FAA set to begin test flights for Boeing 737 Max as soon as Monday
June 28, 2020 at 16:40 PM EDT
The airborne checks, slated to be conducted in conjunction with Boeing and scheduled to last three days, mark a long awaited milestone for getting the Max fleet back in the air.