electricity needs from the wholesale market. Details of electricity generated and purchased by the electric utilities were as follows:
2011 | 2010 | 2009 | ||||||||||
|
||||||||||||
Total generation (billions of KWHs) |
186 | 196 | 187 | |||||||||
Total purchased power (billions of KWHs) |
12 | 10 | 8 | |||||||||
|
||||||||||||
Sources of generation (percent) |
||||||||||||
Coal |
52 | 58 | 57 | |||||||||
Nuclear |
16 | 15 | 16 | |||||||||
Gas |
30 | 25 | 23 | |||||||||
Hydro |
2 | 2 | 4 | |||||||||
|
||||||||||||
Cost of fuel, generated (cents per net KWH) |
||||||||||||
Coal |
4.02 | 3.93 | 3.70 | |||||||||
Nuclear |
0.72 | 0.63 | 0.55 | |||||||||
Gas |
3.89 | 4.27 | 4.58 | |||||||||
|
||||||||||||
Average cost of fuel, generated (cents per net KWH) |
3.43 | 3.50 | 3.38 | |||||||||
Average cost of purchased power (cents per net KWH) * |
6.32 | 6.98 | 6.37 | |||||||||
|
* | Average cost of purchased power includes fuel purchased by the electric utilities for tolling agreements where power is generated by the provider. |
II-15
MANAGEMENTS DISCUSSION AND ANALYSIS (continued)
Southern Company and Subsidiary Companies 2011 Annual Report
In 2011, fuel and purchased power expenses were $6.9 billion, a decrease of $392 million, or 5.4%, compared to 2010 costs. This decrease was primarily the result of a $186 million net decrease in the amount of total KWHs generated and purchased and a $206 million decrease in the average cost per KWH generated and purchased. The net decrease in total amount of KWHs generated and purchased was mainly the result of lower demand primarily due to closer to normal weather in 2011 compared to 2010. The decrease in the average cost per KWH generated and purchased was primarily the result of an 8.9% decrease in the average cost per gas KWH generated and a 9.5% decrease in the average cost per KWH purchased.
In 2010, fuel and purchased power expenses were $7.3 billion, an increase of $836 million, or 13.0%, compared to 2009 costs. This increase was primarily the result of a $538 million increase in the amount of total KWHs generated and purchased due primarily to increased customer demand. Also contributing to this increase was a $298 million increase in the average cost per KWH generated and purchased due primarily to a 3.6% increase in the cost per KWH generated and a 9.6% increase in the cost per KWH purchased.
From an overall global market perspective, coal prices continued to increase in 2011 from the levels experienced in 2010, but remained lower than the unprecedented high levels of 2008. The slowly recovering U.S. economy and global demand from coal importing countries drove the higher prices in 2011, with concerns over regulatory actions, such as permitting issues, and their negative impact on production also contributing upward pressure. Domestic natural gas prices continued to be depressed by robust supplies, including production from shale gas, as well as lower demand. The combination of higher coal prices and lower natural gas prices contributed to increased use of natural gas-fueled generating units in 2011. In early 2011, uranium prices continued the steady increase started during the second half of 2010. In March 2011, uranium prices fell sharply from the highs earlier in the year. After some price volatility in the second quarter 2011, the price leveled and remained relatively constant for the remainder of 2011. At year end, uranium prices remained well below the highs set during 2007. Worldwide uranium production levels increased in 2011; however, secondary supplies and inventories were still required to meet worldwide reactor demand.
Fuel expenses generally do not affect net income, since they are offset by fuel revenues under the traditional operating companies fuel cost recovery provisions. See FUTURE EARNINGS POTENTIAL PSC Matters Fuel Cost Recovery herein for additional information. Likewise, Southern Powers PPAs generally provide that the purchasers are responsible for substantially all of the cost of fuel.
Other Operations and Maintenance Expenses
Other operations and maintenance expenses were $3.8 billion and $3.9 billion, decreasing $63 million and increasing $505 million in 2011 and 2010, respectively. Discussion of significant variances for components of other operations and maintenance expenses follows.
Other production expenses at fossil, hydro, and nuclear plants increased $2 million and $277 million in 2011 and 2010, respectively. Production expenses fluctuate from year to year due to variations in outage schedules and changes in the cost of labor and materials. Other production expenses increased in 2011 mainly due to a $29 million increase in commodity and labor costs and a $26 million increase in outage and maintenance costs. This increase was largely offset by a decrease in nuclear outage expense at Alabama Power, primarily related to a change to the nuclear maintenance outage accounting process associated with the routine refueling activities, as approved by the Alabama Public Service Commission (PSC) in August 2010. As a result, Alabama Power did not recognize any nuclear maintenance outage expenses in 2011, reducing nuclear production expense by approximately $50 million as compared to 2010. See FUTURE EARNINGS POTENTIAL PSC Matters Alabama Power Nuclear Outage Accounting Order herein for additional information. Other production expenses increased in 2010 mainly due to a $178 million increase in outage and maintenance costs and an $86 million increase in commodity and labor costs, reflecting a return to more normal spending levels when compared to 2009. Also contributing to this increase was an $18 million increase in maintenance costs related to additional equipment placed in service. Partially offsetting the 2010 increase was a $5 million loss recognized in 2009 on the transfer of Southern Powers Plant Desoto.
Transmission and distribution expenses decreased $80 million in 2011 and increased $143 million in 2010. Transmission and distribution expenses fluctuate from year to year due to variations in maintenance schedules and normal changes in the cost of labor and materials. Transmission and distribution expenses decreased in 2011 primarily due to reductions in spending related to vegetation management and a reduction in accruals to the natural disaster reserve (NDR) at Alabama Power. Transmission and distribution expenses increased in 2010 primarily due to increased spending related to vegetation management and other maintenance costs, reflecting a return to more normal spending levels, as well as an additional accrual to Alabama Powers NDR. See FUTURE EARNINGS POTENTIAL PSC Matters Alabama Power Natural Disaster Reserve herein for additional information.
II-16
MANAGEMENTS DISCUSSION AND ANALYSIS (continued)
Southern Company and Subsidiary Companies 2011 Annual Report
Customer sales and service expenses increased $33 million and $18 million in 2011 and 2010, respectively. Customer sales and service expenses increased in 2011 primarily due to a $24 million increase in customer service expense primarily related to new demand side management programs at Georgia Power and a $9 million increase in records and collection expense. Customer sales and service expenses increased in 2010 primarily as a result of an $8 million increase in sales expenses, a $13 million increase in customer service expense, a $10 million increase in records and collection expense, and a $3 million increase in uncollectible accounts expense. Partially offsetting this increase was a $7 million decrease in meter reading expenses and a $9 million decrease in other energy services.
Administrative and general expenses decreased $18 million in 2011 and increased $67 million in 2010. Administrative and general expenses decreased in 2011 primarily as a result of a $10 million decrease in property insurance cost and a $7 million decrease in injuries and damages reserve costs. Administrative and general expenses increased in 2010 primarily as a result of cost containment activities in 2009 which were taken to offset the effects of the recessionary economy.
Depreciation and Amortization
Depreciation and amortization increased $205 million in 2011 primarily as a result of a $142 million decrease in the amortization of the regulatory liability related to other cost of removal obligations at Georgia Power as authorized by the Georgia PSC and additional depreciation on plant in service related to environmental, transmission, and distribution projects. See Note 1 to the financial statements under Depreciation and Amortization and Note 3 to the financial statements under Retail Regulatory Matters Georgia Power Rate Plans for additional information regarding Georgia Powers cost of removal amortization.
Depreciation and amortization increased $19 million in 2010 primarily as the result of additional depreciation on plant in service related to environmental, transmission, and distribution projects, as well as additional depreciation at Southern Power. This increase was largely offset by a $133 million increase in the amortization of the regulatory liability related to other cost of removal obligations at Georgia Power as authorized by the Georgia PSC.
Taxes Other Than Income Taxes
Taxes other than income taxes increased $32 million in 2011 primarily due to increases in property taxes and municipal franchise fees at Georgia Power and increases in state and municipal public utility license tax bases at Alabama Power. Taxes other than income taxes increased $51 million in 2010 primarily due to increases in municipal franchise fees at Georgia Power, increases in state and municipal public utility license tax bases at Alabama Power, increases in gross receipts and franchise fees at Gulf Power, increases in ad valorem taxes, and increases in payroll taxes. Increases in franchise fees are associated with increases in revenues from energy sales.
Other Income (Expense), Net
Other income (expense), net decreased $59 million in 2011 primarily due to the inclusion of Georgia Powers construction costs for Plant Vogtle Units 3 and 4 in rate base effective January 1, 2011 in accordance with the Georgia Nuclear Energy Financing Act and a Georgia PSC order. This action reduced the amount of AFUDC capitalized, with an offsetting increase in operating revenues through the NCCR tariff. Also contributing to the decrease was reduced AFUDC equity at Alabama Power due to the completion of construction projects related to environmental mandates and a $20 million loss at Southern Power related to a make-whole premium in connection with the early redemption of senior notes. The 2011 decrease was partially offset by construction work in progress related to Mississippi Powers Kemper County integrated coal gasification combined cycle (Kemper IGCC) which began construction in June 2010. Other income (expense), net decreased $40 million in 2010 primarily due to a decrease in AFUDC equity, mainly due to the completion of environmental projects at Alabama Power and Gulf Power, and a $13 million profit recognized in 2009 at Southern Power related to a construction contract with the Orlando Utilities Commission. The 2010 decrease was partially offset by increases in AFUDC equity related to the increase in construction of three new combined cycle units and Plant Vogtle Units 3 and 4 at Georgia Power. See Note 3 to the financial statements under Retail Regulatory Matters Georgia Power Nuclear Construction for additional information.
II-17
MANAGEMENTS DISCUSSION AND ANALYSIS (continued)
Southern Company and Subsidiary Companies 2011 Annual Report
Interest Expense, Net of Amounts Capitalized
Total interest charges and other financing costs decreased $30 million in 2011 primarily due to a reduction of $23 million in interest expense at Georgia Power related to the settlement of litigation with the Georgia Department of Revenue (DOR) and lower interest expense on existing variable rate pollution control revenue bonds at Georgia Power. The decrease was partially offset by a reduction in AFUDC debt at Georgia Power due to the inclusion of construction costs for Plant Vogtle Units 3 and 4 in rate base.
Total interest charges and other financing costs decreased $1 million in 2010 primarily due to an $18 million decrease related to lower average interest rates on existing variable rate debt, an $11 million decrease in other interest costs, and a $2 million increase in capitalized interest as compared to 2009. The 2010 decrease was largely offset by a $29 million increase associated with $1.0 billion in additional debt outstanding at December 31, 2010 compared to December 31, 2009.
Income Taxes
Income taxes increased $179 million in 2011 primarily due to higher pre-tax earnings as compared to 2010, a decrease in 2010 in uncertain tax positions at Georgia Power related to state income tax credits, and a reduction in AFUDC equity, which is non-taxable.
Income taxes increased $126 million in 2010 primarily due to higher pre-tax earnings as compared to 2009, a decrease in the Internal Revenue Code of 1986, as amended, Section 199 production activities deduction, and an increase in Alabama state taxes due to a decrease in the state deduction for federal income taxes paid. Partially offsetting this increase were state tax credits at Georgia Power and tax benefits associated with the construction of a biomass facility at Southern Power. See Note 5 to the financial statements under Effective Tax Rate for additional information.
Other Business Activities
Southern Companys other business activities include the parent company (which does not allocate operating expenses to business units), investments in leveraged lease projects, and telecommunications. These businesses are classified in general categories and may comprise one or both of the following subsidiaries: Southern Company Holdings, Inc. invests in various projects, including leveraged lease projects, and SouthernLINC Wireless provides digital wireless communications for use by Southern Company and its subsidiary companies and also markets these services to the public and provides fiber cable services within the Southeast.
A condensed statement of income for Southern Companys other business activities follows:
Amount | Increase (Decrease) from Prior Year |
|||||||||||
|
||||||||||||
2011 | 2011 | 2010 | ||||||||||
|
||||||||||||
(in millions) | ||||||||||||
Operating revenues |
$ 70 | $ (12) | $ (19) | |||||||||
|
||||||||||||
Other operations and maintenance |
96 | (9) | (21) | |||||||||
MC Asset Recovery litigation settlement |
| | (202) | |||||||||
Depreciation and amortization |
17 | (1) | (9) | |||||||||
Taxes other than income taxes |
2 | | | |||||||||
|
||||||||||||
Total operating expenses |
115 | (10) | (232) | |||||||||
|
||||||||||||
Operating income (loss) |
(45) | (2) | 213 | |||||||||
Equity in income (losses) of unconsolidated subsidiaries |
(2) | | (1) | |||||||||
Leveraged lease income (losses) |
25 | 7 | (22) | |||||||||
Other income (expense), net |
(9) | 6 | (19) | |||||||||
Interest expense |
54 | (8) | (9) | |||||||||
Income taxes |
(74) | 14 | 4 | |||||||||
|
||||||||||||
Net income (loss) |
$ (11) | $ 5 | $176 | |||||||||
|
II-18
MANAGEMENTS DISCUSSION AND ANALYSIS (continued)
Southern Company and Subsidiary Companies 2011 Annual Report
Operating Revenues
Southern Companys non-electric operating revenues from these other business activities decreased $12 million in 2011 primarily as a result of a decrease in revenues at SouthernLINC Wireless related to lower average per subscriber revenue and fewer subscribers due to continued competition in the industry. The $19 million decrease in 2010 primarily resulted from a decrease in revenues at SouthernLINC Wireless related to lower average revenue per subscriber and fewer subscribers due to continued competition in the industry.
Other Operations and Maintenance Expenses
Other operations and maintenance expenses for these other businesses decreased $9 million in 2011 and $21 million in 2010. These decreases were primarily the result of lower administrative and general expenses for these other businesses.
MC Asset Recovery Litigation Settlement
In March 2009, Southern Company entered into a litigation settlement agreement with MC Asset Recovery, LLC (MC Asset Recovery) which resulted in a charge of $202 million and required MC Asset Recovery to release Southern Company and certain other designated avoidance actions assigned to MC Asset Recovery in connection with Mirant Corporations plan of reorganization, as well as to release all actions against current or former officers and directors of Mirant Corporation and Southern Company that had or could have been filed. Pursuant to the settlement, Southern Company recorded a charge in the first quarter 2009 of $202 million, which was paid in the second quarter 2009. The settlement has been completed and resolves all claims by MC Asset Recovery against Southern Company. In June 2009, the case was dismissed with prejudice.
Leveraged Lease Income (Losses)
Southern Company has several leveraged lease agreements which relate to international and domestic energy generation, distribution, and transportation assets. Southern Company receives federal income tax deductions for depreciation and amortization, as well as interest on long-term debt related to these investments. Leveraged lease income (losses) increased $7 million in 2011 primarily as a result of changes in the average leveraged lease investment balance. Leveraged lease income (losses) decreased $22 million in 2010 primarily as a result of a $26 million gain recorded in 2009 associated with the early termination of two international leveraged lease investments, the proceeds from which were required to extinguish all debt related to the leveraged lease investments, and a portion of which had make-whole redemption provisions. This resulted in a $17 million loss in 2009, partially offsetting the gain. In addition, leveraged lease income decreased $6 million in 2010 primarily due to lease income no longer being recognized on the terminated leveraged lease investments.
Other Income (Expense), Net
Other income (expense), net for these other businesses increased $6 million in 2011 and decreased $19 million in 2010 primarily as a result of changes in the amount of charitable contributions made by the parent company in 2011 and 2010.
Interest Expense
Total interest charges and other financing costs for these other businesses decreased $8 million in 2011 and $9 million in 2010 primarily due to lower average interest rates on existing variable rate debt in the applicable period.
Income Taxes
Income taxes for these other businesses increased $14 million in 2011 primarily as a result of lower pre-tax losses and a prior year state tax adjustment related to leveraged leases. The 2010 increase in income taxes was not material when compared to the prior year.
II-19
MANAGEMENTS DISCUSSION AND ANALYSIS (continued)
Southern Company and Subsidiary Companies 2011 Annual Report
Effects of Inflation
The traditional operating companies are subject to rate regulation that is generally based on the recovery of historical and projected costs. The effects of inflation can create an economic loss since the recovery of costs could be in dollars that have less purchasing power. Southern Power is party to long-term contracts reflecting market-based rates, including inflation expectations. Any adverse effect of inflation on Southern Companys results of operations has not been substantial in recent years.
FUTURE EARNINGS POTENTIAL
General
The four traditional operating companies operate as vertically integrated utilities providing electricity to customers within their service areas in the Southeast. Prices for electricity provided to retail customers are set by state PSCs under cost-based regulatory principles. Prices for wholesale electricity sales, interconnecting transmission lines, and the exchange of electric power are regulated by the Federal Energy Regulatory Commission (FERC). Retail rates and earnings are reviewed and may be adjusted periodically within certain limitations. Southern Power continues to focus on long-term capacity contracts, optimized by limited energy trading activities. See ACCOUNTING POLICIES Application of Critical Accounting Policies and Estimates Electric Utility Regulation herein and Note 3 to the financial statements for additional information about regulatory matters.
The results of operations for the past three years are not necessarily indicative of future earnings potential. The level of Southern Companys future earnings depends on numerous factors that affect the opportunities, challenges, and risks of Southern Companys primary business of selling electricity. These factors include the traditional operating companies ability to maintain a constructive regulatory environment that continues to allow for the timely recovery of prudently incurred costs during a time of increasing costs. Another major factor is the profitability of the competitive wholesale supply business. Future earnings for the electricity business in the near term will depend, in part, upon maintaining energy sales which is subject to a number of factors. These factors include weather, competition, new energy contracts with neighboring utilities and other wholesale customers, energy conservation practiced by customers, the price of electricity, the price elasticity of demand, and the rate of economic growth or decline in the service area. In addition, the level of future earnings for the wholesale supply business also depends on numerous factors including creditworthiness of customers, total generating capacity available, cost, future acquisitions and construction of generating facilities, and the successful remarketing of capacity as current contracts expire. Changes in economic conditions impact sales for the traditional operating companies and Southern Power, and the pace of the economic recovery remains uncertain. The timing and extent of the economic recovery will impact growth and may impact future earnings.
In general, the Southern Company system has constructed or acquired new generating capacity only after entering into long-term capacity contracts for the new facilities or to meet requirements of the Southern Company systems regulated retail markets, both of which are optimized by limited energy trading activities. See Construction Program herein and Note 7 to the financial statements for additional information.
As part of its ongoing effort to adapt to changing market conditions, Southern Company continues to evaluate and consider a wide array of potential business strategies. These strategies may include business combinations, partnerships, acquisitions involving other utility or non-utility businesses or properties, disposition of certain assets, internal restructuring, or some combination thereof. Furthermore, Southern Company may engage in new business ventures that arise from competitive and regulatory changes in the utility industry. Pursuit of any of the above strategies, or any combination thereof, may significantly affect the business operations, risks, and financial condition of Southern Company.
Environmental Matters
Compliance costs related to federal and state environmental statutes and regulations could affect earnings if such costs cannot continue to be fully recovered in rates on a timely basis. Environmental compliance spending over the next several years may differ materially from the amounts estimated. The timing, specific requirements, and estimated costs could change as environmental statutes and regulations are adopted or modified. Further, higher costs that are recovered through regulated rates could contribute to reduced demand for electricity, which could negatively affect results of operations, cash flows, and financial condition. See Note 3 to the financial statements under Environmental Matters for additional information.
II-20
MANAGEMENTS DISCUSSION AND ANALYSIS (continued)
Southern Company and Subsidiary Companies 2011 Annual Report
New Source Review Actions
In 1999, the Environmental Protection Agency (EPA) brought a civil action in the U.S. District Court for the Northern District of Georgia against certain Southern Company subsidiaries, including Alabama Power and Georgia Power, alleging that these subsidiaries had violated the New Source Review (NSR) provisions of the Clean Air Act and related state laws at certain coal-fired generating facilities. The EPA alleged NSR violations at five coal-fired generating facilities operated by Alabama Power, including a unit co-owned by Mississippi Power, and three coal-fired generating facilities operated by Georgia Power, including a unit co-owned by Gulf Power. The civil action sought penalties and injunctive relief, including an order requiring installation of the best available control technology at the affected units. The case against Georgia Power (including claims related to the unit co-owned by Gulf Power) was administratively closed in 2001 and has not been reopened. After Alabama Power was dismissed from the original action, the EPA filed a separate action in 2001 against Alabama Power (including claims related to the unit co-owned by Mississippi Power) in the U.S. District Court for the Northern District of Alabama.
In 2006, the U.S. District Court for the Northern District of Alabama entered a consent decree, resolving claims relating to the alleged NSR violations at Plant Miller. In September 2010, the EPA dismissed five of its eight remaining claims against Alabama Power, leaving only three claims, including one relating to the unit co-owned by Mississippi Power. On March 14, 2011, the U.S. District Court for the Northern District of Alabama granted Alabama Power summary judgment on all remaining claims and dismissed the case with prejudice. That judgment is on appeal to the U.S. Court of Appeals for the Eleventh Circuit.
Southern Company believes the traditional operating companies complied with applicable laws and regulations in effect at the time the work in question took place. The Clean Air Act authorizes maximum civil penalties of $25,000 to $37,500 per day, per violation, depending on the date of the alleged violation. An adverse outcome could require substantial capital expenditures that cannot be determined at this time and could possibly require payment of substantial penalties. Such expenditures could affect future results of operations, cash flows, and financial condition if such costs are not recovered through regulated rates. The ultimate outcome of these matters cannot be determined at this time.
Climate Change Litigation
Kivalina Case
In 2008, the Native Village of Kivalina and the City of Kivalina filed a lawsuit in the U.S. District Court for the Northern District of California against several electric utilities (including Southern Company), several oil companies, and a coal company. The plaintiffs allege that the village is being destroyed by erosion allegedly caused by global warming that the plaintiffs attribute to emissions of greenhouse gases by the defendants. The plaintiffs assert claims for public and private nuisance and contend that some of the defendants (including Southern Company) acted in concert and are therefore jointly and severally liable for the plaintiffs damages. The suit seeks damages for lost property values and for the cost of relocating the village, which is alleged to be $95 million to $400 million. In 2009, the U.S. District Court for the Northern District of California granted the defendants motions to dismiss the case. The plaintiffs appealed the dismissal to the U.S. Court of Appeals for the Ninth Circuit. Southern Company believes that these claims are without merit. The ultimate outcome of this matter cannot be determined at this time.
Hurricane Katrina Case
In 2005, immediately following Hurricane Katrina, a lawsuit was filed in the U.S. District Court for the Southern District of Mississippi by Ned Comer on behalf of Mississippi residents seeking recovery for property damage and personal injuries caused by Hurricane Katrina. In 2006, the plaintiffs amended the complaint to include Southern Company and many other electric utilities, oil companies, chemical companies, and coal producers. The plaintiffs allege that the defendants contributed to climate change, which contributed to the intensity of Hurricane Katrina. In 2007, the U.S. District Court for the Southern District of Mississippi dismissed the case. On appeal to the U.S. Court of Appeals for the Fifth Circuit, a three-judge panel reversed the U.S. District Court for the Southern District of Mississippi, holding that the case could proceed, but, on rehearing, the full U.S. Court of Appeals for the Fifth Circuit dismissed the plaintiffs appeal, resulting in reinstatement of the decision of the U.S. District Court for the Southern District of Mississippi in favor of the defendants. On May 27, 2011, the plaintiffs filed an amended version of their class action complaint, arguing that the earlier dismissal was on procedural grounds and under Mississippi law the plaintiffs have a right to re-file. The amended complaint was also filed against numerous chemical, coal, oil, and utility companies, including Alabama Power, Georgia Power, Gulf Power, and Southern Power. Southern Company believes that these claims are without merit. The ultimate outcome of this matter cannot be determined at this time.
II-21
MANAGEMENTS DISCUSSION AND ANALYSIS (continued)
Southern Company and Subsidiary Companies 2011 Annual Report
Environmental Statutes and Regulations
General
The electric utilities operations are subject to extensive regulation by state and federal environmental agencies under a variety of statutes and regulations governing environmental media, including air, water, and land resources. Applicable statutes include the Clean Air Act; the Clean Water Act; the Comprehensive Environmental Response, Compensation, and Liability Act; the Resource Conservation and Recovery Act; the Toxic Substances Control Act; the Emergency Planning & Community Right-to-Know Act; the Endangered Species Act; and related federal and state regulations. Compliance with these environmental requirements involves significant capital and operating costs, a major portion of which is expected to be recovered through existing ratemaking provisions. Through 2011, the traditional operating companies had invested approximately $8.3 billion in environmental capital retrofit projects to comply with these requirements, with annual totals of $300 million, $500 million, and $1.3 billion for 2011, 2010, and 2009, respectively. The Southern Company system expects that base level capital expenditures to comply with existing statutes and regulations will be a total of approximately $1.5 billion from 2012 through 2014 as follows:
2012 | 2013 | 2014 | ||||
| ||||||
(in millions) | ||||||
Existing environmental statutes and regulations |
$ 425 | $ 405 | $ 621 | |||
|
The environmental costs that are known and estimable at this time are included under the heading Capital in the table under FINANCIAL CONDITION AND LIQUIDITY Capital Requirements and Contractual Obligations herein. These base environmental costs do not include potential incremental environmental compliance investments associated with complying with the EPAs final Mercury and Air Toxics Standards (MATS) rule (formerly referred to as the Utility Maximum Achievable Control Technology rule) or the EPAs proposed water and coal combustion byproducts rules, except with respect to $750 million as described below.
The Southern Company system is assessing the potential costs of complying with the MATS rule, as well as the EPAs proposed water and coal combustion byproducts rules. See Air Quality, Water Quality, and Coal Combustion Byproducts below for additional information regarding the MATS rule, the proposed water rules, and the proposed coal combustion byproducts rule. Although its analyses are preliminary, the Southern Company system estimates that the aggregate capital costs to the traditional operating companies for compliance with the MATS rule and the proposed water and coal combustion byproducts rules could range from $13 billion to $18 billion through 2021, based on the assumption that coal combustion byproducts will continue to be regulated as non-hazardous solid waste under the proposed rule. Included in this amount is $750 million that is also included in the 2012 through 2014 base level capital investment of the traditional operating companies described herein in anticipation of these rules.
With respect to the impact of the MATS rule on capital spending from 2012 through 2014, the Southern Company systems preliminary analysis anticipates that potential incremental environmental compliance capital expenditures to comply with the MATS rule are likely to be substantial and could be up to $2.7 billion from 2012 through 2014. Additionally, capital expenditures to comply with the proposed water and coal combustion byproducts rules could also be substantial and could be up to $1.5 billion over the same 2012 through 2014 three-year period, based on the assumption that coal combustion byproducts will continue to be regulated as non-hazardous solid waste under the proposed rule. The estimated costs are as follows:
2012 |
2013 | 2014 | ||||||||||
|
||||||||||||
(in millions) | ||||||||||||
MATS rule |
Up to $ 370 | Up to $770 | Up to $1,610 | |||||||||
Proposed water and coal combustion byproducts rules |
Up to $40 | Up to $365 | Up to $1,090 | |||||||||
|
||||||||||||
Total potential incremental environmental compliance investments |
Up to $410 | Up to $1,135 | Up to $ 2,700 | |||||||||
|
The Southern Company systems compliance strategy, including potential unit retirement and replacement decisions, and future environmental capital expenditures are dependent on a final assessment of the MATS rule and will be affected by the final requirements of new or revised environmental regulations that are promulgated, including the proposed environmental regulations described below; the outcome of any legal challenges to the environmental rules; the cost, availability, and existing inventory of emissions allowances; and the fuel mix of the electric utilities. These costs may arise from existing unit retirements, installation of additional environmental controls, upgrades to the transmission system, the addition of new generating resources, and changing fuel sources for certain existing units. The Southern Company systems preliminary analysis further indicates that the short timeframe for compliance with the MATS rule could significantly affect electric system reliability and cause an increase in costs of materials and services. The ultimate outcome of these matters cannot be determined at this time.
II-22
MANAGEMENTS DISCUSSION AND ANALYSIS (continued)
Southern Company and Subsidiary Companies 2011 Annual Report
As of December 31, 2011, the Southern Company system had total generating capacity of approximately 43,555 megawatts (MWs), of which 20,212 MWs are coal-fired. Over the past several years, the Southern Company system has installed various pollution control technologies on coal-fired units, including both selective catalytic reduction equipment and scrubbers on the 17 largest coal units making up 11,036 MWs of the Southern Company systems coal-fired generating capacity. As a result of the EPAs final and anticipated rules and regulations, the Southern Company system is evaluating its coal-fired generating capacity and is developing a compliance strategy which may include unit retirements, installation of additional environmental controls (including on the units with existing pollution control technologies), and changing fuel sources for certain units.
Southern Electric Generating Company (SEGCO), jointly owned by Alabama Power and Georgia Power, is also developing an environmental compliance strategy for its 1,000 MWs of coal-fired generating capacity, which may result in unit retirements, installation of controls, or changing fuel source. The capacity of SEGCOs units is sold to Alabama Power and Georgia Power through a PPA. The impact of SEGCOs compliance strategy on such PPA costs cannot be determined at this time; however, if such costs cannot continue to be recovered through retail rates, they could have a material financial impact on Southern Companys financial statements. See Note 4 to the financial statements for additional information.
Compliance with any new federal or state legislation or regulations relating to global climate change, air quality, coal combustion byproducts, water, or other environmental and health concerns could significantly affect the Company. Although new or revised environmental legislation or regulations could affect many areas of the electric utilities operations, the full impact of any such changes cannot be determined at this time. Additionally, many of the electric utilities commercial and industrial customers may also be affected by existing and future environmental requirements, which for some may have the potential to ultimately affect their demand for electricity.
Air Quality
Compliance with the Clean Air Act and resulting regulations has been and will continue to be a significant focus for the Southern Company system. Since 1990, the electric utilities spent approximately $7.4 billion in reducing sulfur dioxide (SO2) and nitrogen oxide (NOx) emissions and in monitoring emissions pursuant to the Clean Air Act. Additional controls are currently planned or under consideration to further reduce air emissions, maintain compliance with existing regulations, and meet new requirements.
The EPA regulates ground level ozone concentrations through implementation of an eight-hour ozone air quality standard. In 2008, the EPA adopted a more stringent eight-hour ozone air quality standard, which it began to implement in September 2011. The 2008 standard is expected to result in designation of new nonattainment areas within the Southern Company system service territory and could require additional reductions in NOx emissions.
The EPA also regulates fine particulate matter emissions on an annual and 24-hour average basis. Although all areas within the Southern Company systems service territory have air quality levels that attain the current standard, the EPA has announced its intention to propose new, more stringent annual and 24-hour fine particulate matter standards in mid-2012.
Final revisions to the National Ambient Air Quality Standard for SO2, including the establishment of a new one-hour standard, became effective in August 2010. Since the EPA intends to rely on computer modeling for implementation of the SO2 standard, the identification of potential nonattainment areas remains uncertain and could ultimately include areas within the Southern Company systems service territory. The EPA is expected to designate areas as attainment and nonattainment under the new standard in 2012. Implementation of the revised SO2 standard could require additional reductions in SO2 emissions and increased compliance and operation costs.
Revisions to the National Ambient Air Quality Standard for Nitrogen Dioxide (NO2), which established a new one-hour standard, became effective in April 2010. The EPA signed a final rule with area designations for the new NO2 standard on January 20, 2012; none of the areas within the Southern Company systems service territory were designated as nonattainment. The new NO2 standard could result in significant additional compliance and operational costs for units that require new source permitting.
II-23
MANAGEMENTS DISCUSSION AND ANALYSIS (continued)
Southern Company and Subsidiary Companies 2011 Annual Report
In 2008, the EPA approved a revision to Alabamas State Implementation Plan (SIP) requirements related to opacity, which granted some flexibility to affected sources while requiring compliance with Alabamas stringent opacity limits through use of continuous opacity monitoring system data. On April 6, 2011, the EPA attempted to rescind its previous approval of the Alabama SIP revision. This decision impacts facilities operated by Alabama Power, including units co-owned by Mississippi Power. Alabama Power filed an appeal of that decision with the U.S. Court of Appeals for the Eleventh Circuit. The EPAs rescission has affected unit availability and increased maintenance and compliance costs. Unless the court resolves Alabama Powers appeal in its favor, the EPAs rescission will continue to affect Alabama Powers operations.
Each of the states in which the Southern Company system has fossil generation is subject to the requirements of the Clean Air Interstate Rule (CAIR), which calls for phased reductions in SO2 and NOx emissions from power plants in 28 eastern states. In 2008, the U.S. Court of Appeals for the District of Columbia Circuit issued decisions invalidating CAIR, but left CAIR compliance requirements in place while the EPA developed a new rule. On August 8, 2011, the EPA adopted the Cross State Air Pollution Rule (CSAPR) to replace CAIR effective January 1, 2012. Like CAIR, the CSAPR was intended to address interstate emissions of SO2 and NOx that interfere with downwind states ability to meet or maintain national ambient air quality standards for ozone and/or particulate matter. Numerous parties (including the traditional operating companies and Southern Power) sought administrative reconsideration of the CSAPR and also filed appeals and requests to stay the rule pending judicial review with the U.S. Court of Appeals for the District of Columbia Circuit. On December 30, 2011, the U.S. Court of Appeals for the District of Columbia Circuit stayed the CSAPR in its entirety and ordered the EPA to continue administration of CAIR pending a final decision. Before the stay was granted, the EPA published proposed technical revisions to the CSAPR, including adjustments to certain state emissions budgets and a delay in implementation of the emissions trading limitations until January 2014. On February 7, 2012, the EPA released the final technical revisions to the CSAPR and at the same time issued a direct final rule which together provide increases to certain state emissions budgets, including the states of Florida, Georgia, and Mississippi.
The EPA finalized the Clean Air Visibility Rule (CAVR) in 2005, with a goal of restoring natural visibility conditions in certain areas (primarily national parks and wilderness areas) by 2064. The rule involves the application of best available retrofit technology (BART) to certain sources built between 1962 and 1977 and any additional emissions reductions necessary for each designated area to achieve reasonable progress toward the natural visibility conditions goal by 2018 and for each 10-year period thereafter. On December 30, 2011, the EPA issued a proposed rule providing that compliance with the CSAPR satisfies BART obligations under the CAVR. Given the pending legal challenge to the CSAPR, it remains uncertain whether additional controls may be required for CAVR and BART compliance.
On February 16, 2012, the EPA published the final MATS rule, which imposes stringent emissions limits for acid gases, mercury, and particulate matter on coal- and oil-fired electric utility steam generating units. Compliance for existing sources is required by April 16, 2015 three years after the effective date of the final rule. As described above, compliance with this rule is likely to require substantial capital expenditures and compliance costs at many of the facilities of Southern Companys subsidiaries which could affect unit retirement and replacement decisions. In addition, results of operations, cash flows, and financial condition could be affected if the costs are not recovered through regulated rates. Further, there is uncertainty regarding the ability of the electric utility industry to achieve compliance with the requirements of the rule within the compliance period, and the limited compliance period could negatively affect electric system reliability.
On March 21, 2011, the EPA published the final Industrial Boiler (IB) Maximum Achievable Control Technology (MACT) rule establishing emissions limits for various hazardous air pollutants emitted from industrial boilers, including biomass boilers and start-up boilers. At the same time, the EPA issued a notice of intent to reconsider the final rule and, on May 16, 2011, the EPA issued an administrative stay to prevent the rule from becoming effective. On December 2, 2011, the EPA proposed a reconsideration rule to change certain aspects of the final rule. On January 9, 2012, however, the U.S. District Court for the District of Columbia Circuit vacated the EPAs administrative stay. Although the U.S. District Court for the District of Columbia Circuits decision would allow the original IB MACT rule to become effective, the EPA has indicated that it will not implement the rule until the EPAs proposed revisions can be finalized. The effect of the regulatory proceedings will depend on the final form of the revised regulations and the outcome of any legal challenges and cannot be determined at this time. On October 18, 2011, the Georgia PSC approved Georgia Powers request to further delay the decision to convert Plant Mitchell Unit 3 from coal to biomass for two to four years, until there is greater clarity regarding the IB MACT rule and other proposed and recently adopted regulations.
II-24
MANAGEMENTS DISCUSSION AND ANALYSIS (continued)
Southern Company and Subsidiary Companies 2011 Annual Report
The Southern Company system has developed and continually updates a comprehensive environmental compliance strategy to assess compliance obligations associated with the existing and new environmental requirements discussed above. The impacts of the eight-hour ozone, fine particulate matter, SO2 and NO2 standards, the CSAPR, the CAIR, the CAVR, the MATS rule, and the IB MACT rule on the Southern Company system cannot be determined at this time and will depend on the specific provisions of the final rules, resolution of pending and future legal challenges, and the development and implementation of rules at the state level. However, these regulations could result in significant additional compliance costs that could affect future unit retirement and replacement decisions and results of operations, cash flows, and financial condition if such costs are not recovered through regulated rates. Further, higher costs that are recovered through regulated rates could contribute to reduced demand for electricity, which could negatively impact results of operations, cash flows, and financial condition.
In addition to the federal air quality laws described above, Georgia Power is also subject to the requirements of the 2007 State of Georgia Multi-Pollutant Rule. The Multi-Pollutant Rule is designed to reduce emissions of mercury, SO2, and NOx state-wide by requiring the installation of specified control technologies at certain coal-fired generating units by specific dates between December 31, 2008 and December 31, 2015. The State of Georgia also adopted a companion rule that requires a 95% reduction in SO2 emissions from the controlled units on the same or similar timetable. Through December 31, 2011, Georgia Power had installed the required controls on 11 of its largest coal-fired generating units and is in the process of installing the required controls on two additional units. As a result of uncertainties related to the potential federal air quality regulations described above, Georgia Power has suspended certain work related to the installation of emissions control equipment at Plant Branch Units 3 and 4 and Plant Yates Units 6 and 7. Georgia Power continues to analyze the potential costs and benefits of installing the required controls on its remaining coal-fired generating units in light of the potential federal regulations described above. Georgia Power may determine that retiring and replacing certain of these existing units with new generating resources or purchased power is more economically efficient than installing the required environmental controls. See PSC Matters Georgia Power 2011 Integrated Resource Plan Update for additional information. The ultimate outcome of these matters cannot be determined at this time.
Water Quality
On April 20, 2011, the EPA published a proposed rule that establishes standards for reducing effects on fish and other aquatic life caused by cooling water intake structures at existing power plants and manufacturing facilities. The rule also addresses cooling water intake structures for new units at existing facilities. Compliance with the proposed rule could require changes to existing cooling water intake structures at certain of the traditional operating companies generating facilities, and new generating units constructed at existing plants would be required to install closed cycle cooling towers. The EPA has agreed in a settlement agreement to issue a final rule by July 27, 2012. If finalized as proposed, some of the facilities of Southern Companys subsidiaries may be subject to significant additional capital expenditures and compliance costs that could affect future unit retirement and replacement decisions.
Also, results of operations, cash flows, and financial condition could be significantly impacted if such costs are not recovered through regulated rates or through PPAs. The ultimate outcome of this rulemaking will depend on the final rule and the outcome of any legal challenges and cannot be determined at this time.
The EPA has announced its determination that revision of the current effluent guidelines for steam electric power plants is warranted and has stated that it intends to adopt such revisions by January 2014. New wastewater treatment requirements are expected and may result in the installation of additional controls on certain of the Southern Company system facilities, which could result in significant additional capital expenditures and compliance costs, as described above, that could affect future unit retirement and replacement decisions. The impact of the revised guidelines will depend on the studies conducted in connection with the rulemaking, as well as the specific requirements of the final rule, and, therefore, cannot be determined at this time.
Coal Combustion Byproducts
The traditional operating companies currently operate 22 electric generating plants with on-site coal combustion byproducts storage facilities, including both wet (ash ponds) and dry (landfill) storage facilities. In addition to on-site storage, the traditional operating companies also sell a portion of their coal combustion byproducts to third parties for beneficial reuse. Historically, individual states have regulated coal combustion byproducts and the states in the Southern Company systems service territory each have their own regulatory parameters. Each traditional operating company has a routine and robust inspection program in place to ensure the integrity of its coal ash surface impoundments and compliance with applicable regulations.
II-25
MANAGEMENTS DISCUSSION AND ANALYSIS (continued)
Southern Company and Subsidiary Companies 2011 Annual Report
The EPA is currently evaluating whether additional regulation of coal combustion byproducts (including coal ash and gypsum) is merited under federal solid and hazardous waste laws. In June 2010, the EPA published a proposed rule that requested comments on two potential regulatory options for the management and disposal of coal combustion byproducts: regulation as a solid waste or regulation as if the materials technically constituted a hazardous waste. Adoption of either option could require closure of, or significant change to, existing storage facilities and construction of lined landfills, as well as additional waste management and groundwater monitoring requirements. Under both options, the EPA proposes to exempt the beneficial reuse of coal combustion byproducts from regulation; however, a hazardous or other designation indicative of heightened risk could limit or eliminate beneficial reuse options. On January 18, 2012, several environmental organizations notified the EPA of their intent to file a lawsuit over the delay of a final coal combustion byproducts rule unless the EPA finalizes the coal combustion byproducts rule on or before March 19, 2012, which is within 60 days of the date on which the organizations filed their notice of intent to file a lawsuit.
While the ultimate outcome of this matter cannot be determined at this time, and will depend on the final form of any rules adopted and the outcome of any legal challenges, additional regulation of coal combustion byproducts could have a material impact on the generation, management, beneficial use, and disposal of such byproducts. Any material changes are likely to result in substantial additional compliance, operational, and capital costs, as described above, that could affect future unit retirement and replacement decisions. Moreover, the traditional operating companies could incur additional material asset retirement obligations with respect to closing existing storage facilities. Southern Companys results of operations, cash flows, and financial condition could be significantly impacted if such costs are not recovered through regulated rates. Further, higher costs that are recovered through regulated rates could contribute to reduced demand for electricity, which could negatively impact results of operations, cash flows, and financial condition.
Environmental Remediation
The Southern Company system must comply with other environmental laws and regulations that cover the handling and disposal of waste and releases of hazardous substances. Under these various laws and regulations, the Southern Company system could incur substantial costs to clean up properties. The traditional operating companies conduct studies to determine the extent of any required cleanup and have recognized in their respective financial statements the costs to clean up known sites. Amounts for cleanup and ongoing monitoring costs were not material for any year presented. The traditional operating companies have each received authority from their respective state PSCs to recover approved environmental compliance costs through regulatory mechanisms. These rates are adjusted annually or as necessary within limits approved by the state PSCs. The traditional operating companies may be liable for some or all required cleanup costs for additional sites that may require environmental remediation. See Note 3 to the financial statements under Environmental Matters Environmental Remediation for additional information.
Global Climate Issues
Over the past several years, the U.S. Congress has considered many proposals to reduce greenhouse gas emissions and mandate renewable or clean energy. The financial and operational impacts of climate or energy legislation, if enacted, would depend on a variety of factors, including the specific provisions and timing of any legislation that might ultimately be adopted. Federal legislative proposals that would impose mandatory requirements related to greenhouse gas emissions, renewable or clean energy standards, and/or energy efficiency standards are expected to continue to be considered by the U.S. Congress.
In 2007, the U.S. Supreme Court ruled that the EPA has authority under the Clean Air Act to regulate greenhouse gas emissions from new motor vehicles, and, in April 2010, the EPA issued regulations to that effect. When these regulations became effective, carbon dioxide and other greenhouse gases became regulated pollutants under the Prevention of Significant Deterioration (PSD) preconstruction permit program and the Title V operating permit program, which both apply to power plants and other commercial and industrial facilities. In May 2010, the EPA issued a final rule, known as the Tailoring Rule, governing how these programs would be applied to stationary sources, including power plants. The Tailoring Rule requires that new sources that potentially emit over 100,000 tons per year of greenhouse gases and projects at existing sources that increase emissions by over 75,000 tons per year of greenhouse gases must go through the PSD permitting process and install the best available control technology for carbon dioxide and other greenhouse gases. In addition to these rules, the EPA has announced plans to propose a rule setting forth standards of performance for greenhouse gas emissions from new and modified fossil fuel-fired electric generating units in early 2012 and greenhouse gas emissions guidelines for existing sources in late 2012.
Each of the EPAs final Clean Air Act rulemakings have been challenged in the U.S. Court of Appeals for the District of Columbia Circuit. These rules may impact the amount of time it takes to obtain PSD permits for new generation and major modifications to existing generating units and the requirements ultimately imposed by those permits. The ultimate impact of these rules cannot be determined at this time and will depend on the outcome of any legal challenges.
II-26
MANAGEMENTS DISCUSSION AND ANALYSIS (continued)
Southern Company and Subsidiary Companies 2011 Annual Report
International climate change negotiations under the United Nations Framework Convention on Climate Change also continue. In 2009, a nonbinding agreement known as the Copenhagen Accord was reached that included a pledge from countries to reduce their greenhouse gas emissions. The 2011 negotiations established a process for development of a legal instrument applicable to all countries by 2016, to be effective in 2020. The outcome and impact of the international negotiations cannot be determined at this time.
Although the outcome of federal, state, and international initiatives cannot be determined at this time, mandatory restrictions on the Southern Company systems greenhouse gas emissions or requirements relating to renewable energy or energy efficiency at the federal or state level are likely to result in significant additional compliance costs, including significant capital expenditures. These costs could affect future unit retirement and replacement decisions and could result in the retirement of a significant number of coal-fired generating units. See Item 1 BUSINESS Rate Matters Integrated Resource Planning of the Form 10-K for additional information. Also, additional compliance costs and costs related to unit retirements could affect results of operations, cash flows, and financial condition if such costs are not recovered through regulated rates or through PPAs. Further, higher costs that are recovered through regulated rates could contribute to reduced demand for electricity, which could negatively impact results of operations, cash flows, and financial condition.
The new EPA greenhouse gas reporting rule requires annual reporting of carbon dioxide equivalent emissions in metric tons, based on a companys operational control of facilities. Using the methodology of the rule and based on ownership or financial control of facilities, the Southern Company systems 2010 greenhouse gas emissions were approximately 137 million metric tons of carbon dioxide equivalent. The preliminary estimate of the Southern Company systems 2011 greenhouse gas emissions on the same basis is approximately 125 million metric tons of carbon dioxide equivalent. The level of greenhouse gas emissions from year to year will depend on the level of generation and mix of fuel sources, which is determined primarily by demand, the unit cost of fuel consumed, and the availability of generating units.
The Southern Company system is actively evaluating and developing electric generating technologies with lower greenhouse gas emissions. These include, but are not limited to: new nuclear generation, including Plant Vogtle Units 3 and 4; construction of the Kemper IGCC with approximately 65% carbon capture; and renewable investments, including the construction of a biomass plant in Sacul, Texas and Alabama Powers purchase of approximately 400 MWs of energy from renewable sources, including wind energy (some of which remains subject to regulatory approval). In addition, Southern Power completed construction on a solar photovoltaic plant near Cimarron, New Mexico in 2010. The Southern Company system is currently considering additional projects and is pursuing research into the costs and viability of other renewable technologies.
PSC Matters
Alabama Power
Retail Rate Adjustments
On July 12, 2011, the Alabama PSC issued an order to eliminate a tax-related adjustment under Alabama Powers rate structure effective with October 2011 billings. The elimination of this adjustment resulted in additional revenues of approximately $31 million for 2011. In accordance with the order, Alabama Power made additional accruals to the NDR in the fourth quarter 2011 of an amount equal to such additional 2011 revenues. The NDR was impacted as a result of operations and maintenance expenses incurred in connection with the April 2011 storms in Alabama. See Natural Disaster Reserve below for additional information.
Rate RSE
Alabama Power operates under Rate RSE approved by the Alabama PSC. Alabama Powers Rate RSE adjustments are based on forward-looking information for the applicable upcoming calendar year. Rate adjustments for any two-year period, when averaged together, cannot exceed 4.0% and any annual adjustment is limited to 5.0%. Retail rates remain unchanged when the retail return on common equity (ROE) is projected to be between 13.0% and 14.5%. If Alabama Powers actual retail ROE is above the allowed equity return range, customer refunds will be required; however, there is no provision for additional customer billings should the actual retail ROE fall below the allowed equity return range.
II-27
MANAGEMENTS DISCUSSION AND ANALYSIS (continued)
Southern Company and Subsidiary Companies 2011 Annual Report
In 2011, retail rates under Rate RSE remained unchanged from 2010. The expected effect of the Alabama PSC order eliminating a tax-related adjustment, discussed above, is to increase revenues by approximately $150 million beginning in 2012. Accordingly, Alabama Power agreed to a moratorium on any increase in rates in 2012 under Rate RSE. Additionally, on December 1, 2011, Alabama Power made its Rate RSE submission to the Alabama PSC of projected data for calendar year 2012; earnings were within the specified return range, which precluded the need for a rate adjustment under Rate RSE. Under the terms of Rate RSE, the maximum possible increase for 2013 is 5.00%.
Rate CNP
Alabama Powers retail rates, approved by the Alabama PSC, provide for adjustments to recognize the placing of new generating facilities into retail service and the recovery of retail costs associated with certificated PPAs under a rate certificated new plant (Rate CNP). Effective April 2010, Rate CNP was reduced by approximately $70 million annually, primarily due to the expiration in May 2010 of the PPA with Southern Power covering the capacity of Plant Harris Unit 1. Effective on April 1, 2011, Rate CNP was reduced by approximately $5 million annually. It is anticipated that no adjustment will be made to Rate CNP in 2012. As of December 31, 2011, Alabama Power had an under recovered certificated PPA balance of $6 million which is included in deferred under recovered regulatory clause revenues in the balance sheet.
Rate CNP Environmental also allows for the recovery of Alabama Powers retail costs associated with environmental laws, regulations, or other such mandates. Rate CNP Environmental is based on forward-looking information and provides for the recovery of these costs pursuant to a factor that is calculated annually. Environmental costs to be recovered include operations and maintenance expenses, depreciation, and a return on certain invested capital. Retail rates increased approximately 4.3% in January 2010 due to environmental costs. There was no adjustment to Rate CNP Environmental to recover environmental costs in 2011. On December 1, 2011, Alabama Power submitted calculations associated with its cost of complying with environmental mandates, as provided under Rate CNP Environmental. The filing reflected a projected unrecovered retail revenue requirement for environmental compliance, which is to be recovered in the billing months of January 2012 through December 2012. On December 6, 2011, the Alabama PSC ordered that Alabama Power leave in effect for 2012 the factors associated with Alabama Powers environmental compliance costs for the year 2011. Any recoverable amounts associated with 2012 will be reflected in the 2013 filing. As of December 31, 2011, Alabama Power had an under recovered environmental clause balance of $11 million which is included in deferred under recovered regulatory clause revenues in the balance sheet.
Environmental Accounting Order
Proposed and final environmental regulations could result in significant additional compliance costs that could affect future unit retirement and replacement decisions. On September 7, 2011, the Alabama PSC approved an order allowing for the establishment of a regulatory asset to record the unrecovered investment costs associated with any such decisions, including the unrecovered plant asset balance and the unrecovered costs associated with site removal and closure. These costs would be amortized over the affected units remaining useful life, as established prior to the decision regarding early retirement. See Environmental Matters Environmental Statutes and Regulations General herein for additional information regarding environmental regulations.
Natural Disaster Reserve
Based on an order from the Alabama PSC, Alabama Power maintains a reserve for operations and maintenance expenses to cover the cost of damages from major storms to its transmission and distribution facilities. The order approves a separate monthly Rate Natural Disaster Reserve (Rate NDR) charge to customers consisting of two components. The first component is intended to establish and maintain a reserve balance for future storms and is an on-going part of customer billing. The second component of the Rate NDR charge is intended to allow recovery of any existing deferred storm-related operations and maintenance costs and any future reserve deficits over a 24-month period. The Alabama PSC order gives Alabama Power authority to record a deficit balance in the NDR when costs of storm damage exceed any established reserve balance. Alabama Power has discretionary authority to accrue certain additional amounts as circumstances warrant.
As revenue from the Rate NDR charge is recognized, an equal amount of operations and maintenance expenses related to the NDR will also be recognized. As a result, the Rate NDR charge will not have an effect on net income but will impact operating cash flows.
II-28
MANAGEMENTS DISCUSSION AND ANALYSIS (continued)
Southern Company and Subsidiary Companies 2011 Annual Report
In August 2010, the Alabama PSC approved an order enhancing the NDR that eliminated the $75 million authorized limit and allows Alabama Power to make additional accruals to the NDR. The order also allows for reliability-related expenditures to be charged against the additional accruals when the NDR balance exceeds $75 million. Alabama Power may designate a portion of the NDR to reliability-related expenditures as a part of an annual budget process for the following year or during the current year for identified unbudgeted reliability-related expenditures that are incurred. Accruals that have not been designated can be used to offset storm charges. Additional accruals to the NDR will enhance Alabama Powers ability to deal with the financial effects of future natural disasters, promote system reliability, and offset costs retail customers would otherwise bear. The structure of the monthly Rate NDR charge to customers is not altered and continues to include a component to maintain the reserve.
During the first half of 2011, multiple storms caused varying degrees of damage to Alabama Powers transmission and distribution facilities. The most significant storms occurred on April 27, 2011, causing over 400,000 of Alabama Powers 1.4 million customers to be without electrical service. The cost of repairing the damage to facilities and restoring electrical service to customers as a result of these storms was $42 million for operations and maintenance expenses and $161 million for capital-related expenditures.
In accordance with the order that was issued by the Alabama PSC on July 12, 2011 to eliminate a tax-related adjustment under Alabama Powers rate structure that resulted in additional revenues, Alabama Power made additional accruals to the NDR in the fourth quarter 2011 of an amount equal to the additional 2011 revenues, which were approximately $31 million.
The accumulated balance in the NDR for the year ended December 31, 2011 was approximately $110 million.
For the year ended December 31, 2010, Alabama Power accrued an additional $48 million to the NDR, resulting in an accumulated balance of approximately $127 million. Accruals to the NDR are included in the balance sheets under other regulatory liabilities, deferred and are reflected as operations and maintenance expense in the statements of income.
Nuclear Outage Accounting Order
In August 2010, the Alabama PSC approved a change to the nuclear maintenance outage accounting process associated with routine refueling activities. Previously, Alabama Power accrued nuclear outage operations and maintenance expenses for the two units at Plant Farley during the 18-month cycle for the outages. In accordance with the new order, nuclear outage expenses are deferred when the charges actually occur and then amortized over the subsequent 18-month period.
The initial result of implementation of the new accounting order is that no nuclear maintenance outage expenses were recognized from January 2011 through December 2011, which decreased nuclear outage operations and maintenance expenses in 2011 from 2010 by approximately $50 million. During the fall of 2011, approximately $38 million of actual nuclear outage expenses associated with one unit at Plant Farley was deferred to a regulatory asset account; beginning in January 2012, these deferred costs are being amortized to nuclear operations and maintenance expenses over an 18-month period. During the spring of 2012, actual nuclear outage expenses associated with the other unit at Plant Farley will be deferred to a regulatory asset account; beginning in July 2012, these deferred costs will be amortized to nuclear operations and maintenance expenses over an 18-month period. Alabama Power will continue the pattern of deferral of nuclear outage expenses as incurred and the recognition of expenses over a subsequent 18-month period pursuant to the existing order.
Georgia Power
Rate Plans
The economic recession significantly reduced Georgia Powers revenues upon which retail rates were set by the Georgia PSC for 2008 through 2010 (2007 Retail Rate Plan). In 2009, despite stringent efforts to reduce expenses, Georgia Powers projected retail ROE for both 2009 and 2010 was below 10.25%. However, in lieu of a full base rate case to increase customer rates as allowed under the 2007 Retail Rate Plan, in 2009, the Georgia PSC approved Georgia Powers request for an accounting order. Under the terms of the accounting order, Georgia Power could amortize up to $108 million of the regulatory liability related to other cost of removal obligations in 2009 and up to $216 million in 2010, limited to the amount needed to earn no more than a 9.75% and 10.15% retail ROE in 2009 and 2010, respectively. For the years ended December 31, 2009 and 2010, Georgia Power amortized $41 million and $174 million, respectively, of the regulatory liability related to other cost of removal obligations.
In December 2010, the Georgia PSC approved the 2010 ARP, which became effective January 1, 2011. The terms of the 2010 ARP reflect a settlement agreement among Georgia Power, the Georgia PSC Public Interest Advocacy Staff, and eight other intervenors.
II-29
MANAGEMENTS DISCUSSION AND ANALYSIS (continued)
Southern Company and Subsidiary Companies 2011 Annual Report
Under the terms of the 2010 ARP, Georgia Power is amortizing approximately $92 million of its remaining regulatory liability related to other cost of removal obligations over the three years ending December 31, 2013.
Also under the terms of the 2010 ARP, effective January 1, 2011, Georgia Power increased its (1) traditional base tariff rates by approximately $347 million; (2) Demand-Side Management (DSM) tariff rates by approximately $31 million; (3) environmental compliance cost recovery tariff rate by approximately $168 million; and (4) Municipal Franchise Fee (MFF) tariff rate by approximately $16 million, for a total increase in base revenues of approximately $562 million.
Under the 2010 ARP, the following additional base rate adjustments have been or will be made to Georgia Powers tariffs in 2012 and 2013:
| Effective January 1, 2012, the DSM tariffs increased by $17 million; |
| Effective April 1, 2012 and January 1, 2013, the traditional base tariffs will increase by an estimated $122 million and $60 million, respectively, to recover the revenue requirements for the lesser of actual capital costs incurred or the amounts certified by the Georgia PSC for Plant McDonough Units 4, 5, and 6 for the period from commercial operation through December 31, 2013, which also reflects a separate settlement agreement associated with the June 30, 2011 quarterly construction monitoring report for Plant McDonough (see Other Construction below for additional information); |
| Effective January 1, 2013, the DSM tariffs will increase by $18 million; and |
| The MFF tariff will increase consistent with these adjustments. |
Under the 2010 ARP, Georgia Powers retail ROE is set at 11.15%, and earnings will be evaluated against a retail ROE range of 10.25% to 12.25%. Two-thirds of any earnings above 12.25% will be directly refunded to customers, with the remaining one-third retained by Georgia Power. There were no refunds related to earnings for 2011. If at any time during the term of the 2010 ARP, Georgia Power projects that retail earnings will be below 10.25% for any calendar year, it may petition the Georgia PSC for the implementation of an Interim Cost Recovery (ICR) tariff to adjust Georgia Powers earnings back to a 10.25% retail ROE. The Georgia PSC will have 90 days to rule on any such request. If approved, any ICR tariff would expire at the earlier of January 1, 2014 or the end of the calendar year in which the ICR tariff becomes effective. In lieu of requesting implementation of an ICR tariff, or if the Georgia PSC chooses not to implement the ICR, Georgia Power may file a full rate case.
Except as provided above, Georgia Power will not file for a general base rate increase while the 2010 ARP is in effect. Georgia Power is required to file a general rate case by July 1, 2013, in response to which the Georgia PSC would be expected to determine whether the 2010 ARP should be continued, modified, or discontinued.
2011 Integrated Resource Plan Update
See Environmental Matters Environmental Statutes and Regulations Air Quality, Water Quality, and Coal Combustion Byproducts herein and Note 3 to the financial statements under Retail Regulatory Matters Georgia Power Rate Plans for additional information regarding proposed and final EPA rules and regulations, including the MATS rule for coal- and oil-fired electric utility steam generating units, revisions to effluent guidelines for steam electric power plants, and additional regulation of coal combustion byproducts; the State of Georgias Multi-Pollutant Rule; Georgia Powers analysis of the potential costs and benefits of installing the required controls on its fossil generating units in light of these regulations; and the 2010 ARP.
On August 4, 2011, Georgia Power filed an update to its Integrated Resource Plan (2011 IRP Update). The filing included Georgia Powers application to decertify and retire Plant Branch Units 1 and 2 as of December 31, 2013 and October 1, 2013, the compliance dates for the respective units under the Georgia Multi-Pollutant Rule. Georgia Power also requested approval of expenditures for certain baghouse project preparation work at Plants Bowen, Wansley, and Hammond. However, as a result of the considerable uncertainty regarding pending federal environmental regulations, Georgia Power is continuing to defer decisions to add controls, switch fuel, or retire its remaining fleet of coal- and oil-fired generation where environmental controls have not yet been installed, representing approximately 2,600 MWs of capacity. Georgia Power is currently updating its economic analysis of these units based on the final MATS rule and currently expects that certain units, representing approximately 600 MWs of capacity, are more likely than others to switch fuel or be controlled in time to comply with the MATS rule. If the updated economic analysis shows more positive benefits associated with adding controls or switching fuel for more units, it is unlikely that all of the required controls could be completed by April 16, 2015, the compliance date for the MATS rule. As a result, Georgia Power cannot rely on the availability of approximately 2,000 MWs of capacity in 2015. As such, the 2011 IRP Update also includes Georgia Powers application requesting that the Georgia PSC certify the purchase of a total of 1,562 MWs of capacity beginning in 2015 from four PPAs selected through the 2015 request for proposal process.
II-30
MANAGEMENTS DISCUSSION AND ANALYSIS (continued)
Southern Company and Subsidiary Companies 2011 Annual Report
In addition, Georgia Power filed a request with the Georgia PSC on August 4, 2011 for the certification of 562 MWs of certain wholesale capacity that is scheduled to be returned to retail service in 2015 and 2016 under a September 2010 agreement with the Georgia PSC. On January 30, 2012, Georgia Power entered into a stipulation with the Georgia PSC Advocacy Staff to grant the Georgia PSC an extension to the Georgia PSCs termination option date from February 1, 2012 to March 27, 2012. The Georgia PSC can exercise the termination option under specific conditions, such as changes in the cost of compliance with the EPA rules and coal unit retirement decisions.
Under the terms of the 2010 ARP, any costs associated with changes to Georgia Powers approved environmental operating or capital budgets resulting from new or revised environmental regulations through 2013 that are approved by the Georgia PSC in connection with an updated Integrated Resource Plan will be deferred as a regulatory asset to be recovered over a time period deemed appropriate by the Georgia PSC. In connection with the retirement decision, Georgia Power reclassified the retail portion of the net carrying value of Plant Branch Units 1 and 2 from plant in service, net of depreciation, to other utility plant, net. Georgia Power is continuing to depreciate these units using the current composite straight-line rates previously approved by the Georgia PSC and upon actual retirement has requested that the Georgia PSC approve the continued deferral and amortization of the units remaining net carrying value. As a result of this regulatory treatment, the de-certification of Plant Branch Units 1 and 2 is not expected to have a significant impact on Southern Companys financial statements.
The Georgia PSC is expected to vote on these requests in March 2012. The ultimate outcome of these matters cannot be determined at this time.
Fuel Cost Recovery
The traditional operating companies each have established fuel cost recovery rates approved by their respective state PSCs. In previous years, the traditional operating companies experienced volatility in pricing of fuel commodities with higher than expected pricing for coal and uranium and volatile price swings in natural gas. This volatility and higher fuel costs have resulted in total under recovered fuel costs included in the balance sheets of Alabama Power and Georgia Power of approximately $169 million at December 31, 2011. Gulf Power and Mississippi Power collected all previously under recovered fuel costs and, as of December 31, 2011, had a total over recovered fuel balance of approximately $52 million. At December 31, 2010, total under recovered fuel costs included in the balance sheets of Alabama Power, Georgia Power, and Gulf Power were approximately $420 million, and Mississippi Power had a total over recovered fuel balance of approximately $55 million. Fuel cost recovery revenues are adjusted for differences in actual recoverable fuel costs and amounts billed in current regulated rates. Accordingly, changes in the billing factor will not have a significant effect on the Companys revenues or net income, but will affect annual cash flow. The traditional operating companies continuously monitor the under or over recovered fuel cost balances.
See Note 1 to the financial statements under Revenues and Note 3 to the financial statements under Retail Regulatory Matters Alabama Power Fuel Cost Recovery and Retail Regulatory Matters Georgia Power Fuel Cost Recovery, for additional information.
Income Tax Matters
Georgia State Income Tax Credits
Georgia Powers 2005 through 2009 income tax filings for the State of Georgia included state income tax credits for increased activity through Georgia ports. Georgia Power also filed similar claims for the years 2002 through 2004. In 2007, Georgia Power filed a complaint in the Superior Court of Fulton County to recover the credits claimed for the years 2002 through 2004. On June 10, 2011, Georgia Power and the Georgia DOR agreed to a settlement resolving the claims. As a result, Georgia Power recorded additional tax benefits of approximately $64 million and, in accordance with the 2010 ARP, also recorded a related regulatory liability of approximately $62 million. In addition, Georgia Power recorded a reduction of approximately $23 million in related interest expense. See Note 3 under Retail Regulatory Matters Georgia Power Other Construction and Income Tax Matters Georgia State Income Tax Credits for additional information on this regulatory liability.
II-31
MANAGEMENTS DISCUSSION AND ANALYSIS (continued)
Southern Company and Subsidiary Companies 2011 Annual Report
Bonus Depreciation
In September 2010, the Small Business Jobs and Credit Act of 2010 (SBJCA) was signed into law. The SBJCA includes an extension of the 50% bonus depreciation for certain property acquired and placed in service in 2010 (and for certain long-term construction projects placed in service in 2011). Additionally, in December 2010, the Tax Relief, Unemployment Insurance Reauthorization, and Job Creation Act of 2010 (Tax Relief Act) was signed into law. Major tax incentives in the Tax Relief Act include 100% bonus depreciation for property placed in service after September 8, 2010 and through 2011 (and for certain long-term construction projects to be placed in service in 2012) and 50% bonus depreciation for property placed in service in 2012 (and for certain long-term construction projects to be placed in service in 2013), which will have a positive impact on the future cash flows of Southern Company through 2013. Due to the significant amount of estimated bonus depreciation for 2012, tax credit utilization will be reduced. Consequently, it is estimated there will be a positive cash flow benefit of between $400 million and $550 million in 2012.
Construction Program
The subsidiary companies of Southern Company are engaged in continuous construction programs to accommodate existing and estimated future loads on their respective systems. Southern Company intends to continue its strategy of developing and constructing new generating facilities, including natural gas and biomass units at Southern Power, natural gas units and Plant Vogtle Units 3 and 4 at Georgia Power, and the Kemper IGCC at Mississippi Power, as well as adding environmental control equipment and expanding the transmission and distribution systems. For the traditional operating companies, major generation construction projects are subject to state PSC approvals in order to be included in retail rates. While Southern Power generally constructs and acquires generation assets covered by long-term PPAs, any uncontracted capacity could negatively affect future earnings. See Note 7 to the financial statements under Construction Program for estimated construction expenditures for the next three years. In addition, see Note 3 to the financial statements under Retail Regulatory Matters Georgia Power Nuclear Construction, Retail Regulatory Matters Georgia Power Other Construction, and Integrated Coal Gasification Combined Cycle for additional information.
See RISK FACTORS of Southern Company in Item 1A of the Form 10-K for a discussion of certain risks associated with the licensing, construction, and operation of nuclear generating units, including potential impacts that could result from a major incident at a nuclear facility anywhere in the world. The ultimate outcome of these events cannot be determined at this time.
Investments in Leveraged Leases
Southern Company has several leveraged lease agreements, with original terms ranging up to 45 years, which relate to international and domestic energy generation, distribution, and transportation assets. Southern Company receives federal income tax deductions for depreciation and amortization, as well as interest on long-term debt related to these investments. Southern Company reviews all important lease assumptions at least annually, or more frequently if events or changes in circumstances indicate that a change in assumptions has occurred or may occur. These assumptions include the effective tax rate, the residual value, the credit quality of the lessees, and the timing of expected tax cash flows. See Note 1 to the financial statements under Leveraged Leases for additional information.
The recent financial and operational performance of one of Southern Companys lessees and the associated generation assets has raised potential concerns on the part of Southern Company as to the credit quality of the lessee and the residual value of the asset. Southern Company will continue to monitor the performance of the underlying assets and to evaluate the ability of the lessee to continue to make the required lease payments. While there are strategic options that Southern Company may pursue to recover its investment in the leveraged lease, the potential impairment loss that would be incurred if there is an abandonment of the project is approximately $90 million on an after-tax basis. The ultimate outcome of this matter cannot be determined at this time.
Other Matters
Southern Company and its subsidiaries are involved in various other matters being litigated and regulatory matters that could affect future earnings. In addition, Southern Company and its subsidiaries are subject to certain claims and legal actions arising in the ordinary course of business. The business activities of Southern Companys subsidiaries are subject to extensive governmental regulation related to public health and the environment, such as regulation of air emissions and water discharges. Litigation over environmental issues and claims of various types, including property damage, personal injury, common law nuisance, and citizen enforcement of environmental requirements such as air quality and water standards, has increased generally throughout the U.S. In particular, personal injury and other claims for damages caused by alleged exposure to hazardous materials, and common law nuisance claims for injunctive relief and property damage allegedly caused by greenhouse gas and other emissions, have become more frequent.
II-32
MANAGEMENTS DISCUSSION AND ANALYSIS (continued)
Southern Company and Subsidiary Companies 2011 Annual Report
The ultimate outcome of such pending or potential litigation against Southern Company and its subsidiaries cannot be predicted at this time; however, for current proceedings not specifically reported herein or in Note 3 to the financial statements, management does not anticipate that the ultimate liabilities, if any, arising from such current proceedings would have a material effect on Southern Companys financial statements. See Note 3 to the financial statements for a discussion of various other contingencies, regulatory matters, and other matters being litigated which may affect future earnings potential.
On March 11, 2011, a major earthquake and tsunami struck Japan and caused substantial damage to the nuclear generating units at the Fukushima Daiichi generating plant. The events in Japan have created uncertainties that may affect future costs for operating nuclear plants. Specifically, the Nuclear Regulatory Commission (NRC) is performing additional operational and safety reviews of nuclear facilities in the U.S., which could potentially impact future operations and capital requirements. On July 12, 2011, a special NRC task force issued a report with initial recommendations for enhancing nuclear reactor safety in the U.S., including potential changes in emergency planning, onsite backup generation, and spent fuel pools for reactors. The final form and the resulting impact of any changes to safety requirements for nuclear reactors will be dependent on further review and action by the NRC and cannot be determined at this time. See RISK FACTORS of Southern Company in Item 1A of the Form 10-K for a discussion of certain risks associated with the licensing, construction, and operation of nuclear generating units, including potential impacts that could result from a major incident at a nuclear facility anywhere in the world. The ultimate outcome of these events cannot be determined at this time.
ACCOUNTING POLICIES
Application of Critical Accounting Policies and Estimates
Southern Company prepares its consolidated financial statements in accordance with generally accepted accounting principles (GAAP). Significant accounting policies are described in Note 1 to the financial statements. In the application of these policies, certain estimates are made that may have a material impact on Southern Companys results of operations and related disclosures. Different assumptions and measurements could produce estimates that are significantly different from those recorded in the financial statements. Senior management has reviewed and discussed the following critical accounting policies and estimates with the Audit Committee of Southern Companys Board of Directors.
Electric Utility Regulation
Southern Companys traditional operating companies, which comprised approximately 96% of Southern Companys total operating revenues for 2011, are subject to retail regulation by their respective state PSCs and wholesale regulation by the FERC. These regulatory agencies set the rates the traditional operating companies are permitted to charge customers based on allowable costs. As a result, the traditional operating companies apply accounting standards which require the financial statements to reflect the effects of rate regulation. Through the ratemaking process, the regulators may require the inclusion of costs or revenues in periods different than when they would be recognized by a non-regulated company. This treatment may result in the deferral of expenses and the recording of related regulatory assets based on anticipated future recovery through rates or the deferral of gains or creation of liabilities and the recording of related regulatory liabilities. The application of the accounting standards has a further effect on the Companys financial statements as a result of the estimates of allowable costs used in the ratemaking process. These estimates may differ from those actually incurred by the traditional operating companies; therefore, the accounting estimates inherent in specific costs such as depreciation, nuclear decommissioning, and pension and postretirement benefits have less of a direct impact on the Companys results of operations and financial condition than they would on a non-regulated company.
As reflected in Note 1 to the financial statements, significant regulatory assets and liabilities have been recorded. Management reviews the ultimate recoverability of these regulatory assets and liabilities based on applicable regulatory guidelines and GAAP. However, adverse legislative, judicial, or regulatory actions could materially impact the amounts of such regulatory assets and liabilities and could adversely impact the Companys financial statements.
II-33
MANAGEMENTS DISCUSSION AND ANALYSIS (continued)
Southern Company and Subsidiary Companies 2011 Annual Report
Contingent Obligations
Southern Company and its subsidiaries are subject to a number of federal and state laws and regulations, as well as other factors and conditions that subject them to environmental, litigation, income tax, and other risks. See FUTURE EARNINGS POTENTIAL herein and Note 3 to the financial statements for more information regarding certain of these contingencies. Southern Company periodically evaluates its exposure to such risks and, in accordance with GAAP, records reserves for those matters where a non-tax-related loss is considered probable and reasonably estimable and records a tax asset or liability if it is more likely than not that a tax position will be sustained. The adequacy of reserves can be significantly affected by external events or conditions that can be unpredictable; thus, the ultimate outcome of such matters could materially affect Southern Companys financial statements.
Unbilled Revenues
Revenues related to the retail sale of electricity are recorded when electricity is delivered to customers. However, the determination of KWH sales to individual customers is based on the reading of their meters, which is performed on a systematic basis throughout the month. At the end of each month, amounts of electricity delivered to customers, but not yet metered and billed, are estimated. Components of the unbilled revenue estimates include total KWH territorial supply, total KWH billed, estimated total electricity lost in delivery, and customer usage. These components can fluctuate as a result of a number of factors including weather, generation patterns, power delivery volume, and other operational constraints. These factors can be unpredictable and can vary from historical trends. As a result, the overall estimate of unbilled revenues could be significantly affected, which could have a material impact on the Companys results of operations.
Alabama Power is able to determine a significant amount of metered unbilled KWH sales due to the installation of automated meters. At the end of each month, amounts of electricity delivered are read for the customers with automated meters. From this reading, unbilled KWH sales are determined and included in Alabama Powers unbilled revenue calculation. Estimates of unbilled electricity delivered are made when automated meter readings are not available.
Pension and Other Postretirement Benefits
Southern Companys calculation of pension and other postretirement benefits expense is dependent on a number of assumptions. These assumptions include discount rates, healthcare cost trend rates, expected long-term return on plan assets, mortality rates, expected salary and wage increases, and other factors. Components of pension and other postretirement benefits expense include interest and service cost on the pension and other postretirement benefit plans, expected return on plan assets, and amortization of certain unrecognized costs and obligations. Actual results that differ from the assumptions utilized are accumulated and amortized over future periods and, therefore, generally affect recognized expense and the recorded obligation in future periods. While the Company believes that the assumptions used are appropriate, differences in actual experience or significant changes in assumptions would affect its pension and other postretirement benefits costs and obligations.
Key elements in determining Southern Companys pension and other postretirement benefit expense in accordance with GAAP are the expected long-term return on plan assets and the discount rate used to measure the benefit plan obligations and the periodic benefit plan expense for future periods. The expected long-term return on postretirement benefit plan assets is based on Southern Companys investment strategy, historical experience, and expectations for long-term rates of return that consider external actuarial advice. Southern Company determines the long-term return on plan assets by applying the long-term rate of expected returns on various asset classes to Southern Companys target asset allocation. Southern Company discounts the future cash flows related to its postretirement benefit plans using a single-point discount rate developed from the weighted average of market-observed yields for high quality fixed income securities with maturities that correspond to expected benefit payments.
II-34
MANAGEMENTS DISCUSSION AND ANALYSIS (continued)
Southern Company and Subsidiary Companies 2011 Annual Report
The following table illustrates the sensitivity to changes in Southern Companys long-term assumptions with respect to the assumed discount rate, the assumed salaries, and the assumed long-term rate of return on plan assets:
Change in Assumption | Increase/(Decrease) in Total Benefit Expense for 2012 |
Increase/(Decrease) in at December 31, 2011 |
Increase/(Decrease) in at December 31, 2011 | |||
| ||||||
(in millions) | ||||||
25 basis point change in discount rate |
$28/$(26) | $287/$(272) | $54/$(51) | |||
25 basis point change in salaries |
$14/$(14) | $73/$(70) | $-/$- | |||
25 basis point change in long-term return on plan assets |
$20/$(20) | N/A | N/A | |||
|
N/A Not applicable
FINANCIAL CONDITION AND LIQUIDITY
Overview
Southern Companys financial condition remained stable at December 31, 2011. Southern Companys cash requirements primarily consist of funding ongoing operations, common stock dividends, capital expenditures, and debt maturities. Capital expenditures and other investing activities include investments to meet projected long-term demand requirements, to comply with environmental regulations, and for restoration following major storms. Operating cash flows provide a substantial portion of the Southern Company systems cash needs. For the three-year period from 2012 through 2014, Southern Companys projected common stock dividends, capital expenditures, and debt maturities are expected to exceed operating cash flows. Projected capital expenditures in that period include investments to build new generation facilities, to add environmental equipment for existing generating units, and to expand and improve transmission and distribution facilities. Southern Company plans to finance future cash needs in excess of its operating cash flows primarily through debt and equity issuances. Southern Company intends to continue to monitor its access to short-term and long-term capital markets as well as its bank credit arrangements to meet future capital and liquidity needs. See Sources of Capital, Financing Activities, and Capital Requirements and Contractual Obligations herein for additional information.
Southern Companys investments in the qualified pension plan and the nuclear decommissioning trust funds remained stable in value as of December 31, 2011. No contributions to the qualified pension plan were made for the year ended December 31, 2011. No mandatory contributions to the qualified pension plan are anticipated for the year ending December 31, 2012. Southern Company does not expect any material changes to funding obligations to the nuclear decommissioning trust funds prior to 2014.
Net cash provided from operating activities in 2011 totaled $5.9 billion, an increase of $1.9 billion from the corresponding period in 2010. Significant changes in operating cash flow for 2011 as compared to the corresponding period in 2010 include an increase in net income, a contribution to the qualified pension plan in 2010, and a decrease in taxes paid due to bonus depreciation. Net cash provided from operating activities in 2010 totaled $4 billion, an increase of $728 million from the corresponding period in 2009. Significant changes in operating cash flow for 2010 as compared to the corresponding period in 2009 include an increase in net income, a reduction in fossil fuel stock, and an increase in deferred income taxes primarily due to the change in the tax accounting method for repair costs. A contribution to the qualified pension plan partially offset these increases.
Net cash used for investing activities in 2011 totaled $4.2 billion primarily due to property additions to utility plant. Net cash used for investing activities in 2010 totaled $4.3 billion primarily due to property additions to utility plant. Net cash used for investing activities in 2009 totaled $4.3 billion primarily due to property additions to utility plant of $4.7 billion, partially offset by approximately $340 million in cash received from the early termination of two leveraged lease investments.
Net cash used for financing activities totaled $852 million in 2011, compared to $22 million net cash provided from financing activities in 2010. This change was primarily due to a reduction of short-term debt outstanding and redemptions of long-term debt in 2011. Net cash provided from financing activities totaled $22 million in 2010, a decrease of $1.3 billion from the corresponding period in 2009. This decrease was primarily due to redemptions of long-term debt in 2010.
II-35
MANAGEMENTS DISCUSSION AND ANALYSIS (continued)
Southern Company and Subsidiary Companies 2011 Annual Report
Significant balance sheet changes in 2011 include an increase of $3.0 billion in total property, plant, and equipment for the installation of equipment to comply with environmental standards and construction of generation, transmission, and distribution facilities. Other significant changes include an increase in cash of $868 million due to increased cash collection from operations, an increase in deferred income taxes of $1.3 billion due to bonus depreciation and a change in the tax accounting method for repair costs, and $1.4 billion of additional equity.
At the end of 2011, the closing price of Southern Companys common stock was $46.29 per share, compared with a book value of $20.32 per share. The market-to-book value ratio was 228% at the end of 2011, compared with 199% at year-end 2010.
Sources of Capital
Southern Company intends to meet its future capital needs through internal cash flow and external security issuances. Equity capital can be provided from any combination of the Companys stock plans, private placements, or public offerings. The amount and timing of additional equity capital to be raised in 2012, as well as in subsequent years, will be contingent on Southern Companys investment opportunities.
Except as described below with respect to potential U.S. Department of Energy (DOE) loan guarantees, the traditional operating companies and Southern Power plan to obtain the funds required for construction and other purposes from sources similar to those used in the past, which were primarily from operating cash flows, security issuances, term loans, short-term borrowings, and equity contributions from Southern Company. However, the amount, type, and timing of any future financings, if needed, will depend upon prevailing market conditions, regulatory approval, and other factors.
In June 2010, Georgia Power reached an agreement with the DOE to accept terms for a conditional commitment for federal loan guarantees that would apply to future Georgia Power borrowings related to the construction of Plant Vogtle Units 3 and 4. Any borrowings guaranteed by the DOE would be full recourse to Georgia Power and secured by a first priority lien on Georgia Powers 45.7% undivided ownership interest in Plant Vogtle Units 3 and 4. Total guaranteed borrowings would not exceed the lesser of 70% of eligible project costs, or approximately $3.46 billion, and are expected to be funded by the Federal Financing Bank. Final approval and issuance of loan guarantees by the DOE are subject to negotiation of definitive agreements, completion of due diligence by the DOE, receipt of any necessary regulatory approvals, and satisfaction of other conditions. There can be no assurance that the DOE will issue loan guarantees for Georgia Power.
In addition, Mississippi Power has applied to the DOE for federal loan guarantees to finance a portion of the eligible construction costs of the Kemper IGCC. Mississippi Power is in advanced due diligence with the DOE. There can be no assurance that the DOE will issue federal loan guarantees for Mississippi Power. Mississippi Power also received DOE Clean Coal Power Initiative Round 2 grant funds of $245 million that were used for the construction of the Kemper IGCC. An additional $25 million is expected to be received for the initial operation of the Kemper IGCC.
The issuance of securities by the traditional operating companies is generally subject to the approval of the applicable state PSC. The issuance of all securities by Mississippi Power and Southern Power and short-term securities by Georgia Power is generally subject to regulatory approval by the FERC. Additionally, with respect to the public offering of securities, Southern Company and certain of its subsidiaries file registration statements with the Securities and Exchange Commission (SEC) under the Securities Act of 1933, as amended (1933 Act). The amounts of securities authorized by the appropriate regulatory authorities, as well as the securities registered under the 1933 Act, are continuously monitored and appropriate filings are made to ensure flexibility in the capital markets.
Southern Company, each traditional operating company, and Southern Power obtain financing separately without credit support from any affiliate. See Note 6 to the financial statements under Bank Credit Arrangements for additional information. The Southern Company system does not maintain a centralized cash or money pool. Therefore, funds of each company are not commingled with funds of any other company.
Southern Companys current liabilities frequently exceed current assets because of the continued use of short-term debt as a funding source to meet cash needs as well as scheduled maturities of long-term debt. To meet short-term cash needs and contingencies, Southern Company has substantial cash flow from operating activities and access to capital markets, including commercial paper programs which are backed by bank credit facilities.
II-36
MANAGEMENTS DISCUSSION AND ANALYSIS (continued)
Southern Company and Subsidiary Companies 2011 Annual Report
At December 31, 2011, Southern Company and its subsidiaries had approximately $1.3 billion of cash and cash equivalents. Committed credit arrangements with banks at December 31, 2011 were as follows:
Expires(a) | Due Within One Year |
Executable Term-Loans |
||||||||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|||||||||||||||||||||||||||||||||||
Company | 2012 | 2013 | 2014 | 2016 | Total | Unused | Term Out |
No Term Out |
One Year |
Two Years |
||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
||||||||||||||||||||||||||||||||||
(in millions) | (in millions) | (in millions) | (in millions) | |||||||||||||||||||||||||||||||||||||
Southern Company |
$ | $ | $ | $1,000 | $1,000 | $1,000 | $ | $ | $ | $ | ||||||||||||||||||||||||||||||
Alabama Power |
121 | 35 | 350 | 800 | 1,306 | 1,306 | 51 | 71 | 51 | | ||||||||||||||||||||||||||||||
Georgia Power |
| | 250 | 1,500 | 1,750 | 1,745 | | | | | ||||||||||||||||||||||||||||||
Gulf Power |
75 | | 165 | | 240 | 240 | 75 | | 75 | | ||||||||||||||||||||||||||||||
Mississippi Power |
131 | | 165 | | 296 | 296 | 66 | 65 | 25 | 41 | ||||||||||||||||||||||||||||||
Southern Power |
| | | 500 | 500 | 500 | | | | | ||||||||||||||||||||||||||||||
Other |
25 | 25 | | | 50 | 50 | 25 | | 25 | | ||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
||||||||||||||||||||||||||||||||||
Total |
$352 | $60 | $930 | $3,800 | $5,142 | $5,137 | $217 | $136 | $176 | $41 | ||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
(a) | No credit arrangements expire in 2015. |
See Note 6 to the financial statements under Bank Credit Arrangements for additional information.
Most of these arrangements contain covenants that limit debt levels and typically contain cross default provisions that are restricted only to the indebtedness of the individual company. Southern Company and its subsidiaries are currently in compliance with all such covenants.
A portion of the unused credit with banks is allocated to provide liquidity support to the traditional operating companies variable rate pollution control revenue bonds and commercial paper programs. The amount of variable rate pollution control revenue bonds requiring liquidity support as of December 31, 2011 was approximately $1.8 billion.
The traditional operating companies may also meet short-term cash needs through a Southern Company subsidiary organized to issue and sell commercial paper at the request and for the benefit of each of the traditional operating companies. Details of short-term borrowings, excluding notes payable related to other energy service contracts, were as follows:
Short-term Debt at the End of the Period |
Short-term Debt During the Period (a) | |||||||||||
|
|
|||||||||||
Amount Outstanding |
Weighted Average Interest Rate |
Average Outstanding |
Weighted Average Interest Rate |
Maximum Amount Outstanding |
||||||||
|
|
|||||||||||
(in millions) | (in millions) | (in millions) | ||||||||||
December 31, 2011: |
||||||||||||
Commercial paper |
$654 | 0.28% | $697 | 0.29% | $1,586 | |||||||
Short-term bank debt |
200 | 1.18% | 14 | 1.21% | 200 | |||||||
|
|
|||||||||||
Total |
$854 | 0.49% | $711 | 0.32% | ||||||||
|
|
|||||||||||
December 31, 2010: |
||||||||||||
Commercial paper |
$1,295 | 0.32% | $690 | 0.29% | $1,305 | |||||||
|
(a) Average and maximum amounts are based upon daily balances during the period.
Management believes that the need for working capital can be adequately met by utilizing commercial paper programs, lines of credit, and cash.
II-37
MANAGEMENTS DISCUSSION AND ANALYSIS (continued)
Southern Company and Subsidiary Companies 2011 Annual Report
Financing Activities
During 2011, Southern Company issued approximately 21.9 million shares of common stock for $723 million through the Southern Investment Plan and employee and director stock plans. The proceeds were primarily used for general corporate purposes, including the investment by Southern Company in its subsidiaries, and to repay short-term indebtedness. While Southern Company continues to issue additional equity through its employee and director equity compensation plans, Southern Company is not currently issuing additional shares of common stock through the Southern Investment Plan or its employee savings plan. All sales under the Southern Investment Plan and the employee savings plan are currently being funded with shares acquired on the open market by the independent plan administrators.
The following table outlines the debt financing activities for Southern Company, the traditional operating companies, and Southern Power for the year ended December 31, 2011:
Company | Senior Note Issuances |
Senior Note Redemptions and Maturities |
Pollution Control Bond Issuances and Remarketings(*) |
Pollution Control Bond Repurchases, Redemptions, and Maturities |
Other Long- Term Debt Issuances |
Other Long- Term Debt Redemptions and Maturities |
||||||||||||||||||
|
||||||||||||||||||||||||
(in millions) | ||||||||||||||||||||||||
Southern Company |
$ 500 | $ 300 | $ | $ | $ | $ | ||||||||||||||||||
Alabama Power |
700 | 750 | | 4 | | | ||||||||||||||||||
Georgia Power |
550 | 427 | 604 | 339 | 250 | 509 | ||||||||||||||||||
Gulf Power |
125 | | | | | 110 | ||||||||||||||||||
Mississippi Power |
300 | | | | 115 | 130 | ||||||||||||||||||
Southern Power |
575 | 575 | | | | 3 | ||||||||||||||||||
|
||||||||||||||||||||||||
Total |
$ 2,750 | $ 2,052 |